Loading...
HomeMy WebLinkAboutNCS000446_Letter of Plan Approval_20201218WATER RESOURCES February 7, 2019 Travis Kelley 2500 Regency Parkway, Suite C8 Cary, NC 27518 Re: Letter of Plan Approval Project Name: Zaxby's @ Nichols Plaza Project Location: Pine Plaza Drive Project Number: 17-032 Submitted By:, Timmons Group Date Submitted: May 1, 2018 The Soil Erosion and Sedimentation Control Plan (S&E) you submitted has been reviewed and accepted. The Town of Apex (Town) hereby issues this Letter of Plan Approval. The Town's S&E program is performance oriented, requiring protection of the natural resources and adjoining properties. If at any time during this project it is determined by Town staff that the approved S&E Plan is inadequate to meet the Town's S&E ordinance, this office may require revisions to the S&E Plan and its implementation to ensure compliance with the S&E ordinance (Section 5- 154). In accordance with Section 5-158 of the Town's S&E ordinance, you are hereby notified that this office has the right to periodically inspect any land -disturbing activities to ensure compliance with the approved S&E Plan and ordinance. You are to notify this office twenty- four (24) hours before starting work. You are also required to keep the working drawings on site. Stormwater runoff generated from sites disturbing more than one (1) acre is permitted pursuant to the National Pollution Discharge Elimination System (NPDES) administered in North Carolina by the Division of Water Quality (DWQ). Attached is the General Stormwater NPDES Permit, NCG010000, reissued on August 1, 2018. You are responsible for complying with the General Permit requirements and are subject to enforcement actions by DWQ for any violations of the General Permit. TOWN OF APEX The Peak of Good Living PO BOX 25o Apex, NC 27502 1 (919) 362-8166 1 www.apexnc.org a"mj Letter of Plan Approval Page 2 of 2 The Contractor will be permitted to clear only as necessary to install the required S&E measures. Once the required S&E measures are installed, contact Public Works staff to schedule an on -site inspection. A Certificate of Compliance will be issued after a site inspection is completed to ensure that the S&E measures are installed per the approved S&E Plan. Please note that a Certificate of Compliance is required prior to receiving a grading permit from the Building Inspections Division. The approval of an S&E Plan is conditioned on the applicant's compliance with Federal and State water quality laws, regulations, and rules. In addition, the Town's NPQES Phase 11 permit requires site contractors to control construction site wastes that may cause adverse water quality impacts. Please have your site contractor review the attached Town Construction Site Waste Management Plan to become familiar with the requirements. Town staff will inspect your site to ensure these waste management practices are being implemented. You will need to provide evidence of compliance if applicable. look forward to working with you on this project and if you have any questions, please call (919) 249-1166. Regards, Stan Fortier, PE Stormwater & Utility Engineering Town OF APEX The Peak of Good Living �, PO Box 25o Apex, NC 27502 1 (919) 362-8166 1 www.apexnc.org