October 25, 2010
Mr. Austin Watts
Kimley-Horn and Associates, Inc.
P.O. Box 33068
Raleigh, NC 27636-3068
DWQ Project # 04-1764, Ver. 4
Wake County
Subject Property: Shiloh Crossing
Ut to Stirrup Iron Creek [030402, 27-33-4-2, C, NSW]
REQUEST FOR MORE INFORMATION
Dear Mr. Watts:
On September 28, 2010, the Division of Water Quality (DWQ) received your permit modification request
dated September 27, 2010, to fill or otherwise impact an additional 75 linear feet of stream (temporary
impact),_and 922 square feet of Zone 1 Neuse River protected riparian buffers, and 1,160 square feet of
Zone 2 Neuse River protected riparian buffers to construct the proposed mixed use development at the site.
The project was last modified on December 17, 2007, and authorized impacts to 0.469 acres of 404/wetland
and 254 linear feet of perennial stream, 18,533 square feet of Zone 1 protected Neuse River basin riparian
buffers, and 19,912 square feet of Zone 2 protected Neuse River basin riparian buffers. The DWQ has
determined that your application was incomplete and/or provided inaccurate information as discussed
below. The DWQ will require additional information in order to process your application to impact
protected wetlands and/or streams on the subject property. Therefore, unless we receive five copies of the
additional information requested below, we will have to move toward denial of your application as required
by 15A NCAC 2H .0506 and will place this project on hold as incomplete until we receive this additional
information. Please provide the following information so that we may continue to review your project.
Additional Information Requested:
1. Please resubmit a formal, joint Pre-Construction Notification application from Wal-Mart Stores
East, LP and MBV Investors, LLC.
Please submit this information within 30 calendar days of the date of this letter. If we do not receive this
requested information within 30 calendar days of the date of this letter, your project will be withdrawn and
you will need to reapply with a new application and a new fee.
This letter only addresses the application review and does not authorize any impacts to wetlands, waters or
protected buffers. Please be aware that any impacts requested within your application are not authorized (at
this time) by the DWQ. Please call Mr. Ian McMillan or Ms. Amy Chapman at 919-733-1786 if you have
any questions regarding or would like to set up a meeting to discuss this matter.
401 Oversight/Express Review Permitting Unit
1650 Mail Service Center, Raleigh, North Carolina 27699-1650
Location: 2321 Crabtree Blvd., Suite 250, Raleigh, North Carolina 27604
Phone: 919-733-17861 FAX: 919-733-6893
Internet: hftp://portal.ncdenr,org/web/wq/ws
An Equal Opportunity 1 Affirmative Action Employer
Kimley-Horn and Associates, Inc.
Page 2 of 2
October 25, 2010
Since y,
Ian McMillan, Acting Supervisor
401 Oversight/Express Review Permitting Unit
IJM
cc: Lauren Witherspoon, DWQ Raleigh Regional Office
Jamie Shern, USACE Raleigh Regulatory Field Office
File Copy
Filename: 041764Ver4ShilohCrossing(Wake)On_Hold