Loading...
HomeMy WebLinkAbout20201712 Ver 1_Shoreline Stabilization_20201217Submission Form Pre -Filing Meeting Information Before submitting this form please ensure you have submitted the Pre -Filing Meeting Request Form as we will not be able to accept your application without this important first step. The Pre -Filing Meeting Request Form is used in accordance with 40 C.F.R. Section 121.4(a) "At least 30 days prior to submitting a certification request, the project proponent shall request a pre -filing meeting with the certifying agency" and in accordance with 40 C.F.R. Section 121.5(b)(7), and (c)(5) all certification requests shall include documentation that a pre -filing meeting request was submitted to the certifying authority at least 30 days prior to submitting the certification request. Click here to read more information on when this form is needed prior to application submission or here to viewthe form. Attach documentation of Pre -Filing Meeting Request here: BoycePreQua1DWQFina1.pdf 51.92KB Pre -fling Meeting or Request Date 11/16/2020 ID# 20201712 Version 1 I. Applicant Information [15A NCAC 02H .0502(a)] Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. Primary Contact Email * mandyrenegarrealestate@gmail.com Rease provide an err -ail address for payment and requests for pure infornation here. Owner Information: Name: * Sarah Boyce Email: * sadieopallady@yahoo.com Phone Number:* (704)827-1431 (xxx)xxx-xxxx Mailing Address:* Street Address 114 The Loop Road Address Line 2 city State / Frovince / Region Mt Holly NC Fbstal / Zip Code Country 28120-9790 US Is there an agent working on the f Yes project?* r No Project Information [15A NCAC 02H .0502(a) & (b)] Project Name:* Boyce If your project has a formal name please use this. If your project does not have a formal name, please identify your project by the owner name and proposed activity (Jones Property Access Road, Smith Guest House, etc.) List in parentheses any other names that have been used to identify the project in the past. 1. Provide a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. r Upload File r Lookup address Property Address Lookup:* Street Address 114 The Loop Road Address Line 2 Latitude:* 35.352259 City State / Province / Region Mt Holly NC Postal / Zip Code Country 28120-9790 US Longitude:*-80.944554 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, structures (buildings, retaining walls, docks, impervious surfaces, etc.), rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram under section 12.normal pool lake level/normal water level* BoyceVrcmityDWQ.pdf 790.48KB Please use the diagram at the link below: https://edocs.deq.nc.gov/WaterResources/0/edoc/616616/Shoreline%2OLayout.docx 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.)* Boycepic.pdf 548.95KB 4. Location of the property (where work is to be conducted) Nearest Town:* Mt Holly County:* Gaston Lake/ river/ ocean adjacent to Mt Island property: Subdivisions name or site address:* none Include phasellot nunber Directions to site:* 150 W, 16 S, Left on Horseshoe Dr, Left on Riverside, Right on The Loop Rd last house Rease include road nacres and nunbers, landrrarks etc. 5. Describe the existing land use or condition of the site at the time of this application:* Residential Fbsidential, undeveloped, etc. 6. Property Size .73 Acres 7. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): Stabilize shoreline with Rip Rap 8. How will the work be done?* V From Land r From Water 9. Total amount of disturbance below the normal pool lake level/ normal water level:* (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) 480 sq ft square feet 10. Total amount of disturbance above the normal pool lake level/ normal water level and 50 feet land -ward: * (including all clearing, backfill, excavation, rip rap, retaining walls, etc.) 240 sq ft square feet 11. Please describe the vegetation above the normal pool lake level/ normal water level and 50 feet landward to be impacted:* (nunber of trees, for instance) none All area disturbed will be mulched Sketch: BoyceSketchDWQ.pdf 461.97KB Application Fee: Once the application has been accepted. You will need to send a corresponding fee in with the appropriate DWR#. The application fee is as follows (pursuant to G.S. 143-215.3D): a $240.00 for impacts to lake (below normal water level) of less than 1 acre a $570.00 for impacts to lake (below normal water level) of greater or equal to 1 acre By digitally signing below, I certify that: a I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief a I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. a I agree that submission of this Shoreline Stabilization online form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); a I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); a 1 understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND o I intend to electronically sign and submit the Shoreline Stabilization online form. Full Name:* Sarah Boyce Signature: Initial Review Is this accepted into the review process?* Project Number:* 20201712 Select Reviewer:* Select Reviewing Office Has payment been received?* What amount is owed?* rYes allo Version:* 1 Alan Johnsomeads\adjohnsonl Mooresville Regional Office - (704) 663-1699 r No Payment Needed r Fee Received r Need Fee - send electronic notification r $240.00 f $570.00 State of North Carolina Department cf Environment and Natural Resources N, ZI_ Division of Water Resources -.... ... ISA NCAC 02H .0500 — Water quality Certification, Shoreline Stabilization FORM: SSGP 02-2017 Please approximately sketch the following information on this plan and provide dimensions for each item: a. All proposed vegetation clearing b. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation C. Location of rip rap or fill to be placed below the Fall Pond/ Normal Water Level elevation d. Location of any proposed structures such as buildings, retaining walls, docks, etc. e. Location of any excavation or dredging hPIMA! }hn F„11 0.,.,A / al- ­I %Ar_ - v a -• .�, , mllul ImmtIiIdt VVdle[ Love! elevation La ke (fat Full Pond/ Normal Water Level) 001 Full Pond/ Normal Water Level ' WAM Shorelineam � r ; � E Plan View FORM: SSGP 02-2017 Page 1 of 3 -Jake (At Full Park/ nrmal Water Side View FORM; SSGP 02-20I7 E S 0 � z cr} 0 U- Lake [ac FAA QuxM/ Normal Wmertxxl} Existing Duck �30 fr>iTk =�- FuilPond/ NormallPlaiarLevel ez� 3 frx 1i0 k s�fwMue€n� ShorMne Riprap a h.150 f, x iczxsa R. .i wotef�lf vead/7u5n add[ional deari� ' li necessary Plan View f Page 2 of 3 oapp f°= ' Printed On: 9/11/2019 _ �F Dtsclalmer: The information provided is net M be considered as a Legal Document or Description. The Map Et parcel Data is believed to be accurate, but Gaston County does not guarantee its accuracy. Values shown are as of January 1, 2019. 14 9 • V � �' � L r �Y All 71 ''✓ rrl �- I� r.KH yr. , '' r ! 0y,f,• F 4 ifi + Zi x.:.. ' 'k f V jo E `err'. �. Primary Property Address 114 THE LOOP RD Tax Information PARCEL #: 176387 PIN #: 4528081786 CURRENT OWNERS: BOYCE SARAH L MAILING ADDRESS: 114 THE LOOP RD , MT HOLLY, NC 28120-0000 JANUARY 1ST OWNERS: BOYCE SARAH L NBHD #: 38035 NBHD NAME: HORSESHOE LAKE ROAD TOWNSHIP: RIVER BEND TOWNSHIP LEGAL DESC:. 14 064A 148 00 000 20 110 Tax Information DEED BOOK: 4554 PAGE: 0044 DEED RECORDING DATE. 3/2/2011 SALES AMOUNT: $0 PLAT BOOK: PAGE. STRUCTURE TYPE: CONTEMPORARY YEAR BUILT: 1972 SQUARE FOOTAGE: 1795 BASEMENT. YES 13ED:3 BATH:2 HALF-BATH:0 MULTI -STRUCTURES: NO ACREAGE:0.73 TAX DISTRICT: LUCIA-RVBEND FD VOLUNTARY AG DISTRICT: NO PROPERTY USE: RESIDENTIAL Tax Values MARKET LAND VALUE: $182,310 MARKET IMPR. VALUE: $167,820 MARKET VALUE: $350,130 FARM DISCOUNT: NO EXEMPTION: NO TAXABLE VALUE: $350,130 Election Information PRECINCT NAME: LUCIA POLLING PLACE: NEW COVENANT UNITED METHODIST POLLING ADDRESS: 14514 LUCIA RIVERBEND HWY WARD #: CONGRESS REPRESENTATIVE: MEMBER PATRICK MCHENRY CONGRESSIONAL DISTRICT: 10 HOUSE REPRESENTATIVE: REPRESENTATIVE JOHN A. TORBETT (REP) HOUSE DISTRICT: 108 SENATOR: SENATOR DAVID L. CURTIS (REP) SENATE DISTRICT: 44 Parcel Information POLICE DISTRICT: GASTON COUNTY FIRE DISTRICT: LUCIA RIVERBEND FLOOD: AE LOCAL WATERSHED: JOHNSON CREEK & CATAWBA CENSUS TRACT: 301.01 Disclaimer: The information provided is not to be considered as a begat document or description. The ma & pa I at isGaston County does not guarantee its accuracy. Values shown are a$ of January 1, 2019. -Document created for printing a It 0!8l2p18te but ID#* 20201712 Version* 1 Regional Office * Mooresville Regional Office - (704) 663-1699 Reviewer List* Alan Johnson Pre -Filing Meeting Request submitted 11/9/2020 Contact Name* Contact Email Address* Project Name* Project Owner* Project County* Owner Address: Gene Renegar renegarconstruction@gmail.com Boyce Shoreline Sarah Boyce Gaston Street Address 114 The Loop Rd Address Line 2 aty Mt Holly Postal/ Zip axle 28120 Is this a transportation project?* r Yes r No State / Province / Region NC Country United States Type(s) of approval sought from the DWR: * 401 Water Quality Certification - F 401 Water Quality Certification - Regular Express * Individual Permit F Modification W Shoreline Stabilization Does this project have an existing project ID#?* C Yes (-- No Do you know the name of the staff member you would like to request a meeting with? Alan Johnson Please give a brief project description below.* Put Rip Rap on shoreline for stabilization on part of shore that does not have rock on it already. Approx 120' Please give a couple of dates you are available for a meeting. 11 /16/2020 11 /17/2020 Please attach the documentation you would like to have the meeting about. SBoyceDWQPrequal.pdf 755.87KB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. 1 understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. 1 also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature 65� ffernw Submittal Date 11/9/2020