Loading...
HomeMy WebLinkAbout20121055 Ver 3_01_EB-5539_PCN Modification Narrative_20201214 kimley-horn.com 421 Fayetteville Street, Suite 600, Raleigh, NC 27601 919 677 2000 December 14, 2020 Mr. Garcy Ward NC Division of Water Resources Transportation Permitting Unit 943 Washington Square Mall Washington, NC 27889 RE: Buffer Authorization Modification – (USACE 2013-00063; DWR # 12-1055) South Tar River Greenway Phase III Extension Project (TIP# EB-5539) Greenville, Pitt County, North Carolina Dear Mr. Ward: On behalf of the City of Greenville, Kimley-Horn is submitting the attached additional information for the above referenced project. The City of Greenville proposes to construct a 10-foot wide, 1.4-mile long paved multi-use greenway/bikeway path with 2-foot gravel shoulders from the western terminus of the existing South Tar River Greenway at Pitt Street (SR 1611) to Moye Boulevard near West 5th Street in Greenville, North Carolina. The project is Phase 3 of a larger greenway project in the City of Greenville. Portions of the protected riparian buffer of the Tar River and a UT to the Tar River will be impacted due to the construction of the greenway path and shoulder, as well as for the installation of a prefabricated pedestrian bridge that will be used to span the UT to the Tar River. The South Tar River Greenway Phase III Project plans have been modified since the issuance of the 404/401 Permit Approvals and Buffer Authorization (USACE SAW 2013-00063; DWR # 12-1055). Plans were modified in one location (Buffer Impact Site 15) due to a portion of the site that has significantly eroded since the project was permitted. The project design plans were revised in order to avoid compromising the future greenway. These changes resulted in a net decrease in the previously authorized buffer impacts. The proposed Site 15 and total buffer impacts from the original permit (2015) and the update revisions (2020) are briefly detailed below (net decrease from permitted total): Buffer Impacts: 2015 Impacts at Site 15 2020 Impacts at Site 15 Buffer Zone 1 147 SF 0 SF Buffer Zone 2 3895 SF 1911 SF Page 2 kimley-horn.com 421 Fayetteville Street, Suite 600, Raleigh, NC 27601 919 677 2000 2015 Total Buffer Impacts 2020 Total Buffer Impacts Net Decrease Buffer Zone 1 13,109 SF 12,962 SF 147 SF Buffer Zone 2 29,071 SF 27,087 SF 1,984 SF The following information has been included as part of this modification request: • Updated Plan Sheets • Revised Permit Impact Drawings If there is any additional information you need to assist in the processing of this modification request, please do not hesitate to contact me at 919-677-2113 or William.Sullivan@Kimley-Horn.com. Sincerely, William Sullivan