Loading...
HomeMy WebLinkAboutWQ0038341_Monitoring - 09-2020_20201106FORM: NDMR 05-16 NON -DISCHARGE MONITORING REPORT (NDMR) Page _ 1 of 2 Permit No.: W00038341 Facility Name: Creekstone Subdivision WWTF County: Iredell Month: September Year: 2020 PPI: 001 Flow Measuring Point: ❑ Influent (1 e i,; ,: i_j No flow generated Parameter Monitoring Point: ❑ influent ❑ Effluent Groundwater lowering _ surface water Parameter Code 0 50050 00310 31616 00610 00625 00620 00600 00400 00665 00530 00076 r 0 Q E O 0 E 0 3 o p 0 E LL76 M o E E Q fJ c 1 0 mZ z ;o 0 0 t-Z a L o a ~ o a. a o c o f- 3N N «o �'- 24-hr hrs GPD mg/L #/100 mL mg1L mg/L rnglL mg/L su mg/L mg/L NTU 1 6,654 2 7,999 3 6,863 4 17:00 0.5 6,529 7.2 <1 _ 5 5,279 61 6,374 7 6,011 _ 8 6,919 _ 9 15:00 2.5 6,303 7.3 < i 10 2,326 11 9,298 121 7,496 _ 13 6,801 _ 14 7,009 15 7,147_---- 16 6,248 17 6,488 _ 181 16:00 1 8,048 1 7.3 <1 19 6,858 _ _ - 20 6,983 - 21 15:30 <1 7,101 7.5 _ <1 22 7,554 23 6,389 <2 600 <.10 1.6 37.7 39.5 7.3 <1 241 5,775 25 7,872 ----- - 26 7.308 --- _._ 27 7,560 28 6,619 -- 29 7,759 ---- - 30 6,389 31 Average: 6,799 1 0.00 600.00 0.00 1.60 37.70 39.50 7,30 0.00 0.00 Daily Maximum: 9,298 2.00 600.00 0.10 1.60 37,70 39.50 7.50 I 7.30 1.00 1,00 Daily Minimum: 2,326 2.00 600.00 0.10 1.60 37.70 39,50 7. 0 7.30 1.00 1.00 Sampling Type: Recorder Grab Grab Grab Grab Grab Grab Grab Grab Grab Recorder Monthly Limit: 29,760 10 14 4 5 Daily Limit: 15 25 6 6-9 10 10 Sample Frequency:1 Continuous Monthly Monthly Monthly Monthly Monthly Monthly 5 X Weel 1ctonl1ily Monthly Continuous j FORM: NDMR 05-16 Sampling Person(s) Name: Brandon Long- TCW Wastewater Name: NON -DISCHARGE MONITORING REPORT (NDMR) Certified Laboratories Name: Pace Analytical-Huntersville NC Name: Page 2 of 2 Does all monitoring data and sampling frequencies meet the requirements in Attachment A of your permit? D Compliant U Non -Compliant If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective —tinnlcl takpn Attnnh nfirtitinnal shcaPts if necessarv. was at 600 so I diverted to the upset pond.Pulled another sample and it came back at <1. Musy have een an error on sample or lab. Operator in Responsible Charge (ORC) Certification Permittee Certification ORC: Brandon Long Permittee: Creekstone Development, LLC Certification No.: SI 991385 Signing Official: Steve Barry Grade: SI Phone Number: 704-776-4443 Signing Official's Title: Owner, Aqwa, Inc. Has the ORC changed since the previous NDMR? ❑ Yes P1 No Phone Numbe . 252-243-7693 Permit Expiration: 6/30/2021 13ra-vtd04'V Lavin 10/29/2020 Signature Date Signature D e By this signature, I certify that this report is accurrate and complete to the best of my knowledge. I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in with a system designed to assure that all qualified personnel properly gathered and evaluated the information accordance submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Resources Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 FORM: NDAR-1 05-16 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page 1 of 3 Permit No.: W00038341 Facility Name: Creekstone Subdivision WWTF County: Iredell Month: September Year: 2020 Did irrigation occur Field Name: A Field Name: B Field Name: C Field Name: D at this facility? Area (acres): 2.17 Area (acres): 3.2 Area (acres): 0,67 Area (acres): 1.27 Cover Crop: Cover CrCrop: Cover Crop: Cover Crop: Q YES ❑ NO Hourly Rate (in): 0.25 Hourly Rate (in): 0.25 Hourly Rate (in): 0.25 Hourly Rate (in): 0.25 Annual Rate (in): 32.79 Annual Rate (in): 32.79 Annual Rate (in): 32.79 Annual Rate (in): 32.79 Weather Freeboard Field Irrigated? (J YES [__'NO j Field Irrigated? [) YES ❑ NO Field Irrigated? [ YES ( No Field Irrigated? E] YES NO a p o t y a E ° a u a m w N H a a m �u �, a C N LO E o E °' �o, o a >Q v °° E� _ rn _ �� D° -.1 E a °' ° _= ��v @ i o J m y d =a o a DQ a d„ E� i= p1 t rn c my 0 o J E rn ?` c E�'v K° p =J ° a 2 3.Q o a >Q a m EtM i_ •°� _ rn 'Tn 0 ro J E rn E�'v X° M g=J m a �� a iQ v E� ~ rn �''v `° ° J E a rn Ego X o° �=J 1 C °F in ft ft gal 3,622 min 59 in 0.06 in 0.06 gal 4,428 min 72 in 0.05 in 0.04 gal min in in gal min in in 2 C 3,628 59 0.06 0.06 4,435 72 0.05 0.04 3 C 3,6 22 59 0.06 0,06 4,068 65 0.05 0.04 4 C 92 3.5 7 2 3,646 59 0,06 0.06 4,456 72 0.05 0.04 5 PC 3,690 _ 59 0,06 0.06 4,510 72 0.05 0.04 6 C 3,732 59 0.06 0.06 4,561 72 0.05 0.04 7 C 3,718 59 0.06 0.06 4,494 71 0.05 0.04 8 C 3,711 59 0,06 0.06 4,172 65 0.05 0.04 9 C 81 10 6 3,713 59 0.06 0.06 4,539 72 0.05 0.04 10 CL 3,723 59 0.06 0.06 4,550 72 0.05 0.04 11 C 3,748 59 0.06 0.06 4,582 72 0.05 0.04 12 PC 3,767 59 0.06 0.06 4,302 66 0.05 0.05 13 R 3,722 59 0.06 0.06 4,434 70 0.05 0.04 14 CL 3,756 59 0.06 0.06 1 4,591 72 0.05 0.04 15 C 3,714 59 0.06 0.06 4,540 72 0.05 0.04 16 C 3,741 59 0.06 0.06 4,572 72 0.05 0.04 17 C 3,761 59 0.06 0.06 4,178 65 0.05 0.04 18 C 77 1 7 3 4,117 59 0.07 0.07 5,031 72 0.06 0.05 19 PC 1 3,665 59 0.06 0.06 4,480 72 0.05 0.04 20 C 3,676 59 0.06 0.06 4,493 72 0.05 0.04 21 C 66 0 7 3 3,989 59 0.07 0.07 4,876 72 0.06 0.05 22 C 3,639 59 0.06 0.06 4,044 65 0.05 0.04 23 R 3,6 00 59 0.06 0.06 4,486 72 0.05 0.04 24 R 3,631 59 0.06 0.06 4,439 72 0.05 0.04 25 CL 3,679 59 0.06 0.06 ' 41497 72 0.05 0.04 26 C 3,681 59 0.06 0.06 4,431 70 0.05 0.04 27 C 3,616 59 0.06 0.06 4,083 66 0.05 0.04 1 28 C 3,690 59 0.06 0.06 4,510 72 0.05 0.04 1 29 C 3,655 59 0.06 0.06 4,468 72 0.05 0.04 30 C 3,663 59 0.06 0,06 4,477 72 0.05 0.04 31 1 0 0 0.00 ,0.00 0 0 0.00 0 00 Monthly Loading: 12 Month Floatingm Total : 111,425 a 1.89 133,727 1.54 1.43 0 k 0.00 `"' .00 FORM: NDAR-1 05-16 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page 2 of 3 Permit No.: W00038341 Facility Name: Creekstone Subdivision WWTF County: Iredell Month: September Year: 2020 Did irrigation occur Field Name: E — Field Name: F Field Name: G Field Name: H at this facility? Area (acres): 1.78 Area (acres): 1.02 Area (acres): 2.45 Area (acres): 1.54 Cover Crop: Cover Crop: Cover Crop: __ Cover Crop: PI YES ❑ No Hourly Rate (in): 0.25 Hourly Rate (in): 0.25 Hourly Rate (in): 0.25 Hourly Rate (in): 0.25 Weather Freeboard Annual Rate (in): Field Irrigated? 32.79 ❑ YES No Annual Rate (in): Field Irrigated? 32.79 ❑ YES No Annual Rate (in): Field Irrigated? 32.79 ❑ YES L N0 Annual Rate (in): Field Irrigated? 32.79 ❑ YES NO l�9 1 U d m C 2 d a E F- OF 0 _ N a y d in A w m ft N .O a m u 0 � ft d E ._ ° oa > Q gal ° d E ~° _ min T J in T °z: x°,� ° 2 ° SL J in d 'O m E2 a o a > 4 gal d d E is F min c >- ,� p o J in E OI �_ c E o x o 0 = J in G� 'p E.2 c o a > 4 gal 'a m Em j= •°: min Ql c L6 p J I in E °1 >, ° c Ewa X° M = J in Em > 4 0 CL~ gal 0d E C min �c v m J in =Tc E50 x o m @= J in 2 CL 3 PC 4 C 5 PC 6 CL 7 R 8 C 9 R — -- 10 11 CL C 12 CL 13 C 14 CL - 15 C 16 C 17 C - 18 C 19- 20 C 21 R -- " 22 C 23 C 24 C — 25 C I-- 26 C 27 C 28 C 29 C ---- - -- - 30 C 31L CL I I I - 0 Monthly Loading: 12 Month Floating Total (in): 0 0-00 0.00 3 O.OU YSr 0 0.00 �� �° „- FORM: NDAR-1 05-16 Page _ 3 of 3 Q Compliant ❑ Non -Compliant Were adequate measures taken to prevent effluent ponding in or runoff from the sites? ❑� Compliant ❑Nen-Compliant Was a suitable vegetative cover maintained on all sites as specified in your permit? Q Compliant ❑Nen-Compliant Were all setbacks listed in your permit maintained for every application to each permitted site? 0 Compliant ❑ Non -Compliant Were all freeboards maintained in accordance with the specified freeboard heights in your permit? Compliant ❑Non -Compliant If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective action(s) taken. Attach additional sheets if necessary. NON -DISCHARGE APPLICATION REPORT (NDAR-1j Did the application rates exceed the limits in Attachment B of your permit? Operator in Responsible Charge (ORC) Certification Permittee Certification ORC: Brandon Long Permittee: Creekstone Development, LLC Certification No.: SI 991385 Signing Official: Steve Barry Grade: SI Phone Number: 704-776-4443 Signing Official's Title: Owner, Aqwa, Inc. Has the ORC changed since the previous NDAR-1? ❑ yes Q No Phone Number: 252-243-7693 Permit Ex P.: 6/30/21 c3ft'a+lz o-w Lang 10/29/2020 for Signature Date Signature Dad By this signature, I certify that this report is accurrate and complete to the best of my knowledge. I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that all qualified personnel property gathered and evaluated the Information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete, I am aware that there are signi rcaril penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Resources Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617