HomeMy WebLinkAboutWQ0038341_Monitoring - 09-2020_20201106FORM: NDMR 05-16
NON -DISCHARGE MONITORING REPORT (NDMR)
Page _ 1 of 2
Permit No.: W00038341
Facility Name: Creekstone Subdivision WWTF
County: Iredell
Month: September
Year: 2020
PPI: 001
Flow Measuring Point: ❑ Influent (1 e i,; ,: i_j No flow generated
Parameter Monitoring Point: ❑ influent ❑ Effluent Groundwater lowering _ surface water
Parameter Code 0
50050
00310
31616
00610
00625
00620
00600
00400
00665
00530
00076
r
0
Q E
O
0
E 0
3
o
p
0
E
LL76
M
o
E
E
Q
fJ
c
1 0
mZ
z
;o
0 0
t-Z
a
L
o a
~ o
a.
a
o c o
f- 3N
N
«o
�'-
24-hr
hrs
GPD
mg/L
#/100 mL
mg1L
mg/L
rnglL
mg/L
su
mg/L
mg/L
NTU
1
6,654
2
7,999
3
6,863
4
17:00
0.5
6,529
7.2
<1
_
5
5,279
61
6,374
7
6,011
_
8
6,919
_
9
15:00
2.5
6,303
7.3
< i
10
2,326
11
9,298
121
7,496
_
13
6,801
_
14
7,009
15
7,147_----
16
6,248
17
6,488
_
181
16:00
1
8,048
1
7.3
<1
19
6,858
_
_
-
20
6,983
-
21
15:30
<1
7,101
7.5
_
<1
22
7,554
23
6,389
<2
600
<.10
1.6
37.7
39.5
7.3
<1
241
5,775
25
7,872
----- -
26
7.308
---
_._
27
7,560
28
6,619
--
29
7,759
----
-
30
6,389
31
Average:
6,799
1 0.00
600.00
0.00
1.60
37.70
39.50
7,30
0.00
0.00
Daily Maximum:
9,298
2.00
600.00
0.10
1.60
37,70
39.50
7.50
I 7.30
1.00
1,00
Daily Minimum:
2,326
2.00
600.00
0.10
1.60
37.70
39,50
7. 0
7.30
1.00
1.00
Sampling Type:
Recorder
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Recorder
Monthly Limit:
29,760
10
14
4
5
Daily Limit:
15
25
6
6-9
10
10
Sample Frequency:1
Continuous
Monthly
Monthly
Monthly
Monthly
Monthly
Monthly
5 X Weel
1ctonl1ily
Monthly
Continuous
j
FORM: NDMR 05-16
Sampling Person(s)
Name: Brandon Long- TCW Wastewater
Name:
NON -DISCHARGE MONITORING REPORT (NDMR)
Certified Laboratories
Name: Pace Analytical-Huntersville NC
Name:
Page 2 of 2
Does all monitoring data and sampling frequencies meet the requirements in Attachment A of your permit? D Compliant U Non -Compliant
If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective
—tinnlcl takpn Attnnh nfirtitinnal shcaPts if necessarv.
was at 600 so I diverted to the upset pond.Pulled another sample and it came back at <1. Musy have een an error on sample or lab.
Operator in Responsible Charge (ORC) Certification
Permittee Certification
ORC: Brandon Long
Permittee: Creekstone Development, LLC
Certification No.: SI 991385
Signing Official: Steve Barry
Grade: SI Phone Number: 704-776-4443
Signing Official's Title: Owner, Aqwa, Inc.
Has the ORC changed since the previous NDMR? ❑ Yes P1 No
Phone Numbe . 252-243-7693 Permit Expiration: 6/30/2021
13ra-vtd04'V Lavin 10/29/2020
Signature Date
Signature D e
By this signature, I certify that this report is accurrate and complete to the best of my knowledge.
I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in
with a system designed to assure that all qualified personnel properly gathered and evaluated the information
accordance
submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for
gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am
aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for
knowing violations.
Mail Original and Two Copies to:
Division of Water Resources
Information Processing Unit
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
FORM: NDAR-1 05-16 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page 1 of 3
Permit No.: W00038341
Facility Name: Creekstone Subdivision WWTF
County: Iredell
Month: September
Year: 2020
Did irrigation occur
Field Name:
A
Field Name:
B
Field Name:
C
Field Name:
D
at this facility?
Area (acres):
2.17
Area (acres):
3.2
Area (acres):
0,67
Area (acres):
1.27
Cover Crop:
Cover CrCrop:
Cover Crop:
Cover Crop:
Q YES ❑ NO
Hourly Rate (in):
0.25
Hourly Rate (in):
0.25
Hourly Rate (in):
0.25
Hourly Rate (in):
0.25
Annual Rate (in):
32.79
Annual Rate (in):
32.79
Annual Rate (in):
32.79
Annual Rate (in):
32.79
Weather
Freeboard
Field Irrigated?
(J YES [__'NO
j Field Irrigated?
[) YES ❑ NO
Field Irrigated?
[ YES ( No
Field Irrigated?
E] YES NO
a
p
o
t
y
a
E
°
a
u
a
m
w
N
H a
a m
�u
�, a
C N
LO
E o
E °'
�o,
o a
>Q
v
°°
E�
_
rn
_
��
D°
-.1
E a °'
° _=
��v
@ i o
J
m y
d
=a
o a
DQ
a
d„
E�
i= p1
t
rn
c
my
0 o
J
E rn
?` c
E�'v
K° p
=J
° a
2
3.Q
o a
>Q
a
m
EtM
i_ •°�
_
rn
'Tn
0 ro
J
E rn
E�'v
X° M
g=J
m a
��
a
iQ
v
E�
~
rn
�''v
`° °
J
E a rn
Ego
X o°
�=J
1
C
°F
in
ft
ft
gal
3,622
min
59
in
0.06
in
0.06
gal
4,428
min
72
in
0.05
in
0.04
gal
min
in
in
gal
min
in
in
2
C
3,628
59
0.06
0.06
4,435
72
0.05
0.04
3
C
3,6 22
59
0.06
0,06
4,068
65
0.05
0.04
4
C
92
3.5
7
2
3,646
59
0,06
0.06
4,456
72
0.05
0.04
5
PC
3,690
_ 59
0,06
0.06
4,510
72
0.05
0.04
6
C
3,732
59
0.06
0.06
4,561
72
0.05
0.04
7
C
3,718
59
0.06
0.06
4,494
71
0.05
0.04
8
C
3,711
59
0,06
0.06
4,172
65
0.05
0.04
9
C
81
10
6
3,713
59
0.06
0.06
4,539
72
0.05
0.04
10
CL
3,723
59
0.06
0.06
4,550
72
0.05
0.04
11
C
3,748
59
0.06
0.06
4,582
72
0.05
0.04
12
PC
3,767
59
0.06
0.06
4,302
66
0.05
0.05
13
R
3,722
59
0.06
0.06
4,434
70
0.05
0.04
14
CL
3,756
59
0.06
0.06
1 4,591
72
0.05
0.04
15
C
3,714
59
0.06
0.06
4,540
72
0.05
0.04
16
C
3,741
59
0.06
0.06
4,572
72
0.05
0.04
17
C
3,761
59
0.06
0.06
4,178
65
0.05
0.04
18
C
77
1
7
3
4,117
59
0.07
0.07
5,031
72
0.06
0.05
19
PC
1
3,665
59
0.06
0.06
4,480
72
0.05
0.04
20
C
3,676
59
0.06
0.06
4,493
72
0.05
0.04
21
C
66
0
7
3
3,989
59
0.07
0.07
4,876
72
0.06
0.05
22
C
3,639
59
0.06
0.06
4,044
65
0.05
0.04
23
R
3,6 00
59
0.06
0.06
4,486
72
0.05
0.04
24
R
3,631
59
0.06
0.06
4,439
72
0.05
0.04
25
CL
3,679
59
0.06
0.06 '
41497
72
0.05
0.04
26
C
3,681
59
0.06
0.06
4,431
70
0.05
0.04
27
C
3,616
59
0.06
0.06
4,083
66
0.05
0.04 1
28
C
3,690
59
0.06
0.06
4,510
72
0.05
0.04 1
29
C
3,655
59
0.06
0.06
4,468
72
0.05
0.04
30
C
3,663
59
0.06
0,06
4,477
72
0.05
0.04
31
1
0
0
0.00
,0.00
0
0
0.00
0 00
Monthly Loading:
12 Month Floatingm Total :
111,425
a
1.89
133,727 1.54
1.43
0
k
0.00
`"'
.00
FORM: NDAR-1 05-16 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page 2 of 3
Permit No.: W00038341
Facility Name: Creekstone Subdivision WWTF
County: Iredell
Month: September
Year: 2020
Did irrigation occur
Field Name:
E
—
Field Name:
F
Field Name:
G
Field Name:
H
at this facility?
Area (acres):
1.78
Area (acres):
1.02
Area (acres):
2.45
Area (acres):
1.54
Cover Crop:
Cover Crop:
Cover Crop:
__
Cover Crop:
PI YES ❑ No
Hourly Rate (in):
0.25
Hourly Rate (in):
0.25
Hourly Rate (in):
0.25
Hourly Rate (in):
0.25
Weather Freeboard
Annual Rate (in):
Field Irrigated?
32.79
❑ YES No
Annual Rate (in):
Field Irrigated?
32.79
❑ YES No
Annual Rate (in):
Field Irrigated?
32.79
❑ YES L N0
Annual Rate (in):
Field Irrigated?
32.79
❑ YES NO
l�9
1
U
d
m
C
2
d
a
E
F-
OF
0
_
N
a
y
d
in
A
w
m
ft
N .O
a m
u
0
�
ft
d
E ._
°
oa
> Q
gal
° d
E
~°
_
min
T
J
in
T
°z:
x°,�
° 2 °
SL J
in
d 'O
m
E2
a
o a
> 4
gal
d d
E is
F
min
c
>-
,�
p o
J
in
E OI
�_ c
E o
x o 0
= J
in
G� 'p
E.2
c
o a
> 4
gal
'a
m
Em
j= •°:
min
Ql
c
L6
p
J
I
in
E °1
>,
° c
Ewa
X° M
= J
in
Em
> 4 0 CL~
gal
0d
E
C
min
�c
v
m
J
in
=Tc
E50
x o m
@= J
in
2
CL
3
PC
4
C
5
PC
6
CL
7
R
8
C
9
R
—
--
10
11
CL
C
12
CL
13
C
14
CL
-
15
C
16
C
17
C
-
18
C
19-
20
C
21
R
-- "
22
C
23
C
24
C
—
25
C
I--
26
C
27
C
28
C
29
C
----
- -- -
30
C
31L
CL I
I
I
-
0
Monthly Loading:
12 Month Floating Total (in):
0 0-00
0.00
3
O.OU
YSr
0
0.00
��
�°
„-
FORM: NDAR-1 05-16
Page _ 3 of 3
Q Compliant ❑ Non -Compliant
Were adequate measures taken to prevent effluent ponding in or runoff from the sites?
❑� Compliant ❑Nen-Compliant
Was a suitable vegetative cover maintained on all sites as specified in your permit?
Q Compliant ❑Nen-Compliant
Were all setbacks listed in your permit maintained for every application to each permitted site? 0 Compliant ❑ Non -Compliant
Were all freeboards maintained in accordance with the specified freeboard heights in your permit?
Compliant ❑Non -Compliant
If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective
action(s) taken. Attach additional sheets if necessary.
NON -DISCHARGE APPLICATION REPORT (NDAR-1j
Did the application rates exceed the limits in Attachment B of your permit?
Operator in Responsible Charge (ORC) Certification Permittee Certification
ORC: Brandon Long Permittee:
Creekstone Development, LLC
Certification No.: SI 991385 Signing Official: Steve Barry
Grade: SI Phone Number: 704-776-4443 Signing Official's Title: Owner, Aqwa, Inc.
Has the ORC changed since the previous NDAR-1? ❑ yes Q No Phone Number: 252-243-7693 Permit Ex
P.: 6/30/21
c3ft'a+lz o-w Lang 10/29/2020
for
Signature Date Signature
Dad
By this signature, I certify that this report is accurrate and complete to the best of my knowledge. I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance
with a system designed to assure that all qualified personnel property gathered and evaluated the Information submitted. Based on my
inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the
information submitted is, to the best of my knowledge and belief, true, accurate, and complete, I am aware that there are signi rcaril
penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations.
Mail Original and Two Copies to:
Division of Water Resources
Information Processing Unit
1617 Mail Service Center
Raleigh, North Carolina 27699-1617