Loading...
HomeMy WebLinkAboutNCC192872_NOT Closeout Documents_20201215North Carolina Department of Environmental Quality Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094 (910) 433-3300 County: Moore Project: Bethesda Forest, Phase One - Lot 3 River basin: Lumber Person financially responsible: H&H Constructors, Inc. -Brian Walker, Division Project #: MOORE-2020-022 Manager & Agent NCC 192872 Address: 2919 Breezewood Avenue, Suite 400, Fayetteville, NC 1. Project Location: Ernest L. Ives Drive, Aberdeen Pictures: No 2. Weather and soil conditions: sunny/workable soils Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Inspection report: Sent Report 9. Corrective action needed: Title: Date given/sent: November 25, 2020 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance with the SPCA and released. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities should be requested by the permittee via a Notice of Termination_ Please note that this correspondence must be uploaded as part of completing the Notice of Termination process. Reported by: Penny Markle Others present: Date of inspection: November 24, 2020 Time arriving on site: 3:00 PM Time leaving site: 3:10 PM cc: