Loading...
HomeMy WebLinkAbout20081832 Ver 2_Stormwater Info_20101015BASS, NIXON & KENNEDY, INC., CONSULTING ENGINEERS 6310 CHAPEL HILL ROAD, SUITE 250, RALEIGH, NC 27607 919/851-4422 ¦ FAX 919/851-8968 BNK@BNKinc.com DOWNSTREAM CHANNEL, CONSTRUCTED WETLANDS AND CONCEPTUAL STORMWATER PLAN CALCULATIONS FOR SOUTHEAST 40 CENTRE RALEIGH, NORTH CAROLINA DEVELOPED BY: APMWvLLC s © !' 029993 n PREPARED By DANNY L. HOWELL, JR.% PE. BASS, NIXON & KENNEDY INC. REV. OCTOBER 15, 201 0 OCT1510+0 80?%-??+O 4: ?? BASS, NIXON & KENNEDY, INC., CONSULTING ENGINEERS ? ; rNk 6310 CHAPEL HILL ROAD, SUITE 250, RALEIGH, NC 27607 4 0 919/8514422 FAX 919/851-8968 www.BNKinc.com 69-7%% CALCULATION NARRATIVE FOR SOUTHEAST 40 CENTRE RALEIGH, NORTH CAROLINA 1. BACKGROUND AND PURPOSE The purpose of this report is to outline the calculations which were performed by Bass, Nixon & Kennedy, Inc. at the project known as Southeast 40 Centre in Raleigh, NC. These calculations are being performed at the request of NC DWQ as part of the resolution of a Notice of Violation (NOV - DWQ Project 08-1832) which was issued for the project. The calculations for this resolution consist of 3 parts: • Channel Velocity Calculations (pre-developed and post-developed) • Constructed Wetlands Design Calculations • Conceptual Stormwater Calculations Per Lot (bioretention areas) The above calculations will have accompanying illustrations and drawings. 2. CHANNEL VELOCITY CALCULATIONS The storm drainage conveyance system for the project collects stormwater from approximately 23 acres of drainage area, which includes all street drainage and a large portion of the lot drainage. Approximately 3.93 acres of impervious surface is included in the 23 acres of drainage (17.1% Impervious). The 23 acres of drainage which are collected into the stormwater conveyance system are discharged at a single discharge point shown as Structure 1 on the approved plans. The discharge point includes an energy dissipater consisting of Class B rip-rap extending from the pipe termination to the start of the Neuse River Buffer. Previous calculations performed by Bass, Nixon & Kennedy, Inc. reflected as-built 2- year velocities in the receiving stream which exceeded levels acceptable to the NC Division of Water Quality. The purpose of the channel calculations included herein is to demonstrate that by rearranging and redirecting drainage areas within the development, velocities in the receiving stream mentioned above can be reduced to approximately pre-developed levels. There are numerous changes that will be required to the approved and constructed plan in order to accomplish the redirection of flow. The changes required will include additional piping, storm drainage inlets, and grading for ditches and are shown on the plans referenced below. Page 2 of 4 October 15, 2010 The following illustrations and attachments are included as part of this calculation: • DRAWING Q1.0 - Pre-developed Drainage Area at Discharge • DRAWING Q1.1 - Post-developed Drainage Area at Discharge • DRAWING Q1.2 - Drainage Areas after Modification (including site changes to redirect flow) • FIGURE 1 - Location of channel section measurement used in calculation • Receiving channel 2-Year velocity calculations after drainage area modification 2.1. Methodology Data was collected about the receiving channel, including channel section and channel/floodplain lining and roughness coefficients. The data was used to determine the velocity and depth of flow in the channel based on Manning's formula for open channel flow. A more detailed breakdown of the channel section and Roughness coefficients is provided in the attached calculations. Flow quantity calculations were calculated based on the Rational Method. The time of concentration was taken from storm drainage conveyance system calculations which were performed as part of the original plan set generation. 2.2. Rational "C" Value Calculation As part of the Stormwater Management Plan approved by the City of Raleigh, no stormwater quantity attenuation was required for the lots which were created by this subdivision; however, each lot is required by the City to reduce its nitrogen export to levels acceptable under City code by limiting the amount of impervious surface, buy- down, stormwater quality treatment, or any combination of the three. Nitrogen export calculations for each lot must include the lot itself and also must account for areas within the public right of way (including impervious surface) along the lot's frontage up to the centerline of that road. Despite the fact that no quantity attenuation is required for these lots, a significant amount of small storm (2-Year) quantity attenuation benefit will likely be provided by the quality treatment measures which may, depending on the nitrogen export calculations, be proposed on each lot (wet ponds, bioretention areas, constructed wetlands, etc). It is therefore assumed that since the channel velocity and normal depth calculations are for the 2-Year storm events, most lots will passively attenuate their post-developed flows to pre-developed levels through the quality measures they may be providing. Furthermore, the owner will require the developer of lots which drain to the existing discharge point 1 (after modifications) to attenuate their post-developed flows to pre-developed levels for the 2-Year event (Lots 2, 3, 4,16, and 17), in order to contribute to the flow reduction to the discharge point. This would be accomplished by using the nitrogen reduction BMP selected for each lot (as part of the City's approved Stormwater Management Plan) to also control quantity and would be provided at time of lot development. On this basis, the Page 3 of 4 October 15, 2010 Rational "C" values were calculated based on the drainage area being comprised of the already constructed street infrastructure and the undeveloped lots. 3. LEVEL SPREADER CALCULATIONS The flows which are redirected away from the single discharge point will be discharged onto Lot 9, which were lots 9-11 on the previously approved subdivision plan. These lots were recombined into a single lot for an end user. Because this lot contains a buffered stream and there is no ephemeral stream between the beginning of the buffered stream and the buffer start, the flow will be diffused by using a level spreader located at the end of the discharge pipe. The level spreader will be designed in accordance with the latest requirements of the NCDWQ Best Management Practices Manual (Chapter 8, 09-28-07 version). The following illustrations and attachments are included as part of this calculation: • DRAWING Q1.2 - Drainage Areas after Modification (shows drainage area to level spreader) • DRAWING D1.0 - Constructed Wetlands Detailed Area Plan • Constructed Wetlands Calculations 4. CONCEPTUAL PER LOT STORMWATER PLAN As part of the resolution to the NOV associated with this project, NC DWQ has requested that the owner provide a conceptual stormwater plan showing a feasible type, size, and location of BMP's for each of the lots in the development. NCDWQ staff has confirmed that this is a conceptual plan and is not binding on the owner or end users with respect to type, size, or location of any BMPs which are required as part of the City of Raleigh's approved stormwater management plan. The stormwater management strategy and plan for this site was approved under the City of Raleigh's delegated program. The approved strategy requires each lot to meet the City's nitrogen export requirements. Lots 2-8, and 16-17 must account for impervious surfaces to the centerline of all streets on which they front such that all impervious surface added as part of the development (including public street and sidewalk) will be accounted for in nutrient export calculations. Lots 1 and 9-14 impervious surfaces to the centerline of all streets were accounted for in the design of the constructed wetlands. Lot 15 has already been constructed and has accounted for the treatment of the street impervious surfaces in a bioretention area. NCDWQ has agreed to accept the City of Raleigh approved stormwater management strategy and also to accept City's review and approval of each individual lot as lots are developed. The following illustrations and attachments are included as part of this calculation: • DRAWING CON1 - BMP Concept Plan showing bioretention areas on undeveloped lots (bioretention areas are shown in concept only. Final type, size, and location of BMPs required by the City's approved stormwater management plan may vary). Page 4 of 4 October 15, 2010 • Bioretention Area Calculations (assuming 85% impervious surface per lot with entire lot draining to bioretention area and 12" ponding depth). 5. PERMITTING OF PLAN CHANGES After a plan to resolve the NOV is approved by NC DWQ, the changes shown will require approval by the City of Raleigh as a revision to previously approved construction drawings and grading permit or may require new construction drawings and grading permit for this work only. Upon NC DWQ approval of this plan, the owner will need to submit plans to the City of Raleigh for approval prior to constructing the approved changes. It is somewhat uncertain as to the timeframe with which these City approvals can be obtained, but it is typical for the approval processes to take 6-8+ weeks. CHANNEL VELOCITY CALCULATIONS SOLItheast 40 Centre Rev: October 15, 2010 FIGURE 1 - .p 00 CA) ! • GGj? K, i I V ?s CHANNEL SECTION ° \? a sss \\ \ \ \? / LOCATION \ ?Q O.- Ak Or pp 03 1 P. p k oi; pP-\ \ \ \\' ?R \\\ \ X \ or ;-d OV - Cr •• OY •• 0'- 0 r- OAeE. INaTEET ? PP \ p 'p• 0 1 04• •• 6b 9 20 BASS, NIXON & KENNEDY, INC. SOUTHEAST 40 CENTRE CONSULTING ENGINEERS CHANNEL SECTION • 6310 CHAPEL HILL ROAD, STE 250, RALEIGH, NORTH CAROLINA 27607 • 3319 HERITAGE TRADE DR, WAKE FOREST, NORTH CAROLINA 27587 TELEPHONE: (919)851-4422 or (800)354-1879 JOB NO. DRAWN BY DATE SHEET OF FAX: (919)851-8968 (RALEIGH), (919)570-1362 (WAKE FOREST) 06839000 JTC 5-12-10 1 1 Pre-Developed Channel Flow Calculation: Rational Method Flow Calculation: Q = CIA Drainage Area: 11.302 acres Rational Coefficient (C): 0.2 Time of Concentration: 5 min Storm Event: 2 yr Rainfall Intensity (1): 5.76 in/hr Flow (Q): 13.02 cfs Manning's Channel Depth of Flow: Channel Manning's n: 0.046 Longitudinal Slope: 0.0055 ft/ft Base Width: 1.75 ft Sideslope: 0.44 :1 Depth of Flow: 2.16 ft Flow: 13.02 cfs Velocity: 2.24 fps Channel Section: Station Elevation 46.71 235.66 48.28 232.06 50.03 232.11 52.13 236.83 Kirpich Time of Concentration Calculation Length of Flow: 1126 ft Highest Point on Length of Flow: 298.5 ft EL. Lowest Point on Length of Flow: 240 ft EL. Change in Height: 58.5 ft Time of Concentration: 5.5 min Channel Section: 238 237 236 52. 1 236. 3, • 3 6.71, 235 35.66 234 233 232 50.0 , 231 232.0 46 47 48 49 50 51 52 53 Sl,fl- Post-Developed Channel Flow Calculation: Rational Method Flow Calculation: Q = CIA Drainage Area: 11.966 acres Rational Coefficient (C): 0.2 Time of Concentration: 6 min Storm Event: 2 yr Rainfall Intensity (1): 5.56 in/hr Flow (Q): 13.31 cfs Manning's Channel Depth of Flow: Channel Manning's n: 0.046 Longitudinal Slope: 0.0055 ft/ft Base Width: 1.75 ft Sideslope: 0.44 :1 Depth of Flow: 2.19 ft Flow: 13.31 cfs Velocity: 2.25 fps Channel Section: Station Elevation 46.71 235.66 48.28 232.06 50.03 232.11 52.13 236.83 Kirpich Time of Concentration Calculation Length of Flow: 1246 ft Highest Point on Length of Flow: 302 ft EL. Lowest Point on Length of Flow: 240 ft EL. Change in Height: 62 ft Time of Concentration: 6.0 min Channel Section: 238 237 38 -? 236. r 3 2 6.71, 235 35.66 234 233 50.0 , 232 . 231 232.06 46 47 48 49 50 51 52 53 Station CONSTRICTED WETLANDS DESIGIN CALCULATIONS, Southeast 40 Centre Rev: October 15, 2010 Water Quality Wetland Calculations Project Name: Southeast 40 Centre - Lot 9 Determine Drainage Area and Impervious Surface Percentage Onsite Drainage Area: 15.72 ac Onsite Impervious Area: 4.94 ac Percent Impervious: 31.4% Calculate the Volume Req uired to Treat the First Flush: Rainfall to Treat: 1 in Runoff Coefficient (Rv) = 0.05 + 0.009*(% Impervious) Runoff Coefficient (RJ: 0.33 in/in Runoff Volume (V) = Rainfall * (R„) * (Drainage Area) Runoff Volume (V): 18,991 cf Determine the Surface Area and Depth of Each Wetland Zone Permanent Pool Elev. (PPE): 247.60 Elev. 1' Above PPE: 248.60 Volume Available at Elev. 1' Above PPE: 26,158 cf based on end area average Depth of Temporary Pool: 1.00 ft Depth of Temporary Pool: 12.00 in Temporary Pool Elevation: 248.60 Total Surface Area Required: 18,991 sf (Runoff Volume / Depth Temp. Pool) Surface Area Provided at Top Temp Pool: 19,080 sf Determine the Orifice Size for 2-5 Dav Drawdown of Temporary Pool: Orifice Invert Elevation: Temporary Pool Elevation: Orifice Diameter: 247.60 248.60 2.00 in Use the orifice equation to determine flow and drawdown time: Orifice Equation: Q = CA(2gh)0.5 Volume to Draw Down: 18,991 cf C: 0.60 g: A: Depth of Temp Pool to CL Orifice (h) Orifice Flow: 32.20 ft/sz 0.02 sf 0.917 ft 0.101 cfs Drawdown Time: 2.186 days (OK - Drawdown is between 2 and 5 days) W J O Z to Q m J J W O 0. W F- _ $ r r r r r r r r r > d O Cl 0 0 0 0 W J W > 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 W O 0 0 O (D CO O (0 0 0 0 - 0 0 (D O J d' LD 0 t` ? t` M CO O (D - N M d" 0 W ,It d' IT IT Ig 'I' ? ? d' LO L) LO LO m IT) N N N N N N N N N N N N N N N Q M d' N N M (0 ? 00 M 00 0 0 0 0 0 W U N t M 0 O c- M LO 0 0 0 0 0 0 v 0 0 0 0 N d' It It d" d" O O O 0 0 a 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 W $ N ° -q q- - N - `t d; d, 't ?t t d: '. CD (N c o (1) q- Ln CD r` Go O ° -p a) a C 70 CL -0 a -o a W r CO LO r 00 r (0 Q (? V Q O (0 M CO ?- O LO qt 'qt N o LO d' O) to 'T 0 0 0 0 0 J Q p `O M r d 00 r r LO r (0 N M M V' Ln ? t- V 0) 'C 'C j > j j N 0 0 0 0 0 W E LO O N N Ln M ('M ? V = O It Cl . -I O (D M co 0) Lo r- ? LO 0 0 0 0 0 O M r N d N M ? I- N > W UL Q W LO LO CD C) M r L() I- co CO co LO Lo V) 0! fA O r' M N P- 00 N d LO O O O O O W a •• O r N d ? 00 O O > r r r- r N a Q O O O O LO LO O LO LO uj q Lo qt C'4 04 0 It 00 Cl) r- M O cc 00 - tl- rl- - - C) - CD co N a ? r r N r ? 00 0 0) r r r r r r N > 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 W (O O O O (A 00 0 (0 0 0 0 0 0 0 0 J It n L (D ? ? ? M M M O r - N M 't LC) W ?i V d 't It It V' LO m m m LO In N N N N N N N N N N N N N N N Wetland Zone Surface Area Percentage Calculations Project Name: Southeast 40 Centre - Lot 9 2007 BMP Manual Requirements: Wetland Zone Depth (in) % o Total Surface Area Deep Pool Foreba 18-36 10 Outlet Area 18-36 5-10 Shallow Land 12 Max 30-40 Shallow Water 3-6 40 Temporary Pool Elevation: Total Surface Area at Temporary Pool: Deep Pools: Forebay Surface Area: Forebay as Percent of Total Surface Area: Outlet Area Surface Area: Outlet Area as Percent of Total Surface Area Shallow Water: Surface Area of 3-6" Depth: Shallow Water as Percent of Total Surface Area: Shallow Land (Only wet during storm event): Surface Area of 12" Depth: Shallow Land as Percent of Total Surface Area: 248.60 19,080 sf 2,090 sf 11.0% OK -area approx 10% 1,395 sf 7.3% OK -area approx 5-10% 8,075 sf 42.3% OK - area approx 40% 7,520 sf 39.4% OK - area approx 40% OF W ATF9 AGIII'Ar a --+ NCDENR ° STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WETLAND SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must be printed, filled out and submitted along with all the required information. I. PROJECT INFORMATION Project name SOUTHEAST 40 CENTRE Contact name DANNY HOWELL, PE Phone number (919) 851-4422 Date October 14, 2010 Drainage area number DRAINAGE AREA #2 II. DESIGN INFORMATION Site Characteristics Drainage area 684,571.00 ft2 Impervious area 215,187.00 ft2 Percent impervious 31.4%% Design rainfall depth 1.00 inch Peak Flow Calculations 1-yr, 24-hr rainfall depth 3.00 in 1-yr, 24-hr intensity 4.52 in/hr Pre-development 1-yr, 24-hr runoff 14.21 ft3/sec Post-development 1-yr, 24-hr runoff 31.26 ft3/sec Pre/Post 1-yr, 24-hr peak control 17.05 ft3lsec Storage Volume: Non-SA Waters Minimum required volume 18,991.00 ft3 Volume provided (temporary pool volume) 19,080.00 ft3 OK Storage Volume: SA Waters Parameters 1.5" runoff volume ft3 Pre-development 1-yr, 24-hr runoff volume ft3 Post-development 1-yr, 24-hr runoff volume ft3 Minimum volume required ft3 Volume provided ft3 Outlet Design Depth of temporary pool/ponding depth (DPI,nts) 12.00 in OK Drawdown time 2.19 days OK Diameter of orifice 2.00 in OK Coefficient of discharge (CD) used in orifice diameter calculation 0.60 (unitless) Driving head (Ho) used in the orifice diameter calculation 0.92 ft OK Form SW401-Wetland-Rev.6-11/16/09 Parts I and II. Project Design Summary, Page 1 of 3 Surface Areas of Wetland Zones Surface Area of Entire Wetland Shallow Land The shallow land percentage is: Shallow Water The shallow water percentage is: Deep Pool Forebay portion of deep pool (pretreatment) The forebay surface area percentage is: Non-forebay portion of deep pool The non-forebay deep pool surface area percentage is: Total of wetland zone areas Add or subtract the following area from the zones Topographic Zone Elevations Temporary Pool Elevation (TPE) Shallow Land (top) Permanent Pool Elevation (PPE) Shallow Water/Deep Pool (top) Shallow Water bottom Most shallow point of deep pool's bottom Deepest point of deep pool's bottom Design must meet one of the following two options: This design meets Option #1, Top of PPE is within 6" of SHWT, If yes: SHWT (Seasonally High Water Table) This design meets Option #2, Wetland has liner with permeability < 0.01 in/hr, If yes: Depth of topsoil above impermeable liner Topographic Zone Depths Temporary Pool Shallow Land Permanent Pool Shallow Water Deep Pool (shallowest) Deep Pool (deepest) Planting Plan Are cattails included in the planting plan? Number of Plants recommended in Shallow Water Area: Herbaceous (4'cubic-inch container) Number of Plants recommended in Shallow Land Area: Herbaceous (4'cubic-inch container), OR Shrubs (1 gallon or larger), OR Trees (3 gallon or larger) and Herbaceous (4+ cubic-inch) Number of Plants provided in Shallow Water Area: Herbaceous (4'cubic-inch container) Number of Plants provided in Shallow Land Area: Herbaceous (4'cubic-inch container) Shrubs (1 gallon or larger) Trees (3 gallon or larger) and Grass-like Herbaceous (4+ cubic-inch) Form SW401-Wetland-Rev.6-11/16/09 19,080.00 ft2 OK 7,520.00 ft2 OK 39%% 8,075.00 ft2 Insufficient shallow water area. 42%% 2,090.00 ft2 OK 11% % 1,395.00 ft2 OK 7%% 19,080.00 ft2 OK 0.00 ft, 248.60 ft amsl 247.60 ft amsl 247.10 ft amsl 246.00 ft amsl 244.60 ft amsl Y (Y or N) 242.60 ft amsl OK N (Y or N) in 12.00 in OK 6.00 in OK 19.20 in OK 36.00 in OK N (Y or N) OK 2,050 1,900 304 38 and 1,520 2,050 OK 305 OK Parts I and II. Project Design Summary, Page 2 of 3 Additional Information Can the design volume be contained? Does project drain to SA waters? If yes, What is the length of the vegetated filter? Are calculations for supporting the design volume provided in the application? Is BMP sized to handle all runoff from ultimate build-out? Is the BMP located in a recorded drainage easement with a recorded access easement to a public Right of Way (ROW)? The length to width ratio is: Approximate wetland length Approximate wetland width Approximate surface area using length and width provided Will the wetland be stabilized within 14 days of construction? Form SW401-Wetland-Rev.6-11/16/09 Y (Y or N) OK N (Y or N) Excess volume must pass through filter. ft Y (Y or N) OK Y (Y or N) OK Y (Y or N) OK 1.86 :1 OK 195.00 ft 105.00 ft 20 ,475.00 ftZ This approx. surface area is within this number of square feet of the entire wetland surface area reported above: Y (Y or N) OK Parts I and II. Project Design Summary, Page 3 of 3 Permit No. (to be provided by DWQ) ill.' REQUIRED CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Initials Page/ Plan 41? Sheet No. 1•Z 0001?0 -+-1. 0 0-? -V. 0 dp? .'?'" ale SW401-Wetland-Rev.6-11 /16/09 1. Plarys i" - 50' or larger) of the entire site showing: esign at ultimate build-out, /Off-site drainage (if applicable), ,#offe'lineated drainage basins (include Rational C coefficient per basin), VNetland dimensions (and length to width ratio), pretreatment system, ,/Maintenance access, Proposed drainage easement and public right of way (ROW), /Overflow device, and vnoundaries of drainage easement. 2. ;?eettl tails (1" = 50' or larger) for the wetland showing: dimensions (and length to width ratio) system, aintenance access, OfIrbsed drainage easement and public right of way (ROW), psi n at ultimate build-out, si drainage (if applicable), WKSgew device, and undaries of drainage easement. wetlands: Shallow land depth, shallow water depth, deep pool depth Option 1, no clay liner: SLWT depth Option 2, clay liner: Depth of topsoil on top of liner, liner specifications 3. Sect n view of the wetland (1" = 20' or larger) showing: VIM slopes, 3:1 or lower etland layers 4. A detailed planting plan (1" = 20' or larger) prepared by a qualified individual showing: t:seof riseveral suitable species (not including cattails), , spacing and locations of plantings, -ief?gy?aritity of each type of plant specified, *017bnUaq " detail, ursery for the plants, and Ilizer and watering requirements to establish vegetation. 5. A construction sequence that shows how the wetland will be protected from sediment until the entire drainage area is stabilized. 6. The supporting calculations (including drawdown calculations). 7. A copy of the signed and notarized operation and maintenance (0&M) agreement. 8. A copy of the deed restrictions (if required). 9. A soils report that is based upon an actual field investigation and soil borings. County soil maps are not an acceptable source of soils information. Part III, page 1 of 1 Permit Number: (to be provided by DWQ) Drainage Area Number: Stormwater Wetland Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: - Immediately after the stormwater wetland is established, the wetland plants will be watered twice weekly if needed until the plants become established (commonly six weeks). - No portion of the stormwater wetland will be fertilized after the first initial fertilization that is required to establish the wetland plants. - Stable groundcover will be maintained in the drainage area to reduce the sediment load to the wet detention basin. - Once a year, a dam safety expert will inspect the embankment. After the wet detention pond is established, I will inspect it once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How I will remediate the problem: The entire BMP Trash/debris is resent. Remove the trash/ debris. The perimeter of the Areas of bare soil and/or Regrade the soil if necessary to wetland erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of long. approximately six inches. The inlet device: pipe or The pipe is clogged (if Unclog the pipe. Dispose of the swale applicable). sediment off-site. The pipe is cracked or Replace the pipe. otherwise damaged (if applicable). Erosion is occurring in the Regrade the swale if necessary to swale (if applicable). smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. Fonn SW401-Wetland O&M-Rev.3 Page 1 of 4 BMP element: The forebay The deep pool, shallow water and shallow land areas Potential problem: Sediment has accumulated in the forebay to a depth that inhibits the forebay from functioning well. Erosion has occurred Weeds are present. Algal growth covers over 50% of the deep pool and shallow water areas. Cattails, phragmites or other invasive plants cover 50% of the deep pool and shallow water areas. Shallow land remains flooded Unclog the outlet device more than 5 days after a immediately. storm event. Plants are dead, diseased or dying. Best professional practices show that pruning is needed to maintain optimal plant health. Sediment has accumulated and reduced the depth to 75% of the original design depth of the deep pools. How I will remediate the Search for the source of the sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Remove the weeds, preferably by hand. If a pesticide is used, wipe it on the plants rather than spravinq. Consult a professional to remove and control the algal growth. Remove the plants by wiping them with pesticide (do not spray) - consult a professional. Determine the source of the problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Prune according to best professional practices. Search for the source of the sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Form SW401-Wetland O&M-Rev.3 Page 2 of 4 BMP element: Potential problem: How I will remediate the problem: The embankment A tree has started to grow on Consult a dam safety specialist to the embankment, remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. The micropool Sediment has accumulated Search for the source of the and reduced the depth to 75% sediment and remedy the problem if of the original design depth. possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Plants are growing in the Remove the plants, preferably by micropool. hand. If a pesticide is used, wipe it on the plants rather than s ra in . The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off-site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919- outlet. 733-1786. Form SW401-Wetland O&M-Rev.3 Page 3 of 4 Permit Number. (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name: Southeast 40 Centre BMP drainage area number:Drainage Area #2 Print name:Allen Pipkin Title:Manager, APMW, LLC Address: 10320-113 Durant Road, Raleigh NC 27614 Phone Signat Date: 1 D l f1 QO C) Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I,Q r a L-) Lehr , a Notary Public for the State of r?.?n? , County of b06.1 do hereby certify that O l e v- I I O Y__I n personally appeared before me this Ih ` day of LAC+bbey- , --?20)0 , and acknowledge the due execution of the forgoing stormwater wetland maintenance requirements. Witness my hand and official seal, . « A, .may SEAL My commission expires Pi _ Iq -,:20B Form SW401-Wetland O&M-Rev.3 Page 4 of 4 PONCEPTUAL ST ORM WA i ER CALCULATIONS PER.LOIT Southeast 40 Centre Rev: October 15, 2010 Conceptual Bioretention Calculations Project Name: Southeast 40 Centre Design Criteria: 2007 DWQ BMP Manual (Updated) Lot Number: 1 Step 1: Determine. Drainage Area and Impervious Surface Drainage Area: Impervious Area: 2.01 ac Assumes Entire Lot as D.A. 1.71 ac 85% of Lot Area Drainage Area Percent Impervious: 85% Step 2: Determine the Volume of Water to Treat Rainfall to Treat: (First Flush) 1 in Runoff Coefficient (Rv) = 0.05 + 0.009*(% Impervious) Runoff Coefficient (Rv): 0.82 in/in Runoff Volume (WQV) = Rainfall * (Rv) * (Drainage Area) Runoff Volume (WQV): 5,955 cf Step 3: Determine the Surface Area and Depth Required Ponding Depth: Required Surface Area: 12.00 in = 1.00 ft 5,955 sf RA2006jobs\06839000\NOV StufflBioretention for Concept PlanAs Conceptual Bioretention Calculations Project Name: Southeast 40 Centre Design Criteria: 2007 DWQ BMP Manual (Updated) Lot Number: 2 Step 1. Determine Drainage Area and Impervious Surface Drainage Area: 1.63 ac Assumes Entire Lot as D.A. Impervious Area: 1.39 ac 85% of Lot Area Drainage Area Percent Impervious: 85% Step 2: D termine the Volume of Water to Treat Rainfall to Treat: (First Flush) 1 in Runoff Coefficient (Rv) = 0.05 + 0.009*(% Impervious) Runoff Coefficient (Rv): 0.82 in/in Runoff Volume (WQV) = Rainfall * (Rv) * (Drainage Area) Runoff Volume (WQV): 4,836 cf Step 3: Determine the Surface Area and Depth Required Ponding Depth: 12.00 in = 1.00 ft Required Surface Area: 4,836 sf RA2006jobs\06839000\NOV StufflBioretention for Concept Plan.xis Conceptual Bioretention Calculations Project Name: Southeast 40 Centre Design Criteria: 2007 DWQ BMP Manual (Updated) Lot Number: 3 Step 1: Determine Drainage Area and Impervious' Surface Drainage Area: 1.74 ac Assumes Entire Lot as D.A. Impervious Area: 1.48 ac 85% of Lot Area Drainage Area Percent Impervious: 85% Step 2: Determine the Volume of Water to Treat Rainfall to Treat: (First Flush) 1 in Runoff Coefficient (Rv) = 0.05 + 0.009*(% Impervious) Runoff Coefficient (Rv): 0.82 in/in Runoff Volume (WQV) = Rainfall * (Rv) * (Drainage Area) Runoff Volume (WQV): 5,134 cf Step 3: Determine the Surface Area and Depth Required Ponding Depth: 12.00 in = Required Surface Area: 5,134 sf 1.00 ft R:\2006jobs\06839000\NOV Stuff\Bioretention for Concept PlanAs Conceptual Bioretention Calculations Project Name: Southeast 40 Centre Design Criteria: 2007 DWQ BMP Manual (Updated) Lot Number: 4 Step 1: Determine Drainage Area and Impervious Surface Drainage Area: 1.36 ac Assumes Entire Lot as D.A. Impervious Area: 1.16 ac 85% of Lot Area Drainage Area Percent Impervious: 85% Step 2: Determine the;Volume of Water to Treat Rainfall to Treat: (First Flush) 1 in Runoff Coefficient (Rv) = 0.05 + 0.009*(% Impervious) Runoff Coefficient (Rv): 0.82 in/in Runoff Volume (WQV) = Rainfall * (Rv) * (Drainage Area) Runoff Volume (WQV): 4,021 cf Step 3: Determine the Surface Area and Depth Required Ponding Depth: 12.00 in = 1.00 ft Required Surface Area: 4,021 sf R:\2006jobs\06839000\NOV Stuft\Bioretention for Concept Plan.xis Conceptual Bioretention Calculations Project Name: Southeast 40 Centre Design Criteria: 2007 DWQ BMP Manual (Updated) Lot Number: 5 Step 1: Determine Drainage Area and Impervious Surface Drainage Area: 1.01 ac Impervious Area: 0.86 ac Drainage Area Percent Impervious: 85% Step 2: Determine the Volume of Water to Treat Rainfall to Treat: (First Flush) 1 in Runoff Coefficient (Rv) = 0.05 + 0.009*(% Impervious) Runoff Coefficient (Rv): 0.82 in/in Runoff Volume (WQV) = Rainfall * (Rv) * (Drainage Area) Runoff Volume (WQV): 2,991 cf Step 3: Determine the Surface Area and Depth Required Ponding Depth: Required Surface Area: Assumes Entire Lot as D.A. 85% of Lot Area 12.00 in = 1.00 ft 2,991 sf RA2006jobs\06839000\NOV Stuff\Bioretention for Concept Plan.xls Conceptual Bioretention Calculations Project Name: Southeast 40 Centre Design Criteria: 2007 DWQ BMP Manual (Updated) Lot Number: 6 Step 1: Determine Drainage Area and Impervious Surface Drainage Area: 1.93 ac Assumes Entire Lot as D.A. Impervious Area: 1.64 ac 85% of Lot Area Drainage Area Percent Impervious: 85% Step 2: Determine the Volume of Water to Treat Rainfall to Treat: (First Flush) 1 in Runoff Coefficient (Rv) = 0.05 + 0.009*(% Impervious) Runoff Coefficient (Rv): 0.82 in/in Runoff Volume (WQV) = Rainfall * (Rv) * (Drainage Area) Runoff Volume (WQV): 5,707 cf Step 3: Determine the Surface Area and Depth Required Ponding Depth: 12.00 in = 1.00 ft Required Surface Area: 5,707 sf RA2006jobs\06839000\NOV Stuff\Bioretention for Concept Plan.xls Conceptual Bioretention Calculations Project Name: Southeast 40 Centre Design Criteria: 2007 DWQ BMP Manual (Updated) Lot Number: 7 Step 1: Determine Drainaae Area and Impervious Surface Drainage Area: 2.47 ac Assumes Entire Lot as D.A. Impervious Area: 2.10 ac 85% of Lot Area Drainage Area Percent Impervious: 85% Step 2: Determine the Volume of Water to Treat Rainfall to Treat: (First Flush) 1 in Runoff Coefficient (Rv) = 0.05 + 0.009*(% Impervious) Runoff Coefficient (Rv): 0.82 in/in Runoff Volume (WQV) = Rainfall * (Rv) * (Drainage Area) Runoff Volume (WQV): 7,305 cf Step 3: Determine the Surface Area and Depth Required Ponding Depth: 12.00 in = 1.00 ft Required Surface Area: 7,305 sf R:\2006jobs\06839000\NOV Stuff\Bioretention for Concept PlanAs Conceptual Bioretention Calculations Project Name: Southeast 40 Centre Design Criteria: 2007 DWQ BMP Manual (Updated) Lot Number: 8 Step 1: Determine Drainage Area and Impervious' Surface Drainage Area: Impervious Area: 2.01 ac Assumes Entire Lot as D.A. 1.71 ac 85% of Lot Area Drainage Area Percent Impervious: 85% Step 2: Determine the'Volume of Water to Treat Rainfall to Treat: (First Flush) 1 in Runoff Coefficient (Rv) = 0.05 + 0.009*(% Impervious) Runoff Coefficient (Rv): 0.82 in/in Runoff Volume (WQV) = Rainfall * (Rv) * (Drainage Area) Runoff Volume (WQV): 5,957 cf Step 3: Determine the Surface Area and Depth Required Ponding Depth: Required Surface Area: 12.00 in = 1.00 ft 5,957 sf R:\2006jobs\06839000\NOV Stuft\Bioretention for Concept Plan.xis Conceptual Bioretention Calculations Project Name: Southeast 40 Centre Design Criteria: 2007 DWQ BMP Manual (Updated) Lot Number: 12 Step 1: Determine Drainage Area and Impervious Surface Drainage Area: 1.94 ac Impervious Area: 1.65 ac Drainage Area Percent Impervious: 85% Step 2: Determine the Volume of Water to Treat Rainfall to Treat: (First Flush) 1 in Runoff Coefficient (Rv) = 0.05 + 0.009*(% Impervious) Runoff Coefficient (Rv): 0.82 in/in Runoff Volume (WQV) = Rainfall * (Rv) * (Drainage Area) Runoff Volume (WQV): 5,742 cf Step 3: Determine the Surface Area and Depth Reauired Ponding Depth: 12.00 in = Required Surface Area: 5,742 sf Assumes Entire Lot as D.A. 85% of Lot Area 1.00 ft RA2006jobs\06839000\NOV Stuff\Bioretention for Concept PlanAs Conceptual Bioretention Calculations Project Name: Southeast 40 Centre Design Criteria: 2007 DWQ BMP Manual (Updated) Lot Number: 13 Step 1: Determine Drainage Area and Impervious Surface Drainage Area: 1.47 ac Assumes Entire Lot as D.A. Impervious Area: 1.25 ac 85% of Lot Area Drainage Area Percent Impervious: 85% Step 2: Determine the Volume of Water to Treat Rainfall to Treat: (First Flush) 1 in Runoff Coefficient (Rv) = 0.05 r 0.009*(% Impervious) Runoff Coefficient (Rv): 0.82 in/in Runoff Volume (WQV) = Rainfall * (Rv) * (Drainage Area) Runoff Volume (WQV): 4,361 cf Step 3: Determine the Surface Area and Depth Required Ponding Depth: 12.00 in = 1.00 ft Required Surface Area: 4,361 sf R:\2006jobs\06839000\NOV Stuff\Bioretention for Concept Plan.xis Conceptual Bioretention Calculations Project Name: Southeast 40 Centre Design Criteria: 2007 DWQ BMP Manual (Updated) Lot Number: 14 Step 1: Determine Drainage Area and Impervious Surface Drainage Area: 1.29 ac Assumes Entire Lot as D.A. Impervious Area: 1.09 ac 85% of Lot Area Drainage Area Percent Impervious: 85% Step 2: Determine the Volume of Water to Treat Rainfall to Treat: (First Flush) 1 in Runoff Coefficient (Rv) = 0.05 + 0.009*(% Impervious) Runoff Coefficient (Rv): 0.82 in/in Runoff Volume (WQV) = Rainfall * (Rv) * (Drainage Area) Runoff Volume (WQV): 3,807 cf Step 3: Determine the Surface Area and Depth Required Ponding Depth: Required Surface Area: 12.00 in = 1.00 ft 3,807 sf R:\2006jobs\06839000\NOV Stuff\Bioretention for Concept Plan.xis Conceptual Bioretention Calculations Project Name: Southeast 40 Centre Design Criteria: 2007 DWQ BMP Manual (Updated) Lot Number: 16 Step 1: Determine Drainage Area and Impervious Surface Drainage Area: 1.40 ac Impervious Area: 1.19 ac Drainage Area Percent Impervious: 85% Step 2: Determine the Volume of Water to Treat Rainfall to Treat: (First Flush) 1 in Runoff Coefficient (Rv) = 0.05 + 0.009*(% Impervious) Runoff Coefficient (Rv): 0.82 in/in Runoff Volume (WQV) = Rainfall * (Rv) * (Drainage Area) Runoff Volume (WQV): 4,153 cf Step 3: Determine the Surface Area and Depth Required Assumes Entire Lot as D.A. 85% of Lot Area Ponding Depth: 12.00 in = 1.00 ft Required Surface Area: 4,153 sf RA2006jobs\06839000\NOV Stuff\Bioretention for Concept PlanAs Conceptual Bioretention Calculations Project Name: Southeast 40 Centre Design Criteria: 2007 DWQ BMP Manual (Updated) Lot Number: 17 Step 1: Determine Drainage Area and Impervious Surface Drainage Area: 1.28 ac Assumes Entire Lot as D.A. Impervious Area: 1.08 ac 85% of Lot Area Drainage Area Percent Impervious: 85% Step 2: Determine the Volume of Water to Treat Rainfall to Treat: (First Flush) 1 in Runoff Coefficient (Rv) = 0.05 + 0.009*(% Impervious) Runoff Coefficient (Rv): 0.82 in/in Runoff Volume (WQV) = Rainfall * (Rv) * (Drainage Area) Runoff Volume (WQV): 3,776 cf Step 3: Determine the Surface Area and Depth Required Ponding Depth: 12.00 in = 1.00 ft Required Surface Area: 3,776 sf R:\2006jobs\06839000\NOV StufflBioretention for Concept PlanAs