Subject: Stormwater Inspection
NCSR 1520 (Rock Road)
DWQ Project No. 09-0403
TIP No. B-4261
Rutherford County
Dear Mr. Swain:
On September 13, 2010, I conducted a stormwater inspection for TIP Project No. B-4261, NCSR 1520 (Rock
Road) in Rutherford County. The monitoring reports for rainfall data and inspection of sediment and erosion
control devices appeared to be in good order.
Continue to ensure that these records are maintained during the life of the project. Please refer to the attachec
inspection report for additional comments and/or recommendations.
If you have questions, please call me at 828-296-4500.
Sinc?erreel/y,,7 p
Michael R. Parker ((//
Environmental Senior Specialist
Attachment
cc: Brian Skeens, P.E.
Roger Bryan, Division 13, DEO
Ed Ingle, Roadside Environmental
Transportation Permitting Unit
!Mike Parker, Asheville Regional Office
NCSR 1520 B4261 September 2010 Stormwater Inspection
n: 2090 U.S. Highway 70, Swannanoa, North Carolina 28778
828-29645001 FAX: 82&299-70431 Customer Service: 1-877-623-6748
: www.ncwaterquality.org
Equal Opportunity t AKrtnative Action Employer
NorthCarolina
Naturally
Form A June 2005
Site inspection form- Construction Stormwater Permit NPDES NCGO10000
Site Name:
DWO R0:
Inspector:
Location:
2, county: (A2)
3. Basin: (A3)
4. Location description: (A4)
7. Land disturbance due to construction/ development?
8. On-site representative available duri
Name(s) z a
Fi_
Till
1. DWQ Inspection date: (A
5. Stream:
(Topographical vicinity map of site is atrachad for case film
9 Erosion and Sedimentation Control Plan (Part I. Section A: No. 2.)
Is a copy of the approved plan on site and available for revlew9
10 Rain Gauge ( Part I Section B. No. 1.1
Is a rain gauge present on the site at the time of inspection?
11 Rain Gauge Data ( Part I. Section B. No. 1.)
Is rain gauge data measured and recorded?
,Data from past 14 da s:
Date
Weak 1 Amount: %V a r : ..c 1'._
Week 2 Date
Amount:
b??uN
C
(Ag) Not _
Inspected-
Not
(Al 0 )? a r No IT
Inspected'
(A11) F, , V s ,Sir- No ='tr nest' ected' 1
3tr!
cy,
l
?x8
,
rte
? JJ
:`i '+vl
1
'L lxa a?
?? ?'
't& t
^ ?Z /
?
Y} Pr:
?
' ',S
??L } ` ?_ LLB ?' 3 x. rt+4i?'! t5 .Q..
:
r
. .' l
vJ .
.>!{/'a
rf .
?
12 Minimum Nionitoring & Record Keeping (Part 1. Section B. No. 3.1
Are inspection records of erosion & sedimentation control facilities complete &
Dates of
14
Week 1
Week 2. Ff
13. Sedimentation impacts to waters
Typical range of sediment depth: (A13a) i i to z
Maximum depth of sediment: (A13b) =.=4 ?r y,.:;
Not
Inspected*
14. Linear ft Of stream impacts,
(A 14) RE-
'15. Photo Documentation: Were photos taken? (A15) vea e=" `-';r No
Photos (I. impacted water, 2. sedimentation depths, 3. sediment control measures, and 4. un-impacted upstream wstefsl
and sketchimep of r1hare photos were taken are attached for case Ile