Loading...
HomeMy WebLinkAbout20090403 Ver 1_Information Letter_20101001 (2)N1? M1, NCDENR North Carolina Department of Environment and Natural Beverly Eaves Perdue Governor Mr. J. J. Swain, Jr., P.E. Division 13 Engineer N.C. Department of Transportation Post Office Box 3279 Asheville, North Carolina 28802 Division of Water Quality Coleen H. Sullins Director October 1, 2010 Resources ?% • wQ %N Fre* 9v re4y -`acy Subject: Stormwater Inspection NCSR 1520 (Rock Road) DWQ Project No. 09-0403 TIP No. B-4261 Rutherford County Dear Mr. Swain: On September 13, 2010, I conducted a stormwater inspection for TIP Project No. B-4261, NCSR 1520 (Rock Road) in Rutherford County. The monitoring reports for rainfall data and inspection of sediment and erosion control devices appeared to be in good order. Continue to ensure that these records are maintained during the life of the project. Please refer to the attachec inspection report for additional comments and/or recommendations. If you have questions, please call me at 828-296-4500. Sinc?erreel/y,,7 p Michael R. Parker ((// Environmental Senior Specialist Attachment cc: Brian Skeens, P.E. Roger Bryan, Division 13, DEO Ed Ingle, Roadside Environmental Transportation Permitting Unit !Mike Parker, Asheville Regional Office NCSR 1520 B4261 September 2010 Stormwater Inspection n: 2090 U.S. Highway 70, Swannanoa, North Carolina 28778 828-29645001 FAX: 82&299-70431 Customer Service: 1-877-623-6748 : www.ncwaterquality.org Equal Opportunity t AKrtnative Action Employer NorthCarolina Naturally Form A June 2005 Site inspection form- Construction Stormwater Permit NPDES NCGO10000 Site Name: DWO R0: Inspector: Location: 2, county: (A2) 3. Basin: (A3) 4. Location description: (A4) 7. Land disturbance due to construction/ development? 8. On-site representative available duri Name(s) z a Fi_ Till 1. DWQ Inspection date: (A 5. Stream: (Topographical vicinity map of site is atrachad for case film 9 Erosion and Sedimentation Control Plan (Part I. Section A: No. 2.) Is a copy of the approved plan on site and available for revlew9 10 Rain Gauge ( Part I Section B. No. 1.1 Is a rain gauge present on the site at the time of inspection? 11 Rain Gauge Data ( Part I. Section B. No. 1.) Is rain gauge data measured and recorded? ,Data from past 14 da s: Date Weak 1 Amount: %V a r : ..c 1'._ Week 2 Date Amount: b??uN C (Ag) Not _ Inspected- Not (Al 0 )? a r No IT Inspected' (A11) F, , V s ,Sir- No ='tr nest' ected' 1 3tr! cy, l ?x8 , rte ? JJ :`i '+vl 1 'L lxa a? ?? ?' 't& t ^ ?Z / ? Y} Pr: ? ' ',S ??L } ` ?_ LLB ?' 3 x. rt+4i?'! t5 .Q.. : r . .' l vJ . .>!{/'a rf . ? 12 Minimum Nionitoring & Record Keeping (Part 1. Section B. No. 3.1 Are inspection records of erosion & sedimentation control facilities complete & Dates of 14 Week 1 Week 2. Ff 13. Sedimentation impacts to waters Typical range of sediment depth: (A13a) i i to z Maximum depth of sediment: (A13b) =.=4 ?r y,.:; Not Inspected* 14. Linear ft Of stream impacts, (A 14) RE- '15. Photo Documentation: Were photos taken? (A15) vea e=" `-';r No Photos (I. impacted water, 2. sedimentation depths, 3. sediment control measures, and 4. un-impacted upstream wstefsl and sketchimep of r1hare photos were taken are attached for case Ile 16. Notes: 1-4