Loading...
HomeMy WebLinkAbout20090859 Ver 1_Stormwater Info_20101007Page 1 of 1 L urban design planning civil engineering branding landscape architecture TRANSMITTAL 223 North Graham Street, Charlotte, NC 28202 V: 704.333.0325 F: 704.332.3246 ?q-085°1 DATE: 10/5/2010 PROJECT NAME: 1009025 CHARLOTTE PIPE-OAKMONT TO: Annette Lucas Division of Water Quality 401 Oversight/Express Review Permitting Unit 1650 Mail Service Center Raleigh, NC 27604 annette.lucas@ncmail.net PROJECT #: 1009025 OCT R59TOWN90 7 Ulm FROM: Matt Bramwell mbramwell@landdesign.com CC: DENR - WATER QUAUTy WETLANDS AND STORM-WATER BRANCH WE ARE SENDING: Charlotte Pipe and foundry - Oakboro Site VIA: Overnight PURPOSE: For your approval Quantity Dated Description 2 Set of construction documents 2 Copies of calculations book 1 Wet Pond #1 Supplemental form and Maintenance agreement 1 Wet Pond #2 Supplemental form and Maintenance agreement 1 Level Spreader Supplemental form and Maintenance agreement 1 Copy of soils report NOTES: Annette, We are submitting stormwater plans for you approval in order to obtain our 401/404 permit, which is contingent on your approval. We have submitted these same plans to the Mooresville office for a grading permit. I have attached a copy of the 401 permit for your reference. Please do not hesitate to give me a call at 704-376-7777 or email me at mbramwell@landdesign.com if should have any questions. Thank you, Matt Bramwell, PE It this document was delivered via FAX, the accompanying transmission contains confidential information intended only for the use of the individual of the entity named above. If you are not the intended recipient, you are hereby notified that any disclosure, copying, distribution or the taking of any action in reliance on the contents of this facsimile information is strictly prohibited. It you have waived this FAX in error, please Immediately notify us by telephone to arrange for disposition or return of the documents to us. Charlotte NC Washington DC Tampa FL Asheville NC Pinehurst NC Charlotte NC Nashville TN Beijing PRC about:blank 10/5/2010 Permit (to be provided by DWQ) OF WATER A?? hO o WDEW r STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information. Project name CHARLOTTE PIPE AND FOUNDRY Contact person MATT BRAMWELL Phone number 704-3776-7777 Date 7/6/2010 Drainage area number POND #1 N_ Site Characteristics Drainage area 1,758,082 ft2 Impervious area, post-development 774,061 ft2 % impervious 44.03% Design rainfall depth 1.0 in Storage Volume: Non-SA Waters Minimum volume required Volume provided Storage Volume: SA Waters 1.5' runoff volume Pre-development 1-yr, 24-hr runoff Post-development 1-yr, 24-hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the pre/post control of the 1 yr 24hr storm peak flow required? 1-yr, 24-hr rainfall depth Rational C, pre-development Rational C, post-development Rainfall intensity: 1 -yr, 24-hr storm Pre-development 1-yr, 24-hr peak flow Post-development 1-yr, 24-hr peak flow Pre/Post 1-yr, 24-hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the perm. pool elevation) Top of 1 Oft vegetated shelf elevation Bottom of 1 Oft vegetated shelf elevation Sediment cleanout, top elevation (bottom of pond) Sediment cleanout, bottom elevation Sediment storage provided Is there additional volume stored above the state-required temp. pool? Elevation of the top of the additional volume 65,380 ft3 OK 124,218 ft3 OK, volume provided is equal to or in excess of volume required. ft3 ft3 ft3 ft3 ft3 (Y or N) in (unitless) (unitless) in/hr ft3/sec ft3/sec ft3/sec 518.50 fmsl 516.00 fmsl fmsl 516.50 fmsl 515.50 fmsl Data not needed for calculation option #1, but OK if provided. 511.00 fmsl 510.00 fmsl Data not needed for calculation option #1, but OK if provided. 1.00 It (Y or N) 518.5 fmsl OK Form SW401-Wet Detention Basin-Rev.8.9/17/09 Parts I. & II. Design Summary, Page 1 of 2 Permit No. (to be provided by DWO) ATM Surface Areas Area, temporary pool 53,558 ft2 Area REQUIRED, permanent pool 36,920 ft2 SA/DA ratio 2.10 (unitless) Area PROVIDED, permanent pool, Apen-pw, 44,036 ftz OK Area, bottom of 1 Oft vegetated shelf, k shed 39,937 ftz Area, sediment cleanout, top elevation (bottom of pond), Abo,_pond 25,288 ft2 Volumes Volume, temporary pool Volume, permanent pool, Vpertn_po, Volume, forebay (sum of forebays if more than one forebay) Forebay % of permanent pool volume SA/DA Table Data Design TSS removal Coastal SA/DA Table Used? Mountain/Piedmont SA/DA Table Used? SA/DA ratio Average depth (used in SA/DA table): Calculation option 1 used? (See Figure 10.2b) Volume, permanent pool, Vpen-pwi Area provided, permanent pool, Aperm_PWI Average depth calculated Average depth used in SA/DA, cl V, (Round to nearest 0.5ft) Calculation option 2 used? (See Figure 10.2b) Area provided, permanent pool, Amrmyw, Area, bottom of 1 Oft vegetated shelf, k, Shea Area, sediment cleanout, top elevation (bottom of pond), Ate,_,nd "Depth" (distance b/w bottom of 1 Oft shelf and top of sediment) Average depth calculated Average depth used in SA/DA, day, (Round to nearest 0.5ft) Drawdown Calculations Drawdown through orifice? Diameter of orifice (if circular) Area of orifice (if-non-circular) Coefficient of discharge (CD) Driving head (Ho) Drawdown through weir? Weir type Coefficient of discharge (C.) Length of weir (L) Driving head (H) Pre-development 1-yr, 24-hr peak flow Post-development 1-yr, 24-hr peak flow Storage volume discharge rate (through discharge orifice or weir) Storage volume drawdown time Additional Information Vegetated side slopes Vegetated shelf slope Vegetated shelf width Length of flowpath to width ratio Length to width ratio Trash rack for overflow & orifice? Freeboard provided Vegetated filter provided? Recorded drainage easement provided? Capures all runoff at ultimate build-out? Drain mechanism for maintenance or emergencies is: Form SW401-Wet Detention Basin-Rev.8-9/17/09 124,218 ft3 OK 207,285 ft' 38,471 ft3 18.6% % OK 90% N (Y or N) Y (Y or N) 2.10 (unitless) Y (Y or N) 207,285 ft3 44,036 ft2 4.70 ft OK 4.5 ft OK N (Y or N) 44,036 ft2 39,937 ft' 25,288 ft2 4.50 ft ft ft Y (Y or N) 4.00 in in2 0.60 (unitless) 2.33 ft N (Y or N) (unitless) (unitless) ft ft ft3/sec ft3/sec ft3/sec 4.11 days OK, draws down in 2-5 days. 3 :1 OK 10 :1 OK 10.0 ft OK 3 :1 OK 2.0 :1 OK Y (Y or N) OK 1.0 ft OK N (Y or N) OK Y (Y or N) OK Y (Y or N) OK PUMP OUT Parts I. 8 II. Design Summary, Page 2 of 2 Permit No (to be provided by DWQ) Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Page/ Plan Initials Sheet No. Mw?!-2.0 1. Plans (1" 50' or larger) of the entire site showing: Design at ultimate build-out, Off-site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Basin dimensions, Pretreatment system, High flow bypass system, Maintenance access, Proposed drainage easement and public right of way (ROW), Overflow device, and Boundaries of drainage easement. t?t?' -2. 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing: Outlet structure with trash rack or similar, Maintenance access, Permanent pool dimensions, Forebay and main pond with hardened emergency spillway, Basin cross-section, Vegetation specification for planting shelf, and Filter strip. ,M±?1 ?- 2 • 3. Section view of the wet detention basin (1" = 20' or larger) showing: Side slopes, 3:1 or lower, Pretreatment and treatment areas, and Inlet and outlet structures. r? ?3 6-2.1 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. IK?r? • 2.1 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, to verify volume provided. -1. Z 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. L, a i3**K 7. The supporting calculations. vl? 18 ; 1'h 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. 9. A copy of the deed restrictions (if required). r'`• M00 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. Form SW401-Wet Detention Basin-Rev.8-9/17/09 Part III. Required Items Checklist, Page 1 of 1 Permit Number: (to be provided by DWQ) Drainage Area Number: Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): ? does ® does not incorporate a vegetated filter at the outlet. This system (check one): ? does ® does not incorporate pretreatment other than a forebay. Important maintenance procedures: - Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). - No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. - Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. - If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. - Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How I will remediate the problem: The entire BMP Trash/debris is resent. Remove the trash/debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of long. approximately six inches. Form SW401-Wet Detention Basin O&M-Rev.4 Page 1 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potential problem: How I will remediate the problem: The inlet device: pipe or The pipe is clogged. Unclog the pipe. Dispose of the swale sediment off-site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to swale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over Consult a professional to remove 50% of the area. and control the algal growth. Cattails, phragmites or other Remove the plants by wiping them invasive plants cover 50% of with pesticide (do not spray). the basin surface. Form SW401-Wet Detention Basin O&M-Rev.4 Page 2 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potential problem: How I will rernediate the problem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. (if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off-site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 516.00 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 516.00 feet in the forebay, the sediment shall be removed. BASIN DIAGRAM (fill in the blanks) 0 Permanent Pool Elevation 516.00 Sediment Removal .511.00 Pe anen Pool -- - - - - - - - - - - - - - - Volume Sediment-Removal Elevation-511.00 - - -- - -- --Volume -- --- --- --------------------------- L_f?tl Bottom E evatio 510.00 -ft Min. Sediment Bottom Elevation 510.00 Storage Sedimet Storage FOREBAY MAIN POND Form SW401-Wet Detention Basin O&M-Rev.4 Page 3 of 4 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:CHARLOTTE PIPE AND FOUNDRY BMP drainage area number:POND #1 Print name:David Waggoner Title: Environmental Manager Address:PO Box 35430 Charlotte NC 28208 Phone: 704-332-2647 C. Date: 7- / 3 --1a Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. a Notary Public for the State of do hereby certify that personally appeared before me this 13 day of _ UU , ?DrO, and acknowledge the due execution of the forgoing t de tion basin maintenance requirements. Witness my hand and official seal, SEAL My commission expires l - P-a0 t o Form SW401-Wet Detention Basin O&M-Rev.4 Page 4 of 4 Permit No. (to be provided by DWQ) OF W A TF9 ?A O? QG A-WDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information. Project name CHARLOTTE PIPE AND FOUNDRY Contact person MATT BRAMWELL Phone number 704-3776-7777 Date 7/6/2010 Drainage area number POND #2 ll. X17 Site Characteristics Drainage area 2,207,621 ft2 Impervious area, post-development 1,626,966 ft2 % impervious 73.70% Design rainfall depth 1.0 in Storage Volume: Non-SA Waters Minimum volume required 131,275 ft3 OK Volume provided 140,548 ft3 OK, volume provided is equal to or in excess of volume required. Storage Volume: SA Waters 1.5" runoff volume ft3 Pre-development 1-yr, 24-hr runoff ft3 Post-development 1-yr, 24-hr runoff ft3 Minimum volume required ft3 Volume provided ft3 t 1J 1;/ Peak Flow Calculations Q r I 7 2010 Is the pre/post control of the 1 yr 24hr storm peak flow required? N (Y or N) 1-yr, 24-hr rainfall depth in DE RR- WATER OMM Rational C, pre-development (unitless) WETLANN AND STOR1AWATERBRANCH Rational C, post-development (unitless) Rainfall intensity: 1-yr, 24-hr storm in/hr Pre-development 1-yr, 24-hr peak flow ft3/sec Post-development 1-yr, 24-hr peak flow ft3/sec Pre/Post 1-yr, 24-hr peak flow control ft3/sec Elevations Temporary pool elevation 515.50 fmsl Permanent pool elevation 513.50 fmsi SHWT elevation (approx. at the perm. pool elevation) fmsi Top of 1 Oft vegetated shelf elevation 514.00 fmsi Bottom of 1 Oft vegetated shelf elevation 513.00 fmsi Data not needed for calculation option #1, but OK if provided. Sediment cleanout, top elevation (bottom of pond) 510.00 fmsl Sediment cleanout, bottom elevation 509.00 fmsi Data not needed for calculation option #1, but OK if provided. Sediment storage provided 1.00 ft Is there additional volume stored above the state-required temp. pool? Y (Y or N) Elevation of the top of the additional volume 515.5 fmsl OK Form SW401-Wet Detention Basin-Rev.8-9/17/09 Parts I. & II. Design Summary, Page 1 of 2 y Permit (to be provided by DWQ) A. iU"'11 0-01MATIWV Surface Areas Area, temporary pool 78,234 ft2 Area REQUIRED, permanent pool 57,177 ft2 SA/DA ratio 2.59 (unitless) Area PROVIDED, permanent pool, ApB,_i 63,843 ft2 OK Area, bottom of 1 Oft vegetated shelf, Atot Snere 60,510 ft2 Area, sediment cleanout, top elevation (bottom of pond), Abot_?nd 42,794 ft2 Volumes Volume, temporary pool Volume, permanent pool, Vpen-pwl Volume, forebay (sum of forebays if more than one forebay) Forebay % of permanent pool volume SAIDA Table Data Design TSS removal Coastal SA/DA Table Used? Mountain/Piedmont SAIDA Table Used? SAIDA ratio Average depth (used in SA/DA table): Calculation option 1 used? (See Figure 10-2b) Volume, permanent pool, Vperm_poo, Area provided, permanent pool, Aperm_pwl Average depth calculated Average depth used in SA/DA, day, (Round to nearest 0.5ft) Calculation option 2 used? (See Figure 10-2b) Area provided, permanent pool, Apem,y?, Area, bottom of 1 Oft vegetated shelf, Abo, shetl Area, sediment cleanout, top elevation (bottom of pond), kt-po d "Depth" (distance b/w bottom of 1 Oft shelf and top of sediment) Average depth calculated Average depth used in SA/DA, day, (Round to nearest 0.5ft) Drawdown Calculations Drawdown through orifice? Diameter of orifice (if circular) Area of orifice (if-non-circular) Coefficient of discharge (CD) Driving head (Ho) Drawdown through weir? Weir type Coefficient of discharge (Q Length of weir (L) Driving head (H) Pre-development 1-yr, 24-hr peak flow Post-development 1-yr, 24-hr peak flow Storage volume discharge rate (through discharge orifice or weir) Storage volume drawdown time Additional Information Vegetated side slopes Vegetated shelf slope Vegetated shelf width Length of flowpath to width ratio Length to width ratio Trash rack for overflow & orifice? Freeboard provided Vegetated filter provided? Recorded drainage easement provided? Capures all runoff at ultimate build-out? Drain mechanism for maintenance or emergencies is: Form SW401-Wet Detention Basin- Rev.8-9117/09 140,548 ft3 OK 186,556 ft' 38,855 ff3 20.8% % OK 85% N (Y or N) Y (Y or N) 2.59 (unitless) Y (Y or N) 186,556 ft3 63,843 ft2 3.00 ft 3.0 ft N (Y or N) 63,843 ft2 60.510 ft2 42,794 ft2 3.00 It It ft Y N Y Y Y Y PUMP OUT _(Y or N) 6.00 in _in2 0.60 (unitless) 1.75 ft _ (Y or N) _ (unitless) _ (unitless) ft ft _ ft3/sec _ ft3/sec ft3/sec 2.30 days 3 :1 10 :1 10.0 ft 3 :1 3.0 :1 _ (Y or N) 1.0 ft (Y or N) (Y or N) (Y or N) OK OK OK, draws down in 2-5 days. OK OK OK OK OK OK OK OK OK OK Parts I. & II. Design Summary, Page 2 of 2 T-17 Nr?. '"2- Permit (to be provided by DWQ) Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Page/ Plan Initials Sheet No. -! L -T. O 1. Plans (1" 50' or larger) of the entire site showing: Design at ultimate build-out, Off-site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Basin dimensions, Pretreatment system, High flow bypass system, Maintenance access, Proposed drainage easement and public right of way (ROW), Overflow device, and Boundaries of drainage easement. 013 L' 2,1 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing Outlet structure with trash rack or similar, Maintenance access, Permanent pool dimensions, Forebay and main pond with hardened emergency spillway, Basin cross-section, Vegetation specification for planting shelf, and Filter strip. 6J 2 . L 3. Section view of the wet detention basin (1" = 20' or larger) showing: Side slopes, 3:1 or lower, Pretreatment and treatment areas, and Inlet and outlet structures. w?? L'Z • Z 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. .Mw,3 L• 2. L 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, to verify volume provided. W i T j • 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. wry L -,K 7. The supporting calculations. A"Mlo"_OD 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. •J?/4 9. A copy of the deed restrictions (if required). 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. Form SW401-Wet Detention Basin-Rev.8-9/17/09 Part III. Required Items Checklist, Page 1 of 1 Permit Number: (to be provided by DWQ) Drainage Area Number: Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): ® does ? does not incorporate a vegetated filter at the outlet. This system (check one): ? does ® does not incorporate pretreatment other than a forebay. Important maintenance procedures: - Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). - No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. - Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. - If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. - Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How I will remediate the problem: The entire BMP Trash/debris is resent. Remove the trash/debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of long. approximately six inches. Form SW401-Wet Detention Basin O&M-Rev.4 Page 1 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potential problem: How I will remediate the problem: The inlet device: pipe or The pipe is clogged. Unclog the pipe. Dispose of the Swale sediment off-site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to swale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over Consult a professional to remove 50% of the area. and control the algal growth. Cattails, phragmites or other Remove the plants by wiping them invasive plants cover 50% of with pesticide (do not spray). the basin surface. Form SW401-Wet Detention Basin O&M-Rev.4 Page 2 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potential problem: How I will remediate the problem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. (if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off-site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 513.50 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 513.50 feet in the forebay, the sediment shall be removed. BASIN DIAGRAM (fill in the blanks) 0 Permanent Pool Elevation 513.50 Sediment Removal .510.00 APeanen Pool - - - - - - - - - - - - - - ume Sediment Removal Elevation 510.00 Volume ottom E evatio 509.00 in. ------------------------------------i_4_?/r ---ement Bottom Elevation 509.00 Storage Sedimei Storage FOREBAY MAIN POND Form SW401-Wet Detention Basin O&M-Rev.4 Page 3 of 4 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:CHARLOTTE PIPE AND FOUNDRY BMP drainage area number:POND #2 Print name:David Waggoner Title: Environmental Manager Address:PO Box 35430 Charlotte NC 28208 Phone: 704-332-2647 Signature: j-) .E' Date: 7- i 3- I o Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. a Notary Public for the State of of L- , do hereby certify that personally appeared before me this ? forgoing seal, a° 10, and acknowledge the due execution of the basin maintenance requirements. Witness my hand and official SEAL My commission expires q./q-2010 Form SW40I-Wet Detention Basin O&M-Rev.4 Page 4 of 4 A&A NCDENR O?O? W ATF9OG h ? > .y o r STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM LEVEL SPREADER, FILTER STRIP AND RESTORED RIPARIAN BUFFER SUPPLEMENT This form must be completely filled out, printed and submitted. DO NOT FORGET TO ATTACH THE REQUIRED ITEMS CHECKLIST AND ALL REQUIRED ITEMS (NEXT WORKSHEET)! Project name CHARLOTTE PIPE AND FOUNDRY Contact name MATT BRAMWELL Phone number 704-376-7777 Date July 6, 2010 Drainage area number POND #2 II. For Level Spreaders Receiving Flow From a BMP Type of BMP WET POND Drawdown flow from the BMP 0.42 cfs For Level Spreaders Receiving Flow from the Drainage Area Do not complete this section of the worksheet. Drainage area ftz Do not complete this section of the worksheet. Impervious surface area ft2 Do not complete this section of the worksheet. Percent impervious % Do not complete this section of the worksheet. Rational C coefficient Do not complete this section of the worksheet. Peak flow from the 1 in/hr storm cfs Do not complete this section of the worksheet. Time of concentration min Rainfall intensity, 10-yr storm in/hr Do not complete this section of the worksheet. Peak flow from the 10-yr storm cfs Do not complete this section of the worksheet. Where Does the Level Spreader Discharge? To a grassed bioretention cell? N (Y or N) To a mulched bioretention cell? N (Y or N) To a wetland? N (Y or N) To a filter strip or riparian buffer? Y (Y or N) Please complete filter strip characterization below. Other (specify) Filter Strip or Riparian Buffer Characterization (if applicable) Width of grass ft Width of dense ground cover 30.00 ft Width wooded vegetation Total width 30.00 ft ft ? ? M? nr5 U V 1110?? Elevation at downslope base of level lip 508.25 fmsl Elevation at top of bank of the receiving water 506.00 fmsl O C T I n 1w Slope (from level lip to to top of bank) 7.50 % Are any draws present? N (Y or N) OK DENR - WATER QUALITY WETLANDS AND STOR.%"AATER Bwch Level Spreader Design Forebay surface area sq ft No forebay is needed. Feet of level lip needed per cfs 13 ft/cfs Answer "Y" to one of the following: Length based on the 1 in/hr storm? (Y or N) Length based on the 10-yr storm? (Y or N) Length based on the BMP discharge rate? Y (Y or N) Design flow 0.42 cfs Is a bypass device provided? Y (Y or N) OK Form SW401-Level Spreader, Filter Strip, Restored Riparian Buffer-Rev.5 Parts I. and II. Design Summary, page 1 of 2 R ?'? ±. ? . Y ? Length of the level lip 13.00 ft Are level spreaders in series? N (Y or N) Bypass Channel Design (if applicable) Does the bypass discharge through a wetland? (Y or N) Does the channel enter the stream at an angle? (Y or N) Dimensions of the channel (see diagram below): M ft B ft W ft y ft Peak velocity in the channel during the 10-yr storm cfs Channel lining material #VALU E! ? w ------------ M '--00-t _4 M B Form SW401-Level Spreader, Filter Strip, Restored Riparian Buffer-Rev.5 Parts I. and If. Design Summary, page 2 of 2 i?. 'cam ?? _ _ Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Plan Initials Sheet No. 1. Plans (1" 50' or larger) of the entire site showing: Design at ultimate build-out, Off-site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Forebay (if applicable), High flow bypass system, Maintenance access, Proposed drainage easement and public right of way (ROW), and Boundaries of drainage easement. 2. Plan details (1" = 30' or larger) for the level spreader showing: Forebay (if applicable), High flow bypass system, One foot topo lines between the level lip and top of stream bank, Proposed drainage easement, and Design at ultimate build-out. 'L • 2t 3. Section view of the level spreader (1" = 20' or larger) showing: Underdrain system (if applicable), Level lip, Upslope channel, and Downslope filter fabric. A 4. A date-stamped photograph of the filter strip that clearly shows the type of vegetation that is present. 01 5 Mw? 1; 5. A construction sequence that shows how the level spreader will be protected from sediment until the entire y` drainage area is stabilized. &A-_#60"S 6. The supporting calculations. A W1 1 y6n? 7. A copy of the signed and notarized operation and maintenance (0&M) agreement. tl 8. A copy of the deed restrictions (if required). Form SW401-Level Spreader, Filter Strip, Restored Riparian Buffer-Rev.5 Part III, page 1 of 1 ~•t ? t 1 Permit Number: (to be provided by DWQ) Drainage Area Number: Filter Strip, Restored Riparian Buffer and Level Spreader Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: - Immediately after the filter strip is established, any newly planted vegetation will be watered twice weekly if needed until the plants become established (commonly six weeks). - Once a year, the filter strip will be reseeded to maintain a dense growth of vegetation - Stable groundcover will be maintained in the drainage area to reduce the sediment load to the vegetation. - Two to three times a year, grass filter strips will be mowed and the clippings harvested to promote the growth of thick vegetation with optimum pollutant removal efficiency. Turf grass should not be cut shorter than 3 to 5 inches and may be allowed to grow as tall as 12 inches depending on aesthetic requirements (NIPC, 1993). Forested filter strips do not require this type of maintenance. - Once a year, the soil will be aerated if necessary. - Once a year, soil pH will be tested and lime will be added if necessary. After the filter strip is established, it will be inspected quarterly and within 24 hours after every storm event greater than 1.0 inch (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How I will remediate the problem: The entire filter strip Trash/debris is present. Remove the trash/debris. system The flow splitter device The flow splitter device is Unclog the conveyance and dispose (if applicable) clogged. of an sediment off-site. The flow splitter device is Make any necessary repairs or damaged. replace if damage is too large for repair. Form SWU401-Level Spreader, Filter Strip, Restored Riparian Buffer O&M-Rev.3 Page 1 of 3 BMP element: Potential problem: How I will remediate the problem: The Swale and the level The swale is clogged with Remove the sediment and dispose lip sediment. of it off-site. The level lip is cracked, Repair or replace lip. settled, undercut, eroded or otherwise damaged. There is erosion around the Regrade the soil to create a berm end of the level spreader that that is higher than the level lip, and shows stormwater has then plant a ground cover and bypassed it. water until it is established. Provide lime and a one-time fertilizer application. Trees or shrubs have begun Remove them. to grow on the swale or just downslo e of the level lip. The bypass channel Areas of bare soil and/or Regrade the soil if necessary to erosive gullies have formed. remove the gully, and then reestablish proper erosion control. Turf reinforcement is Study the site to see if a larger damaged or ripap is rolling bypass channel is needed (enlarge if downhill. necessary). After this, reestablish the erosion control material. The filter strip Grass is too short or too long Maintain grass at a height of (if applicable). approximately three to six inches. Areas of bare soil and/or Regrade the soil if necessary to erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Sediment is building up on Remove the sediment and the filter strip. restabilize the soil with vegetation if necessary. Provide lime and a one- time fertilizer application. Plants are desiccated. Provide additional irrigation and fertilizer as needed. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application. Nuisance vegetation is Remove vegetation by hand if choking out desirable species. possible. If pesticide is used, do not allow it to get into the receiving water. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality local Regional Office, or the outlet. 401 Oversi ht Unit at 919-733-1786. Form SWU401-Level Spreader, Filter Strip, Restored Riparian Buffer O&M-Rev.3 Page 2 Of 3 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:CHARLOTTE PIPE AND FOUNDRY BMP drainage area number:POND #2 Print name:David Wagjzoner Title: Environmental Manager Address:PO Box 35430 Charlotte, NC 28208 Phone:704-332-2647 Signature: )-'-J -? Date: 7 - 1,3 - / Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. 1, " , a Notary Public for the State of County o , do hereby certify that l personally appeared before me this /3 day ofand acknowledge the due execution of the forgoing filter s rip, riparian buffer, and/or level spreader maintenance requirements. Witness my hand and official seal, SEAL My commission expires 9.1q.Z10 Form SWU401-Level Spreader, Filter Strip, Restored Riparian Buffer O&M-Rev. 3 Page 3 of 3 Mr. Marshall Coble Charlotte Pipe and Foundry P.O. Box 35430 Charlotte, NC 28235 Project: Charlotte Pipe and Foundry County: Stanly County The purpose of this letter is to notify you that the North Carolina Ecosystem Enhancement Program (NCEEP) is willing to accept payment for impacts associated with the above referenced project. Please note that this decision does not assure that the payment will be approved by the permit issuing agencies as mitigation for project impacts. It-is the responsibility of the applicant to contact these agencies to determine if payment to the NCEFP will be approved You T iii a_so r plf`wlth all staie, federil or local This acceptance is valid for nine months from the date of this letter and is not transferable. If we have not received a copy of the issued 404 Permit/401 Certification/CAMA permit within this time frame, this acceptance will expire. It is the applicant's responsibility to send copies of the permits to NCEEP. Once NCEEP receives a copy of the permit(s) an invoice will be issued based on the required mitigation in that permit and payment must be made prior to conducting the authorized work. The amount of the In Lieu Fee to be paid to NCEEP by an applicant is calculated based upon the Fee Schedule and policies listed at www-nceep.net. Based on the information supplied by you the impacts that may require compensatory mitigation are summarized in the following table. River Basin CU Location Stream (feet) Wetlands (acres) Buffer 1 (Sq. Ft.) Buffer 11 (Sq. Ft.) Cold Cool Warm Riparian Non-Riparian Coastal Marsh Impact Yadkin 03040105 0 0 300 0.246 0 0 0 0 Credits Yadkin 03040105 0 0 600 0.492 0 0 0 0 Upon receipt of payment, EEP will take responsibility for providing the compensatory mitigation. If the regulatory agencies require mitigation credits greater than indicated above, and the applicant wants NCEEP to be responsible for the additional mitigation, the applicant will need to submit a mitigation request to NCEEP for approval prior to permit issuance. The mitigation will be performed in accordance with the Memorandum of Understanding between the N.C. Department of Environment and Natural Resources and the U.S. Army Corps of Engineers dated November 4, 1998. If you have any questions orneed additional information, please contact Valerie Mitchencr at (919) 715-1973. Sincerely, 44LO' C-4-- William D. Gilmore, PE Director cc: Cyndl Kuoly, NCDWQ Wetlands/401 Unit Steve Lund, USACE-Asheville Alas Johnson, NCDWQ-Mooresville Lsorrard S. RinuMer, agent File 1"brigg.- E?t?ia?ui,?t - Prot" our StA& 1. pet m ERment PR06RAM July 16, 2009 OCT RP=@R0VV im P 72010 DENR - WATER OUAUTV WETLANDS AND STORN,W.4TER BRANCH Expiration of Acceptance: April 16, 2010 North Gsrokm E.oosyNon Enltamoemerd ProOrst k 1052 MO Sen im Center. R~, NC 27899-16521919-715,0476/www. memp-net ?SF .. rl' U.S. ARMY CORPS OF ENGINEERS Qopy WILMINGTON DISTRICT Action ID. SAW-2009-1556 County: Stanly USGS Quad: Oakboro GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION Property Owner / Authorized Agent: Charlotte Pipe and Foundry, Attn: Greg Simmons Address: PO Box 35430 Charlotte, NC 28208 Telephone No.: 704-348-5410 Size and location of property (water body, road name/number, town, etc.): Approximate 276-acre industrial development site (Oakmont Site) located between Lighthouse Road and Swift Road adjacent to unnamed tributaries to Coldwater Branch southwest of Oakboro. Description of projects area and activity: Pipe and fill 300 linear feet of important intermittent stream channel and 0.25 acres of wetland adjacent to an unnamed tributary to Coldwater Branch for a new foundry and related facilities. SPECIAL CONDITION: In order to compensate for impacts to 300 linear feet of stream with important aquatic function and 0.25 acres of riparian wetland, the permittee shall make payment to the North Carolina Ecosystem Enhancement Program (NCEEP) in the amount determined by the NCEEP, sufficient to perform the restoration of 300 linear feet of warm water stream channel and 0.25 acres of riparian wetland in the Yadkin River Basin, Cataloging Unit 03040105. Construction within jurisdictional areas on the property shall begin only after the permittee has made full pavment to the NCEEP and provided a copy of the pavment documentation to the Corps. Applicable Law: X Section 404 (Clean Water Act, 33 USC 1344) ? Section 10 (Rivers and Harbors Act, 33 USC 403) Authorization: Regional General Permit Number: Nationwide Permit Number: 39 Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the attached conditions and your submitted plans. Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop work order, a restoration order and!or appropriate legal action. This verification will remain valid until the expiration date identified below unless the nationwide authorization is modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide permit authorization is reissued andior modified, this verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified nationwide permit. If the nationwide permit authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the nationwide permit, activities which have commenced (i.e., are under construction) or are under contract to commence in reliance upon the nationwide permit, will remain authorized provided the activity is completed within twelve months of the date of the nationwide permit's expiration, modification or revocation, unless discretionary authority has been exercised oil a case-by-case basis to modify, suspend or revoke the authorization. Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Quality (telephone (919) 733-1786) to determine Section 401 requirements. For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (LAMA), prior to beginning work you must contact the N.L. Division of Coastal Management . I his Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State or local approvals!permits. If there are any questions regarding (his verification, any of the conditions of the Permit, or the Corps of Engineers regulatory program, please contact Steven Lund at telephone 828-271-7980. Corps Regulatory Official: Steven Lund Date: September 17, 2009 Expiration Date ol'Verification: September 17, 2011 The Wilmington District is committed to providing the highest level of support to the public. To help its ensure we continue to do so, please complete the attached customer Satisfaction Survey or visit http.: Nww_saw.usace.army. tnillWl-'1'I_ANDS'index.hunl to complete the survey online. ?(Opy Determination of Jurisdiction: ? Based on preliminary information, there appear to be waters of the US including wetlands within the above described project area. This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process ( Reference 33 CFR Part 331). ? There are Navigable Waters of the United States within the above described project area subject to the permit requirements of Section 10 of the Rivers and Harbors Act and Section 404 of the Clean Water Act. Unless there is a change in the law or out published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. there are waters of the US and/or wetlands within the above described project area subject to the permit requirements of Section 404 of the Clean Water Act (CWA)(33 USC § 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. ? The jurisdictional areas within the above described project area have been identified under a previous action. Please reference jurisdictional determination issued . Action ID Basis of Jurisdictional Determination: Streams are intermittent (RPWs) flowing to Coldwater Branch, a perennial tributary to the Rockv River, a traditionally navigable water. Appeals Information (This information applies only to approved jurisdictional determinations.) Attached to this verification is an approved jurisdictional determination. If you are not in agreement with that approved jurisdictional determination. you can make an administrative appeal under 33 CFR 331. Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and request for appeal (RFA) form. If you request to appeal this determination you must submit a completed RTA forth to the following address: District Engineer, Wilmington Regulatory Division Attn: Steven W. Lund. Project Manager Asheville Regulatory Field Office 151 Patton Avenue. Room 208 Asheville, North Carolina 28801-5006 In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal under 33 CFR part 331.5, and that it has been received by the District Office within 60 days of the date of the NAP. Should you decide to submit an RFA form, it must be received at the above address within 60 days of the date below. **It is not necessary to submit an RFA form to the District Office if you do not object to the determination in this correspondence.** Corps Regulatory Official: Steven Lund Date: September 17, 2009 SURVEY PLATS, FIELD SKETCH, WETLAND DELINEATION FORMS, PROJECT PLANS, FTC., MUST BE ATTACI-ILD TO THE FILE COPY OF THIS FORM. IF REQUIRED OR AVAiLABI-E. Copy Furnished: Mr. Leonard S. Rindner, Environmental Planning Consultant, 3714 Spokeshave Lane. Matthews, NC 28105 Qopy Action ID Number: SAW-2009-1556 County: Stanly Permittee: Charlotte Pipe and Foundry, NW 39, Oakmont Site, Oakboro, NC Date Permit Issued: September 17, 2009 Project Manager: Lund Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT ASHEVILLE REGULATORY FIELD OFFICE 151 PATTON AVENUE, ROOM 208 ASHEVILLE, NORTH CAROLINA 28801-5006 Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. If you fail to comply with this permit you are subject to permit suspension, modification, or revocation. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and condition of the said permit, and required mitigation was completed in accordance with the permit conditions. Signature of Permittee Date A .?.?„ NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Be= er!y Eaves Perdue Coleen H Sullins Govemor Diroctor Mr Greg Simmons Charlotte Pipe and Foundry P O box 35430 Charlotte. NC 28208 Subject: Oakmont Charlotte Pipe And Foundry APPROVAL of 401 Water Quality Certification with Additional Conditions Dear Mr Simmons Gee Freernan Secretary ,'august ?7. 2009 DVVQ# 09-0859 Stanly County You have our approval, in accordance with the general certification and those conditions listed below, to impact 0 25 acre of wetland and 300 linear feet (If) of unnamed stream to Coldwater Creek in order to construct the project in Stanly County, as described in your application received by the Division of Water Quality iDWQ) on August 7 2009 After reviewing your application, we have determined that this project is covered by Water Quality General Certification Number 3705, which can be viewed on our web site at http:Nh2o.enr.state nc.usfncwetiands The Genera{ Certification allows you to use Nationwide Permit Number 39 once it is issued to you by the U S Army Corps of Engineers Please note that you should get any other federal, state or local permits before proceeding with your protect. including those required by (but not limited ,c) Sediment and Erosion Control, Non-Discharge, and Water Supply Watershed regulations The above noted Certification will expire when the associated 404 permit expires unless otherwise specified in the General Certification This approval is only valid for the purpose and design that you described in your application If you change your protect, you must notify us in writing, and you may be required to send its a new application for a new certification If the prooerty is sold the new owner must be given a copy of the Certification and approval letter, and is thereby responsible for complying with all conditions in addilion to the requirements of t+irti (,er~ificat cn, you must also comply with the following conditions The Mooresville Regional Office shalt be notified in writing once censti,,ction at the approved impact areas has i°on,menced Existing stream dimensions (including the cross section dimensions pattern. and longitudinal profile) must be maintained (or restored via constructed benches) above and below locations of each culvert if any of the existing pipes are or become perched, the appropriate stream grade shall be re-established or, if the pipes installed in a perched manner, the pipes shall be removed and re-installed correctly MoaresvrFle, NCB 1 1 3 5 i % rar,r?re 610 Ent C4rter Avenue. 5ude 3U T Ph.rxt?r +'04 1 31 its r70+t18 8 4^t Cast mer ,urvKe t.q' -i;2 ? ', 4A intr. +tM w+?ry rt?w?t!0rrru._,3++!'?. ?>r3 )ne r C16rthCarolina ..A Cltltl ally rr >. r., d:+i,.Q=., ?t . ,. F ...:... V_-t' - .,.G,r;=a. yr,' t ---- V rxt..r Mitigation must be provided for the proposed impacts as specified +r the table below we understand that you wish to make a payment to the restoration fund admitist`ered by the NC Ecosystem Enhancement Program (EEP) to meet this mitigation requirement This has been,determinec! by the DWQ to be a suitable method tc meet the mitigation requirement Until the EEP receives and clears your check imade payable to DENR - Ecosystem Enhancement Program Office) no impacts spec=fied in this Authorization Certificate shall occur The EEP should be contacted at (919) 15-10476 if you'have any questions concermrg payment into a restoration fund Ycu have 60 days frc,rn the date of this approval to make this paymen? For accounting purposes. this Authorization Certificate authonzes payment into the restoration fund to meet the following compensatory mitigation requirement Compensri', t, Required stream 300, feet; Wetlands (acres) --- 1 Waters (acres) Mitigatioi River and Sub-basin Number Yadkin (03040105) 4 Storm water discharge structures at this site shad be constructed in a manner such that the potential receiving streams (of the discharger will not be impacted due to sediment accumulations securing or erosion of the stream banks 5 A final, written storm water management plan {including a signed and notarized Operation and Maintenance Agreement) shall be submitted to the 401 Oversight and Express Permitting Unit (2321 Crabtree Blvd , Suite 250. Raleigh. NC. 27604) within 60 days of the issuance of the 401 Water Quality Certification The storm water management plans shall be approved in writing by this Office for local approved delegated authority) before the impacts specified in this Certification occur You have the option of using the Express Review Program for expedited approval of these plans If you propose to use the Express Review Program, remember to include the appropriate fee with the plan. The storm water . management plan must include construction plans. specifications.. storm water BMP worksheets, and supporting calculations The storm water best management practices are required to be appropriate for the surface water classification and designed to remove at least 85% TSS acrording,to the most recent ersion of the NC DENR Storm water Best Management Practices Manual These facilities must be designed to treat the runoff from the entire project. unless otherwise explicitly approved by the Division of,Water,Quatity for local delegated authority) Also. before any permanent building is occupied at the subject site, the facilities shall be constructed and operational, and the storm water management plan shall be implemented The structural storm water practices as approved as well as drainage patterns must be maintained in perpetuity No changes to the structural storm water prartices shall be made without written authorization from the Division of Water Quality 6 Sediment and erosion control measures shall not be placed in wetlands or waters without prior approval from DWQ if approved they shall be removed and the natural grade restored within two monks of the date of the close out,istabilization of the givers drainage area Upon completion of the protect, the applicant shall complete and return the enclosed 'Certificate of Completion" form to the 401/Wetlands Unit of the NC Division of water otiatity Continuing Compliance The applicant (Charlotte Pipe and Foundryi shall conduct all activities in a manner so as not to contravene any state water quality standard (including any requirements for compliance with section 303(d) of the Clean Water Act) and any othe appropriate requirements of state and federal law if DWO determines that such standards or laws are not being met (including the failure to sustain a designated or achieved use) or that state or federal law is being violated, or that further conditions are necessary to assure compliance, DWO may reevaluate and modify this certification to include conditions appropriate to assure compliance with such standards and requirements in accordance with 15 A NCAC 211 0507(d) Before codifying the certification DWO shall notify the applicant and the US Army Corps of Engineers, provide public notice in accordance with 15A NCAC 2N 0503, and provide opportunity for public hearing in accordance with 15A NCAC 2N 0504 Any new or revised conditions shall be provided to the applicant in NORTH CAROLINA-DiVISON OF WATER QUALITY 09-0859 401 WATER QUAL!TY CERTIFICATION SUMMARY QF PERMITTED IMPACTS AND MITIGATION REQUIREMENTS In accordance with 15A NCAC 2 H 0500 Charlctte Pipe and Foundry has permission as outlined below to impact 300 linear feet of stream and 0 25 acre of wetland in order to proceed with the development in Stanl,v County, North Carolina All activities associated with these authorized impacts must be conducted with the conditions listed in the attached certification THIS CERTIFICATION IS NOT VALID WITHOUT THE ATTACHMENTS COMPENSATORY MITIGATION REQUIREMENT: ECOSYSTEM ENHANCEMENT PROGRAM LOCATION COUNTY Swift Rd t?ASINISUBBASIN Manly Yadkin (0:;',101o5) Impacts: -100 linear feet of stream 6 25 acre wetland As required by 15A NCAC 2H 0506 and the conditions of this certification, you are required to compensate fcr the above impacts through the restoration creation enhancement or preservation of wetlands as outlin neiow prior to conducting any activities that impart or degrade the waters of the state ed Note Linear foot requirements proposed to be mitigated through the Ecosystem Enhancement Program must be rounded to the nearest trot and acreage requirements must be rounded to one-quarter acre increm according to 15 2r C503thi cats Mitigation: 300 t. inear feet of stream MAMatian: 300 linear feet of perennial streams by EEP required for the 4J I Water(. uahty Certification ii correspondence dated July 16 2009 the EEP indicated that up to 600 linear feet of stream mit be the finit conducted by EEP if available within the cataloging unit igation would be may be required if mitigation is required uld outside Orie of it"e Options you have available to satsfy the compensatory mitigation requirements is through the payment of a fee to the Ecosystem Enhancement Fund sign this farm and mail it to the Ecosystem E per NCAC 2R 05re if you choose this notion. please nhancen er;t Fund at the address listed below An invoice for the appropriate amount of payment will be sent to yini, upon receipt of this form PLEASE NOTE THE ABOVE IMPACTS ARE NoT AUTHORIZED iINTIL YOU RECEIVE NOTIFICATION THAT YOUR CAYMENT HAS BEEN PROCESSED BY THE EEP 7jq') attJre Date ECOSYSTEM ENHANCEMENT PROGRAM DIViSON OF WATER QUALITY 165; Mail Service Center RALEIGH N C ?7661;}-1652 -orps of permit wasting shall ;,,e V;rovided to the Unit States Army C hall also telccme conch ons}of the 4iy4 Perm tsfor the pursuant to Sectir;n 404 of the Clean Water Act, project yoj sk for an may, a wr t en hearing adjud if you do not accept any of the conditions you refcethis ive thisf{eftern To ask foraa hearing; sendicatory for days titer 1date that y pe ' ' I st act within e fmat petitiorflthat.conforms to Chapter 1508 of ihh N Ch2 ? 7?4enThissertficahon and ift ccondt tins ar Administrative Hearings, 6714 Mail Service Center, Raleig , and binding unless you ask for a hearing This letter completes the review of the Division iAlanf Jo?Nater hnson Q in ?the Mooresv Ile Regional-- !6599 atn?04t0634t if j-)u rave any questions, please telephone !659 or Ms Cyndi Karoly in the Central Office in Raleigh 919-73-3-97,21 Snrerswiy f }r Coleen f I :;iillins Attachment,, cc Army Corps of Engineers, Asheville Ian McMillan, Wetlands Unit MRO Land Quality Len Ruldner since 1983 ENWHEERING CONSULTAPITS, INC. www.trigoneng.com P.C. Box 18846 • Zip 27419-8846. 313 Gallimore Dairy Road • Greensboro, NC 27409 • p 336.668.0093 • f 336.668.3868 October 2, 2007 Mr. Rob Klauk, P.E. Land Design 223 North Graham Street Charlotte, North Carolina 28202 Reference: Report of Subsurface Exploration Stanley County Industrial Facility Oakboro, North Carolina Trigon Project No. 011-07-064 Dear Mr. Klauk: OCT 20'o DENR-WATER QUAUTY WETL M AND STORMNATER BRANC-4 This report presents the results of a subsurface exploration and geotechnical engineering evaluation for the referenced project. The purpose of our preliminary subsurface exploration was to evaluate the general subsurface conditions at the site in order to assess their impact on overall site development and construction considerations. INTRODUCTION This report presents the results of a preliminary subsurface exploration and geotechnical engineering evaluation completed by Trigon Engineering Consultants, Inc. for the referenced project. This work was verbally authorized by Mr. Rob Klauk of Land Design and was completed in general accordance with our September 5, 2007 Proposal No. 011-07-085-P. The purpose of our services is to evaluate the general subsurface conditions at the site in order to assess their impact on overall site development and construction considerations. Mr. Rob Kiauk, P.E., Land Design October 2, 1007 Stanley Courzty Industrial Facility, Ookboro, Atorth Carolina Trigon Project No. 071-07-06? PROJECT DESCRIPTION The site will be developed for an industrial facility, to be located within the central portion of the property. The structure footprint has not been determined. The structural configuration is expected to be up to 2 stories in height with steel framing and a slab on grade floor. Based on our experience with similar facilities, overall column and floor loads are not expected to exceed 600 kips and 500 psf, respectively. However, equipment installation is expected to result in heavily loaded localized areas. Cuts and fills of up to 30 feet are expected.. FIELD TESTING Prior to drilling, an engineer visited the site to perform a site reconnaissance and locate the borings in the field using existing landmarks as reference. The surface features of the site were observed with respect to drilling access and site features that may affect development and construction. The subsurface exploration included the completion of eight (8) soil test borings (B-1 through B-8) at the approximate locations shown on the Boring Location Diagram, Drawing No. 011-07-064-1, included in the Appendix. The boring locations were established in the field by personnel from Trigon using the existing features as reference. The borings were advanced to depths ranging from 1.0 to 19.9 feet below the ground surface using continuous-flight, hollow-stem augers. Standard Penetration Tests were performed at 2.5 foot intervals to a depth of 10 feet and at 5 foot intervals thereafter to the depths explored in general accordance with ASTM D 1586. Standard Penetration Test data (SPT N-values) were used to estimate the in situ soil strength and density. Soil samples were obtained at each test interval. Groundwater measurements were performed at the tennination of drilling, and again 24 hours later in borings B-1, B-4, and B-5. Groundwater levels are indicated on the respective Test Boring Record. TRiGONENcunEF_RING CONSULTANTS, INC. Page 2 Mr. Rob Klauk, P. E., Land Design October 1, 2007 Stanley County Industrial Facility; Dakboro, Norih Carolina Tryon Pro}eet No. 011-07-064 LABORATORY TESTING All recovered soil samples were transported to our laboratory where they were subjected to visual - manual classification by a geotechnical engineer, The 'Test Boring Records were prepared using the observations made in the field by the driller, as well as the visual - manual classification in the laboratory. The lines designating the interfaces between various strata are approximate. The transition between strata may be gradual in both the vertical and horizontal directions. The Test Boring Records are included in the Appendix together with brief descriptions of the field testing procedures. The bulk samples were tested to determine the moisture-density relationship and plasticity characteristics. Due to the urgency of the project, the laboratory testing had not been completed at the time this report was issued. The laboratory test results will be reported under separate cover. DOCUMENT REVIEW As part of our services, the USGS and Soil Survey maps of Stanley County were reviewed. The purpose of the review was to assess the effects of the general landforms and near surface conditions on development and construction. FINDINGS SITE OBSERVATIONS The site for the project is currently used for agricultural purposes, and is generally clear with some wooded portions. The clear areas are currently used as pastureland for cattle. Farm structures and a pond are present in the central portion of the site, in the designated General Plant Area. Three smaller ponds are present outside the General Plant Area. In addition, several interconnecting wet weather drainage features are also present, exiting the site to the south. Within the General Plant Area, the ground elevation varies from a high of 550 feet MSL on a knoll in the southeast corner, down to a low of 510 feet MSL on the southern border at the stream exit. The remainder of the property varies in elevation from 560 feet MSL to 514 feet MSL. TRIGONENGrx&r,RINC CousuarAnrs, INc. Page 3 Mr. /ooh K7auk, 1, E., Land Design, October 2, 2007 Stanley County Industrial Facility, Oakboro, Norlh Carolina Trigon Project No. 011-07-064 SUBSURFACE FINDINGS The subsurface conditions at the site, as indicated by the borings, generally consist of a residual soil profile underlain by partially weathered rock and bedrock. The generalized subsurface conditions are described below. For soil descriptions and general stratification at a particular boring location, the respective Test Boring Record should be reviewed. Topsoil is present in borings B-1 through B-3, B-5, B-7, and B-8, ranging in thickness from 0.4 to 0.6 foot. Disturbed soil, resulting from agricultural activities, is present to a depth of 0.7 foot in boring B-4. No ground cover is present in boring B-6. Residual soils are present below the topsoil and disturbed soil in borings B-l, B-2, and B-3. Residual soils are formed by the in-place chemical and mechanical weathering of the parent bedrock. The residual soils in our borings generally consist of silty sands and sandy silts. SPT N-values recorded in the residuum range from 26 to 66 bpf. Soft weathered rock is present below the residual soil in borings B-1 through B-3, the disturbed soil in boring B-4, the topsoil in borings B-5, B-7, and B-8, and from the ground surface in boring B-6. A zone of residual soil is present between 5.5 and 13.0 feet within the soft weathered rock in boring B-5. Soft weathered rock is defined as any residual material which exhibits a Standard Penetration Resistance in excess of 100 bpf, but less than 50 blows per 0.1 foot. The soft weathered rock represents the transition between residual soil and hard weathered rock (SPT N-values > 50 blows per 0.1 foot) and/or bedrock. Hard weathered rock is present below the soft weathered rock in borings B-5, B-6, and B-8. The soft and hard weathered rock in our borings generally samples as silty sands and sandy silts. Auger refusal occurred at depths between 1.5 and 19.9 feet in each of our borings. Auger refusal is defined as negligible penetration of the augers under the full weight and down pressure of the drill rig. Auger refusal can occur on rock lenses, boulders or on top of continuous bedrock. Based on the subsurface conditions at the site as indicated by our borings and our experience in the area, auger refusal occurred on top of continuous bedrock. Core sampling of the refusal materials to determine their character and continuity was beyond the scope of services of this project. DuGON ENGINEERING CONSULMAN75, INC. Page 4 A4r. Rob Kfauk, P.F., Land Design October 2, 2007 Stanley, County Industrial Facility, Oakboro, ,Vorth Carolina Tripon Prtject No. 011-07-064 GROUNDWATER No groundwater was observed to the termination depths of the borings performed for this project. Some fluctuation in groundwater levels can occur with climatic and seasonal variations, with the highest groundwater levels expected in late winter and early spring. Seasonal low groundwater levels are expected in late summer and early fall. Therefore, subsurface water conditions at other times may be different from those described in this report. DOCUMENT REVIEW Based on information from the 1985 Geologic Map of North Carolina and our experience in the area, the site is located in the Carolina Slate Belt of the Piedmont Physiographic Province. The bedrock in this area generally consists of metavolcanics and argillites. This bedrock is characterized by thin bedding planes and moderate rippability of the upper zone. The on-site residual soils are the product of the in- plaee weathering of the parent bedrock. The USDA soil survey map indicates the presence of four near-surface mapping units, the Badin, Goldston, Kirksey, and Misenheimer soil series. Each of these series generally consists of silt loams with thin and flat rock fragments in the overburden, with surface slopes from 2 to 15 percent. These soil series are characterized by shallow depths to bedrock, and an increased corrosion potential for buried steel and concrete structures. These soils are moderately plastic, with liquid limits of up to 50, and Plasticity Indices of from b to 22. PRELIMINARY CONCLUSIONS AND RECOMMENDATIONS Our preliminary conclusions and recommendations are based on the project description outlined above and on the data obtained from our field and laboratory testing programs. We believe the site is suitable for the proposed development provided the recommendations presented in this report are implemented during both the design and construction phases of the project, and the economics of those recommendations are considered during the planning process. TRtCON ENGINE'6RING CONSULT 4hTs INC. Page 5 Mr. Roll Klauk, P- E., Land Design Ortober 2, 2007 Stanley County Industrial Facility, Oakboro, North Carolina _ Trigon Projed No. (ll t-07-064 As the project processes and building constructions and locations are established, additional subsurface information should be obtained to provide more detailed recommendations. We also recommend laboratory testing to confirm the corrosion potential properties of likely backfill soils. Geopbysical testing should also be performed to assess the excavatability of the rock, and determine the seismic site class at each of the proposed building locations. The borings performed at this site represent the subsurface conditions at the location of the borings only. Due to the prevailing geology, there can be changes in the subsurface conditions over relatively short distances that have not been disclosed by the economically limited number of borings performed. Consequently, there may be undisclosed subsurface conditions that may require special treatment or preparation once these conditions are revealed during construction. SEISMIC SITE CLASSIFICATION Based on the North Carolina Building Code, an evaluation of the upper 100 feet of the material below the ground surface and its characteristics is required to determine site classification. The subsurface investigation for this project included soil borings that terminated on top of bedrock without rock coring. Based on the depth to bedrock in our borings and the potential site grades, the subsurface profile appears consistent with seismic site class "B" or "C" as outlined in the North Carolina Building Code, depending on final grades and building location. Note that a maximum seismic site class of "C" is applicable when there is 10 feet or more of soil below the finished grades. The site classification should be determined on a building specific basis once the locations are determined. SITE SUITABILITY Based on the results of our borings, the presence of shallow rock and the cost of excavating and the effect on the construction schedule must be considered in determining the economics of site development. The effect of the rock on the cost and schedule can be reduced by implementing the recommendations presented herein during the design and construction phases of the project. Some flexibility in the building locations should be considered to accommodate the existing near surface subsurface conditions. TRIGONENGINrcRING CONSuLTANT.s, INc. Page 6 Mr, Rob Klauk, P.E, Land Design October 2, 2007 Stanley County Industrial Facilrrv, Oakboro, .Norih Carolina Trieon Project A'o. 011-07-064 Our borings indicate the presence of bedrock at shallow depths over the majority of the site. 'T'hese materials require sufficiently sized equipment and/or blasting to excavate. Also note that, generally, blasted materials are not suitable for use as fill without a properly controlled blasting program to sufficiently reduce the maximum size, or additional processing, such as crushing and blending. Based on the likely volume of rock to be excavated, additional processing may prove economical. Some adjustment in site grades may be necessary to compensate for the loss of useable material. Importation of structural fill may also be required to compensate for the loss of useable material. It should be expected that muck will be present in the bottom of the existing pond. During site preparation, this muck will require removal. The muck is not suitable for use as structural fill. Although no groundwater was measured in our borings, wet soils should be expected in the bottoms of the ponds and drainage features. These soils will also likely be unstable under construction traffic and will likely require some undercutting to provide a stable base for compaction. In addition, spring activity may also be encountered. Temporary dewatering may also be required in these areas during construction to facilitate fill placement. Temporary dewatering can likely be accomplished with sumps and ditches. The need for permanent dewatering should be evaluated as the site plans progress further. BUILDING SUPPORT The existing residual soils and partially weathered rock, or controlled structural fill can provide proper support of floor slabs and shallow spread footing support of typical single story office/manufacturing buildings with column, wall, and floor loads in the anticipated range. Net allowable bearing pressures of from 3,000 to 4,000 pounds per square foot (psf) are recommended for preliminary design purposes. Note that generally, bearing pressures on fills are limited to 3,000 psf. We anticipate subgrade modulii for floor slab design to be between 100 and 120 pci, as related to a 30 inch plate. Within the portions of the building areas where soft and hard weathered rock and bedrock are exposed during site work, the hard materials should be overexcavated to reduce the effect of differing support conditions. The actual excavation depths will be contingent on the disturbance created by the excavation process. TRIGGN ENGINL•F_WNG ComsmTAATS, INC. Page 7 Mr. Koh Klouk, P. E., Land Design October 2, 2007 Stanley County Industrial Facihq7, Oakhoro, North Carolina 1 rig *nn ! ro1ectAl'o. 011-07-064 --.? _... Due to the expected depths of fill and anticipated loading, the consolidation of the fill must be substantially complete prior to foundation construction, to reduce the effects of differential settlement. Settlement of the fill should be monitored. We recommend settlement hubs be installed upon completion of fill placement, at a rate of l hub per 40,000 square feet of building area over fills greater than 15 feet in height. The elevations of the hubs should be monitored weekly- Once the rate of settlement approaches zero, foundation construction can begin. Based on the soil types in our borings, we expect the majority of the settlement to be complete within four (4) weeks after the completion of fill placement. Of concern are the localized areas of heavy loading. To reduce the effects of post construction settlement in these areas, consideration should be given to surcharge loading of these areas. The magnitude of the preload surcharge should be determined based on the anticipated equipment load. PAVEMENT SUPPORT The existing residual soils and partially weathered rock, or controlled structural fill can provide proper support for a pavement structure designed for appropriate subgrade strength and traffic characteristics. Based on our experience with the soil types encountered in the test borings, we anticipate CBR values in the range of 3 to 6, provided the subgrade is stable under proofrolling and positive base course and subgrade drainage is provided. FILL MATERIAL AND PLACEMENT Based on the results of our visual observations, the on-site residual soils and partially weathered rock appear suitable for use as project fill. Soils containing more than five (5) percent organic matter by weight, such as topsoil or soils from the bottoms of the drainage features, are not suitable for fill within structural areas. Any proposed offsite borrow soils should be properly tested to confirm the engineering properties prior to use. Drying or wetting may be required depending upon the time of year during which site grading is performed. As previously noted, excavated rock can be used as fill provided it is properly processed and blended. The processing technique should be based on construction of a test pad in the field. Mc,oN ENG1N&ER(NG CoAsuLTAA7'$ INC. Page 8 Mr. Rob Klauk, P.E., I and Design October 2, 2007 Stanley County Industrial Facility, Oakboro, North Carolina m_ Trigon Project .tin. 411-07-064 As noted above, the consolidation of the fill must be substantially complete prior to foundation construction, to reduce the effects of differential settlement- To reduce the consolidation magnitude and time, all fill within structural areas should be compacted to at least 98 percent of the Standard Proctor maximum dry density. EXCAVATION Generally, the on-site soils can be excavated with conventional construction equipment. However, where soft weathered rock (SPT N-value greater than 100 blows per foot but less than 50 blows per 0.1 foot) is present, loosening with a large dozer (D-8 or similar size) equipped with a single tooth ripper or a large track-mounted backhoe (Caterpillar 235 or similar size) may be required prior to removal. Hard weathered rock and bedrock (SPT N-value greater than 50 blows per 0.1 foot and unable to be excavated with the previously mentioned equipment) may require light blasting to excavate in utility and other confined excavations. If blasting is required, we recommend that it be performed prior to the start of any building frame construction. Blasting should be planned to remove the rock down to at least I foot below the lowest invert elevation required within the construction limits including foundations and utilities. Once blasting is completed, any loose rock should be removed and structural fill placed to construct the building pad_ GROUNDWATER CONTROL As previously noted, although no groundwater was measured in our borings, wet soils should be expected in the bottoms of the drainage features and creeks. As a result, temporary dewatering will be required to facilitate construction. The groundwater level can be temporarily lowered in smaller areas by pumping from sumps in the excavation bottoms. In larger areas in the bottoms of the drainage features and creeks, the flow of water will likely require temporary rerouting. This can be accomplished with sumps pumping to piping around the existing channel. Any water from active springs in the drainage features or streambeds should be properly routed away from the construction area. This can be accomplished with a springbox connected to solid pipe connected to a suitable outlet by gravity flow, or a trench drain. The trench drain should be properly filtered to prevent TRIGON ENGINEERING Coxsui TAA7S, INC. Page 9 Mr, Rob Klauk, P.E., Land Design October 2, 200? Stanley County Industrial Facility, Oakboro, North Carolina Trigon Project No. 011-07-064 the loss of fines from the surrounding soils into the system. The outlet of the trench drain should be terminated with solid pipe to a suitable outlet. CLOSURE We appreciate the opportunity to continue our services during this phase of the project. If there are any questions, please call. The recommendations are presented on the basis of our understanding of the project and through the application of generally accepted soil and foundation engineering practices. No other warranties, expressed or implied, are made. Should there be any changes in the scope of the project, as stated herein, we should be notified so that we may review these changes and modify our recommendations, if required. Trigon Engineering Consultants, Inc. appreciates the opportunity to continue our services to you on this project. If you have any questions or require additional information, please call. Respectfully, TRIGON ENGINEERING CONSULTANTS, INC. d? (? `7'1. Thomas R. Wells, E.I. Proje t Manager C. Wells, P. A. kQ-C' ---/ TRW/XCB/RC W:lss Attachments s: 10110 projects 12 00 710 1 1 0 706 41r107064. doc axe Rs sfi =4 41 TRlGONENGxEEIUNG CoAsULT.9N7S, INc. Page 10 APPENDIX / Stream C \\ 540 +550 ?B-1 -550 530.10 - 7 F B-6 / 540 B-3 540 'R-y i t \ 540 General. Plant Area ? i 530 r ` 1 \ \ /? ??? B-4 \ r . , 540 Stream P i POTID POND 520 530 a-Soil Test Boring L-^ 510 520 \ i n 11TRIGON, Trigon Engineering Consultants, Inc. 313 Gallimore Dairy Road Greensboro. North Carolina 27409 SCALE: 1300' f JDATE: 1 BY: XCBED I S 0525/07 HUNEYCUTT SITE DRAWING STANLEY COUNTY INDUSTRIAL FACILITY OAKBORO, NORTH CAROLINA BORING LOCATION PLAN Dwg. No. 011-07-064-1 Mr, Rob Klauk, P.E., Land Design October 2, 2007 Stanley County Industrial Facility, Oakboro, North Carolina Trigon Project No. ON-07-064 INVESTIGATIVE PROCEDURES Soil Test Borings Soil sampling and penetration testing for this project were performed in accordance with ASTM D 1586. The borings were advanced with hollow-stem, continuous flight augers and, at standard intervals, soil samples were obtained with a standard 1.4-inch I.D., 2 inch O.D., split-tube sampler. The sampler was first seated six (6) inches to penetrate any loose cuttings, then driven an additional foot with blows of a 140 pound hammer falling 30 inches. The number of hammer blows required to drive the sampler the final foot was recorded and is designated the "Standard Penetration Resistance" (N-Value). The Standard Penetration Resistance, when properly evaluated, is an index to soil strength, density, and ability to support foundations. Representative portions of each soil sample were placed in glass jars and taken to our laboratory. The samples were then examined by an engineer to verify the driller's field classifications. Test Boring Records are attached indicating the soil descriptions and Standard Penetration Resistances. TRR,ON ENGINEERING CONSULTMrIS, INC. TRIGON ENGINEERING CONSULTANTS, INC. BORING LOG PAGE 1 OF 1 PROJECT NO. 011-07-064 ID Na. COUNTY Stanley GEOLOGIST N. Brifkani SITE DESCRIPTION Stanley County Industrial Facility GROUND WATER (ft) BORING NO. B-1 BORING LOCATION OFFSET ALIGNMENT 0 HR Dry COLLAR ELEV. 552 ft NORTHING FASTING 24 HR, TOTAL DEPTH 8.3 ft DRILL MACHINE Mobile B-57 A DRILL METHOD HSA HAMMER TYPE 140 ib. Manual DATE STARTED 9119t07 COMPLETED 9119107 SURFACE WATER DEPTH ELEV. DEPTH BLOW COUNT BLOWS PER FOOT SAMP. T L O SOIL AND ROCK DESCRIPTION (ft) (ft) 0.5ft 0,5ft O Sft 0 20 40 60 80 100 NO. MOI G 552.0 552.0 0.00 551.0 1.0 Topsoil 9 12 14 . . . . SS-1 Damp Very Stiff Tan Fine Sandy SILT - 3 0 549 o 548 5 5 3 . RESIDUAL . . 12 24 42 SS-2 Moist Very Hard Grey Olive Fine Sandy SILT 5 5 5 546 546.0 6.0 . . Soft Weathered Rock Samples as Moist Tan 34 3 6010.4 SS-3 Olive Medium to Fine Sandy SILT 6010:4 543.7 8.3 Auger Refusal No Groundwater Encountered at Time of Boring k T i Bufk Sample 0.6 ft. to 8.3 ft. ) ) S ) ) ) ) f J S A J ) i TRIGON ENGINEERING CONSULTANTS, INC. BORING LOG PAGE 1 OF 1 PROJECT NO. 011-07-064 I ID No. COUNTY Stanley GEOLOGIST N. Brifkani SITE DESCRIPTION Stanley County Industrial Facility GROUND WATER (ft) BORING NO. B-2 BORING LOCATION OFFSET ALIGNMENT 0 HR. Dry COLLAR ELEV. 542 ft NORTHING EASTING 24 HR. TOTAL DEPTH 11.6 ft DRILL MACHINE Mobile B-57 A DRILL METHOD HSA HAMMER TYPE 140 lb. Manual DATE STARTED 9/19/07 COMPLETED 9119107 SURFACE WATER DEPTH ELEV. DEPTH BLOW COUNT BLOWS PER FOOT SAMP. - L O SOIL AND ROCK DESCRIPTION (ft) (ft) 0.sft 0.511 0.511 0 20 40 60 BO 100 t NO. M01 G 542,0 542 0 0. 1, 10 -Ma-fi Topsoil - 9 14 21 35 SS-1 Moist Hard Tan Brown Fine Sandy SILT - 3 0 139 0 538.5 3.5 . ' RESIDUAL 11 10 16 26 - SS-2 Moist Very Stiff White Brown Fine Sandy SILT 5 5 5 536 536.0 6.0 - . . - Hard Tan Olive Medium to Fine Moist Ver 16 21 30 51 SS-3 y Sandy SILT v?6th Rock Fragments 533.5 8.5 . . . . . . 18 3D 34 rq SSA - - 531 0 11.0 530.4 11.6 . . . . . . . Soft Weathered Rock - No Sample Recovered 6010.2 SS-5 Auger Refusal No Groundwater Encountered at Time of Boring TRIGON ENGINEERING CONSULTANTS, INC. BORING LOG PAGE 1 OF 1 PROJECT NO. 011-07-064 ID No. COUNTY Stanley GEOLOGIST N. Brifkani SITE DESCRIPTION Stanley County Industrial Facility GROUND WATER (ft) BORING NO. B-3 BORING LOCATION OFFSET ALIGNMENT 0 HR. Dry COLLAR ELEV. 540 ft NORTHING EASTING 24 HR. TOTAL DEPTH 4.2 ft DRILL MACHINE Mobile 8-57 A DRILL METHOD HSA HAMMER TYPE 140 lb. Manual DATE STARTED 9120107 COMPLETED 9120107 SURFACE WATER DEPTH ELEV. DEPTH BLOW COUNT BLOWS PER FOOT SAMP. - L O SOIL AND ROCK DESCRIPTION (ft} (K) 0.5fl 0.5ft 0.5ft 0 20 40 60 80 100 NO. Mpl G 540.0 540.0 0.00 539.0 1.0 Topsoil 12 16 42 s. _ SS-1 Damp Very Dense Tan Silty Medium to Fine 3 0 7 536.5 3.5 . 53 .0 SAND with Rock Fragments - RESIDUAL 010 2 soro2 42 535-s S d R l D T ft W th k S amp es as amp an o ea ere oc Grey Silty Medium to Fine SAND with Rods Fragments 1 I 1 1 I Auger Refusal No Groundwater Encountered at Time of Boring ? TRIGON ENGINEERING CONSULTANTS, INC. BORING LOG PAGE 1 OF 1 PROJECT NO. 011-07-064 ID N.. COUNTY Stanley GEOLOGIST N. Brifkani SITE DESCRIPTION Stanley County Industrial Facility GROUND WATER (ft) BORING NO. B-4 BORING LOCATION OFFSET ALIGNMENT 0 HR Dry COLLAR ELEV. 540 ft NORTHING EASTING 24 HR TOTAL DEPTH 14.2 ft DRILL MACHINE Mobile B-57 A DRILL METHOD HSA HAMMER TYPE 140 lb. Manual DATE STARTED 9/20107 COMPLETED 9/20/07 SURFACE WATER DEPTH ELEV. DEPTH BLOW COUNT BLOWS PER FOOT SAMP. - L O SOIL AND ROCK DESCRIPTION (ft) (ft) 0.5ft a5ft 0.5ft D 20 4D 60 BO 100 NO. MOi G 540.0 I 540.0 D.00 39. 1.0 53n I Disturbed Soil 07 9 14 60/0.4 . . . . . SS -1 + Soft Weathered Rock Samples as Damp 536.5 3.5 3.0 5320 While Tan Silty Medium to Fine SAND with 46 60/02 solo.z SS-2 Rook Fragments 534.0 6.0 534.5 Soft Weathered Rock Samples as Moist Grey 5.5 6010.2 6010,2 SS-3 Tan Silty Medium to Fine SAND w th Rock Fragments 531.5 8.5 Moist Tan d R k S l S ft W th 60!0 2 6Dl42 SS-4 amp es as ea ere oc o . Olive Medium to Fine Sandy SILT with Rock I N Fragments T - 527.0 13.0 526.5 13.5 - as Moist Olive l th d R k S S ft W 010 2 sao.z ere oc amp es 14.2 o ea 525 6 Medium to Fine Sandy SILT Auger Refusal No Groundwater Encountered at Time of Boring Bulk Sample 0.7 ft. to 14.2 ft. f r i T I 1 r - t t t I I i? TRIGON ENGINEERING CONSULTANTS, INC. BORING LOG PAGE 1 OF 1 J 011-07-064 ID No. COUNTY Stanley GEOLOGIST N. Brifkani PROJECT NO . GROUND WATER (it) SITE DESCRIPTION Stanley County Industrial Facility BORING NO. B-5 BORING LOCATION _ OFFSET ALIGNMENT 0 HR. Dry COLLAR ELEV. 544 ft NORTHING EASTING 24 HR. TOTAL DEPTH 19.9 ft DRILL MACHINE Mobile B-57 A DRILL METHOD HSA HAMMER TYPE 140 lb. Manual ACE WATER DEPTH SU DATE STARTED 9/20107 COMPLETED 9120107 DEPTH BLOW COUNT t :7 BLOWS PER FOO Z L p SOIL AND ROCK DESCRIPTION (ft) 050 05ft 0.5ft 0 20 40 60 F G F ,544 0 544.0 0.00 . 543.0 1.D Topsoil i M t l 39 6010 5 BOro.5 SS-1 o s es as Soft Weathered Rock Samp 3 0 . . . 541.0 Yellow Tan Medium to Fine Sandy SILT with 540.5 3.5 6010 4 Rock Fragments 6010.4 . S8_2 5, 5 539.5 Soft Weathered Rock Samples as moist Tan 538.0 6.0 _ . . . - . . Fine Sandy SILT with Rock Fragments 42 32 34 SS-3 9.0 Dense Red Brown Silty Medium to 536 0 Moist Ver 535.5 8.5 ,_, . y Fine SAND _ l! 32 21 21 62' SS 4 Mas! Hard Tan Brown Fine Sandy SILT with Manganese 531.0 13.0 53D.5 13.5 - 6010 3 Soft Weathered Rock Samples as Moist Tan 60!0.3 . SS-5 Olive Medium to Fine Sandy SILT with Rock . . . Fragments 17 0 . 527.0 Hard Weathered Rods Samples as Moist Tan 525.5 1B5 _ Borg 1 Olive Medium to Fine Sandy SILT with Rock 19 9 6010,1 - - - - - - SS's . 524.1 Fragments Auger Refusal No Groundwater Encountered at Time of Boring T I Bulk Sample 0.5 ft. to 19.9 ft o N O_ Q (7 1 Q a Z 0. L1 v b 0 ti b s J 1 K w z w U E H O G TRIGON ENGINEERING CONSULTANTS, INC. BORING LOG PAGE 1 OF 1 PROJECT NO. 011-07-064 ID No. COUNTY Stanley , GEOLOGIST N. Brifkani SITE DESCRIPTION Stanley County Industrial Facility GROUND WATER (ft) BORING NO. B-7 BORING LOCATION OFFSET ALIGNMENT D HR- Dry COLLAR ELEV. 512 ft NORTHING EASTING 24 HR. TOTAL DEPTH 5.5 ft DRILL MACHINE Mobile B-57 A DRILL METHOD HSA HAMMER TYPE 140 lb. Manual DATE STARTED 9/20107 COMPLETED 9120107 SURFACE WATER DEPTH ELEV. DEPTH BLOW COUNT BLOWS PER FOOT SAMP. 7/ L O SOIL AND ROCK DESCRIPTION (ft) (ft) O.Sft 0.5ft 0-5ft 0 2D 4,0 60 80 too NO MC, t G 512.0 512.0 0. 11.0 1.0 Topsoil 6010.3 W9.3 SS-1 Soft Weathered Rock Samples as Moist Tan 3 5 sos 0 M SILT with Rock 30 dium to Fine Sand 508.5 . . . . . . . . y e 42 6010.4 . . sor0 a SS-2 Fragments soe.e Soft Weathered Rock Samples as Moist Tan Ss Olive Silty Medium to Fine SAND with Rock Fragments I Auger Refusal I No Groundwater Encountered at Time of Z Boring - f r ? f TRIGON ENGINEERING CONSULTANTS, INC. BORING LOG PAGE 1 OF 3 PROJECT NO. 011-07-064 ID No. COUNTY Stanley GEOLOGIST N. Brifkani SITE DESCRIPTION Stanley County Industrial Facility GROUND WATER (ft) BORING NO. B-8 BORING LOCATION OFFSET ALIGNMENT 0 HR. Dry COLLAR ELEV. 530.0 ft NORTHING EASTING 24 HR TOTAL DEPTH 1.5 ft DRILL MACHINE Mobile B-57 A RILL METHOD NSA HAMMER TYPE 140 lb. Manual DATE STARTED 9120107 COMPLETED 9120107 SURFACE WATER DEPTH ELEV. DEPTH BLOW COUNT BLOWS PER FOOT SAMP. 7V L O SOIL AND ROCK DESCRIPTION (ft) (ft) 0.5ft 0.5ft 0.5ft 20 40 60 80 100 Np O G 530.0 530.0 0.00 529.0 1.0 Topsoil 4 10.1 SS-1 Haiti Weathered Rock Samples as Moist White Tan Silty Medium to Fine SAND with ock Fragments Auger Refusal I No Groundwater Encountered at Time of Boring L - L E- r I I i L t \ I I / \ I / FFF /IBA Lain ??? \\ \ PRO- i?M ®? r / / i TRIGON ENGINEERING CONSULTANTS, INC. BORING LOG PAGE 1 OF 1 PROJECT NO. 011-07-064 ID No. COUNTY Stanley GEOLOGIST N. Britkani SITE DESCRIPTION Stanley County Industrial Facility GROUND WATER (ft) BORING NO. B-1 BORING LOCATION OFFSET ALIGNMENT 0 HR. Dry COLLAR ELEV. NORTHING EASTING 24 HR. TOTAL DEPTH 8.3 ft DRILL MACHINE Mobile B-57 A DRILL METHOD HSA HAMMER TYPE 140 lb. Manual DATE STARTED 9119/07 COMPLETED 9/19/07 SURFACE WATER DEPTH ELEV. DEPTH BLOW COUNT BLOWS PER FOOT SAMP. / L (ft) O 5ft 0 5ft 05ft 0 20 40 60 80 10D NO 7 ol O G SOIL AND ROCK DESCRIPTION _ . D 1.0 Topsoil 9 12 14 26 SS-1 Damp Very Stiff Tan Fine Sandy SILT - 3.5 3.0 RESIDUAL 12 24 42 fib SS-2 Moist Very Hard Grey Olive Fine Sandy SILT 6.0 5.5 34 3 60104 SS-3 Soft Weathered Rock Samples as Moist Tan Oli M di F 60/0A . . . . . . . . . . . . . . . . . . . . ve e um to ine Sandy SILT 6.3 Auger Refusal No Groundwater Encountered at Time of Boring TRIGON ENGINEERING CONSULTANTS, INC. BORING LOG PAGE 1 OF 1 PROJECT NO. 011-07-064 ID No. COUNTY Stanley GEOLOGIST N. Brifkani SITE DESCRIPTION Stanley County Industrial Facility GROUND WATER (ft) BORING NO. B-2 BORING LOCATION OFFSET ALIGNMENT 0 HIRDry COLLAR ELEV. NORTHING EASTING 24 HR. TOTAL DEPTH 11.6 ft DRILL MACHINE Mobile B-57 A DRILL METHOD HSA HAMMER TYPE 140 lb. Manual DATE STARTED 9/19/07 COMPLETED 9/19/07 _ SURFACE WATER DEPTH ELEV DEPTH BLOW COUNT BLOWS PER FOOT SAMP. L (ft) (ft) 0.5ft 0.5ft 0.5ft 0 2,0 40 60 80 1,01 NO 701 O G SOIL AND ROCK DESCRIPTION o. 1.0 Topsoil 9 14 21 35 SS-1 Moist Hard Tan Brown Fine Sandy SILT - 3.5 3.0 RESIDUAL 11 10 16 zs SS-2 Moist Very Stiff White Brown Fine Sandy SILT 6.0 5.5 16 21 30 51 SS-3 Moist Very Hard Tan Olive Medium to Fine Sandy SILT with Rock Fragments 8.5 18 30 34 SS-4 11 6 . 60/0 2 SS-5 Soft Weathered Rock - No Sample Recovered . Auger Refusal No Groundwater Encountered at Time of Boring TRIGON ENGINEERING CONSULTANTS, INC. BORING LOG PAGE 1 OF 1 PROJECT NO. 011-07-064 ID No. COUNTY Stanley GEOLOGIST N. Brifkani SITE DESCRIPTION Stanley County Industrial Facility GROUND WATER (ft) BORING NO. B-3 BORING LOCATION OFFSET ALIGNMENT 0 HR. Dry COLLAR ELEV. NORTHING E EASTING 24 HR. TOTAL DEPTH 4.2 ft DRILL MACHINE Mobile B-57 A DRILL METHOD HSA HAMMER TYPE 140 lb. Manual DATE STARTED 9/20/07 COMPLETED 9/20/07 SURFACE WATER DEPTH ELEV. DEPTH BLOW COUNT BLOWS PER FOOT SAMP. L (ft) (ft) 0.5ft D 5ft O.Sft 0 20 40 60 80 100 NO MOI 0 G SOIL AND ROCK DESCRIPTION 0. 1.0 Topsoil -- - 12 16 42 58 SS-1 Damp Very Dense Tan Silty Medium to Fine 3.5 3.0 SAND with Rock Fragments - RESIDUAL 0/0 2 . . 6a0.2 4.2 Soft Weathered Rock Samples as Damp Tan ?6n=_y Silty Medium to Fine SAND with Rock Fragments Auger Refusal No Groundwater Encountered at Time of Boring TRIGON ENGINEERING CONSULTANTS, INC. BORING LOG PAGE 1 OF 1 PROJECT NO. 011-07-064 ID No. COUNTY Stanley GEOLOGIST N. Brifkani SITE DESCRIPTION Stanley County Industrial Facility GROUND WATER (ft) BORING NO. B-4 BORING LOCATION OFFSET ALIGNMENT 0 HR. Dry COLLAR ELEV. NORTHING EASTING 24 HR. TOTAL DEPTH 14.2 It DRILL MACHINE Mobile B-57 A DRILL METHOD HSA HAMMER TYPE 140 lb. Manual DATE STARTED 9/20/07 COMPLETED 9120/07 SURFACE WATER DEPTH ELEV DEPTH BLOW COUNT BLOWS PER FOOT SAMP. L (ft) (ft) 0.5ft 0.5ft 0.5ft 0 20 40 60 BO 100 NO. MOI 0 G SOIL AND ROCK DESCRIPTION 0. 1.0 0 7 9 14 60/0.4 4 P SS-1 1 Soft Weathered Rock Samples as Damp 3.5 4 White Tan Silty Medium to Fine SAND with 3.0 46 60/02 60/0241 \ SS-2 Rock Fragments W th d R l k 6.0 ea ere oc Samp es as Moist Grey Tan 5.5 Silt M di t Fi SAN 60/0 2 solo 2 40 SS-3 e um y o ne D with Rock Fragments 8.5 Soft Weathered Rock Sam les as Moist Tan 13.5 6010.2 60a2 SS?I p Olive Medium to Fine Sandy SILT with Rock Fragments 13.0 0/0.2 . . . . . . . ......... + .6010.2 30 Soft Weathered Rock Samples as Moist Olive 14.2 Medium to Fine Sandy SILT Auger Refusal No Groundwater Encountered at Time of Boring TRIGON ENGINEERING CONSULTANTS, INC. BORING LOG PAGE 1 OF 1 PROJECT NO. 011-07-064 ID No. COUNTY Stanley GEOLOGIST N. Brifkani SITE DESCRIPTION Stanley County Industrial Facility GROUND WATER (ft) BORING NO. B-5 BORING LOCATION OFFSET ALIGNMENT 0 HR Dry COLLAR ELEV. NORTHING EAS71NG 24 HR. TOTAL DEPTH 19.9 It DRILL MACHINE Mobile B-57 A DRILL METHOD HSA HAMMER TYPE 140 lb. Manual DATE STARTED 9/20/07 COMPLETED 9/20/07 SURFACE WATER DEPTH ELEV DEPTH BLOW COUNT BLOWS PER FOOT SAMP 7 L (ft) (ft) O.Sft O Sft O.Sft 0 20 40 60 80 100 NO MOI O G SOIL AND ROCK DESCRIPTION o. 1.0 Topsoil 39 6010.5 60/0.5 SS-1 Soft Weathered Rock Samples as Moist 3.5 Yellow Tan Medium to Fine Sandy SILT with 3.0 6 0 60/0.4 6010.4 SS-2 Rock Fragments Weathered Rock Samples as Moist Tan Fine 5.5 . 42 32 34 se SS-3 Sandy SILT with Rods Fragments 8 5 Moist Very Dense Red Brown Silty Medium to 8.0 . 32 21 21 SS-4 Fine SAND 13 5 2 Moist Hard Tan Brown Fine Sandy SILT with Manganese 13.0 . 10.5 60/0-3 60/0340 SS-5 Soft Weathered Rods Samples as Moist Tan Olive Medium to Fine Sandy SILT with Rods Fragments 60/0 1 6010140 tss Auger Refusal No Groundwater Encountered at Time of Boring TRIGON ENGINEERING CONSULTANTS, INC. BORING LOG PAGE 1 OF 1 PROJECT NO. 011-07-064 ID No. COUNTY Stanley GEOLOGIST N. Brifkani SITE DESCRIPTION Stanley County Industrial Facility GROUND WATER (ft) BORING NO. B-6 BORING LOCATION OFFSET ALIGNMENT 0 HIR Dry COLLAR ELEV. NORTHING EASTING 24 HR. TOTAL DEPTH 21 ft DRILL MACHINE Mobile B-57 A DRILL METHOD HSA HAMMER TYPE 140 lb. Manual DATE STARTED 9/20107 COMPLETED 9/20/07 SURFACE WATER DEPTH ELEV. DEPTH BLOW COUNT BLOWS PER FOOT SAMP V/ L O SOIL AND ROCK DESCRIPTION (ft) (ft) 05ft 0.5ft 05ft 0 20 40 60 80 100 N 7 OI G 0. 1 1.0 6010.1 . . . . . . . . . . . . 6010.1 ....... SS 1 Soft Weathered Rock Samples as Moist Grey 2.2 Medium to Fine Sandy SILT with Rock Fragments No Groundwater Encountered at Time of Boring `First Attempt Moved up to 3 ft TRIGON ENGINEERING CONSULTANTS, INC. BORING LOG PAr,F 1 OF 1 PROJECT NO. 011-07-064 ID No. COUNTY Stanley GEOLOGIST N. Brifkani SITE DESCRIPTION Stanley County Industrial Facility GROUND WATER (ft) BORING NO. B-7 BORING LOCATION OFFSET ALIGNMENT 0 HR. Dry COLLAR ELEV. NORTHING EASTING 24 HR. TOTAL DEPTH 5.5 ft DRILL MACHINE Mobile B-57 A DRILL METHOD HSA HAMMER TYPE 140 lb. Manual DATE STARTED 9/20/07 COMPLETED 9/20/07 SURFACE WATER DEPTH ELEV DEPTH BLOW COUNT BLOWS PER FOOT SAMP V/ L (ft) (ft) O Sft 0.5ft 0.5ft 0 2,0 40 60 80 100 NO. 7 O O I G SOIL AND ROCK DESCRIPTION 0 00 1 .0 . To il 60/0 3 60/0341 pso p-LL 3.5 . SS-1 -- Soft Weathered Rock Samples as Moist Tan 3.0 Medi t Fi S d SILT i h 42 60/0.4 60IM0440 SS-2 um o ne an y w t Rock Fragments 5 5 Weathered R k S l M i . oc amp es as o st Tan Olive Silty Medium to Fine SAND with Rock Fragments Auger Refusal No Groundwater Encountered at Time of Boring TRIGON ENGINEERING CONSULTANTS, INC. BORING LOG PAGE 1 OF 1 PROJECT NO. 011-07-064 ID No. COUNTY Stanley GEOLOGIST N. Brifkani SITE DESCRIPTION Stanley County Industrial Facility GROUND WATER (ft) BORING NO. B-8 BORING LOCATION OFFSET ALIGNMENT 0 HR. Dry COLLAR ELEV. NORTHING EASTING 24 HR. TOTAL DEPTH 1.5 It DRILL MACHINE Mobile B-57 A DRILL METHOD HSA HAMMER TYPE 140 lb. Manual DATE STARTED 9120/07 COMPLETED 9/20/07 SURFACE WATER DEPTH ELEV DEPTH BLOW COUNT BLOWS PER FOOT SAMP- L (ft) (ft) 0.5ft O.Sfl O Sft 0 20 40 60 80 700 , NO MOI O G SOIL AND ROCK DESCRIPTION 0.0c 0 Topsoil - -42-- -6010.1- SS-1 Soft Weathered Rock Samples as Moist White Tan Silty Medium to Fine SAND with Rock Fragments Auger Refusal No Groundwater Encountered at Time of Boring