Loading...
HomeMy WebLinkAboutNCC190194_NOT Closeout Documents_20201211uuau�ailf �aq.f r JOHNSTON COUNTY PUBLIC UTILITY DEPARTMENT SEDIMENTATION INSPECTION REPORT 309 E. MARKET STREET, SMITHFIELD, N C 27577-TELEPHONE (919) 209-8333 Inspection Information Date: 12/4/2020 Type of Inspection ❑ Initial Inspection Construction Stage ❑ Pre -Construction Date of Inspection: 12/2/2020 ❑ Routine Site Inspection ❑ Initial Grading Inspection by: Shannon Stanley ❑ On -Site Meeting ❑ Infrastructure El Progress Inspection El Temp, Site Stabilization Others Present: Click or tap here to enter ❑X Final Inspection ElVertical tee ❑ Plat Inspection ❑X Final Site Stabilization Photos: ❑ Yes ❑X No ❑ Spot Check Inspection ❑ Complaint Inspection Weather and Site Conditions: Sunny and workable Development/Owner Information Project Name: Mason Pointe Project Number: 18-109-P Project Location: River run rd This Report Sent To: Cary Chandler Email: Click or tap here to enter text. ❑ File Copy Land Owner of Record: Person Financially Responsible for Land Disturbing Insert Land Owner. Activity: ❑ Same as owner Click or tap here to enter text. 6. Comments/Notes: This site is sufficiently stabilized and the erosion control permit for Johnston County is now closed out. 7. Corrective Actions: a. n/a 8. Photos: n/a