HomeMy WebLinkAboutNCC190194_NOT Closeout Documents_20201211uuau�ailf �aq.f r
JOHNSTON COUNTY PUBLIC UTILITY DEPARTMENT
SEDIMENTATION INSPECTION REPORT
309 E. MARKET STREET, SMITHFIELD, N C 27577-TELEPHONE (919) 209-8333
Inspection Information
Date: 12/4/2020
Type of Inspection
❑ Initial Inspection
Construction Stage
❑ Pre -Construction
Date of Inspection: 12/2/2020
❑ Routine Site Inspection
❑ Initial Grading
Inspection by: Shannon Stanley
❑ On -Site Meeting
❑ Infrastructure
El Progress Inspection
El Temp, Site Stabilization
Others Present: Click or tap here to enter
❑X Final Inspection
ElVertical
tee
❑ Plat Inspection
❑X Final Site Stabilization
Photos: ❑ Yes ❑X No
❑ Spot Check Inspection
❑ Complaint Inspection
Weather and Site Conditions:
Sunny and workable
Development/Owner Information
Project Name: Mason Pointe
Project Number: 18-109-P
Project Location: River run rd
This Report Sent To: Cary Chandler
Email: Click or tap here to enter text.
❑ File Copy
Land Owner of Record:
Person Financially Responsible for Land Disturbing
Insert Land Owner.
Activity: ❑ Same as owner
Click or tap here to enter text.
6. Comments/Notes:
This site is sufficiently stabilized and the erosion control permit for Johnston County is now
closed out.
7. Corrective Actions:
a. n/a
8. Photos:
n/a