Loading...
HomeMy WebLinkAbout20061144 Ver 7_More Info Received_20101004o(.0 - It'+ L? ARCADIS Infrastructure, environment, buildings Mr. Jamie Shern Raleigh Regulatory Field Office US Army Corps of Engineers 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 919.554.4884 Subject: DE Benton Stream Restoration Dear Jamie: a?[EGWP 0 C T 4 2010 DENR . WATER QUALITY WETLANDS AND STORM.WATER BRANCH The purpose of this letter is to provide background information and recommended solutions related to the intermittent stream that was impacted due to failed erosion control measures, as noted in the Notice of Violation (NOV) issued by the North Carolina Division of Water Quality (NCDWQ) on February 16, 2010 (NOV-2010-PC- 0192). The Action ID Numbers associated with this project are 200320193, 200620626-200620628, and Nationwide Permit Numbers 12 and 39. The NCDWQ Project Number associated with this project is 06-1144. ARCADIS conducted a site assessment on February 26, 2010 in response to the NOV to quantify impacts and provide recommendations for restoration. ARCADIS submitted a letter to NCDWQ on March 30, 2010 detailing the impacts and recommended restoration at the DE Benton site. The stream restoration consisted of placing log step structures along the length of the impacted stream (approximately 100 linear feet), grading and installation of erosion control matting on the stream banks, and planting the stream banks with live stakes. Sediment was also removed from the wetland downstream of the impacted stream. The restoration work began on June 9, 2010 and was completed on July 9, 2010. The week of August 23, 2010 the site received over 4 inches of rain and the log step structures experienced severe erosion, causing bank failure in several places. The stream bed also scoured out between some of the log structures. The sediment that eroded during this storm event was washed downstream into the wetland just north of the sewer easement. This is a portion of the same wetland that sediment was removed from during the restoration activities in June 2010. Based on our phone conversation on Friday September 10, 2010, ARCADIS is proposing to use rip-rap Imagine the result ARCADIS G&M of North Carolina, Inc. 801 Corporate Center Drive Suite 300 Raleigh North Carolina 27607 Tel 919.854.1282 Fax 919.854.5448 www.arcadis-us.com Water Resources Date: September 30, 2010 Contact: Ben Furr Phone: 919.630.1680 Email: Ben.Furr@arcadis-us.com Our ref: N C703027.1000 ARCADIS G&M of North Carolina, Inc. NC Engineering License N C-1869 NC Surveying License N C-1869 g:\wwm\703027.1000\impact analysisVetter to jamie shern.doc ARCADIS stabilization along the length of the channel to stabilize the stream bed and banks, as opposed to repairing the log steps. The rip-rap should provide better stream stability in the near term and long term scenarios. The sediment that was deposited in the wetland will be removed by hand using shovels, buckets, and wheelbarrows, as before. The attached figure depicts the stream profile prior to construction of the water treatment plant (Original/Proposed Profile), overlain with the stream profile that was surveyed immediately after issuance of the NOV (Existing Profile). Cross sections were also surveyed immediately after issuance of the NOV and are depicted on the figure. The profiles show that the stream incised between 0.5' and 2.0' in several areas after the DE Benton Water Treatment Plant was constructed. The stream banks depicted on the cross sections provide a good representation of existing conditions because very little bank erosion had occurred at the time the survey was completed. As shown in the Proposed Cross Sections, ARCADIS will excavate approximately 24 inches of the stream bed and banks, where necessary, and replace with Class II rip-rap to restore the stream to original contours. The excavated material will be disposed of off-site. Geotextile fabric will be placed underneath the rip-rap as required in the Erosion and Sediment Control Manual. I have also attached design calculations that show the channel dimensions associated with the 10 year storm. The rip-rap will extend along the stream banks to approximately 1 foot above the elevation of the 10 year storm. Class II rip-rap will comply with NCDOT Standard Specification Section 1042 (attached). Once we have received written approval of this plan from the USACE and NCDWQ, ARCADIS will coordinate with the City of Raleigh to begin the stream stabilization and removal of sediment from the wetland. If you have any questions please contact me at 919.630.1680. Sincerely, ARCADIS GSM of North Carolina, Inc. Ben Furr Environmental Scientist Copies: Ian McMillan - NCDWQ Perry Allen - City of Raleigh GAMA703027-1000Umped AnW paUtter to Janie Sham.tloc Natalie Landry - NCDWQ File Mr. Jamie Shern September 30, 2010 Page: 2/2 Channel Report Hydraflow Express Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. Tuesday, Sep 28 2010 X-2 10 Year Flow C User-defined Highlighted Invert Elev (ft) = 222.50 Depth (ft) = 1.46 Slope (%) = 5.85 Q (cfs) - = 34.59 N-Value = 0.043 Area (sqft) = 5.13 Velocity (ft/s) = 6.74 Calculations Wetted Perim (ft) = 6.99 Compute by: Known Q Crit Depth, Yc (ft) = 1.64 Known Q (cfs) = 34.59 Top Width (ft) = 6.07 EGL (ft) = 2.17 (Sta, El, n)-(Sta, El, n)... (0.00, 230.00)-(0.10, 227.40, 0.043)-(3.00, 226.80. 0.043)-(5.00, 225.20, 0.043)-(7.00, 223.30,0.043)-(8.00, 223.00, 0.043)-(8.20, 222.70, 0.043) -(8.50, 222.50, 0.043)-(8.70,222.70, 0.043)-(10.30,222.80, 0.043)-(12.00, 223.70, 0.043)-(14.00, 225.10, 0.043)-(16.00, 225.00, 0.043)-(18.00, 224.50, 0.043) -(18.10, 230.00, 0.043) Elev (ft) Section 231.00 230.00 229.00 228.00 227.00 226.00 225.00 224.00 0 --- 223.00 Depth (ft) 8.50 7.50 6.50 5.50 4.50 3.50 2.50 1.50 0.50 222.00 -0.50 221.00 1 50 2 0 2 4 6 8 10 12 14 16 18 20 22 Sta (ft) Channel Report Hydraflow Express Extension for AutoCAD® Civil 308 2009 by Autodesk, Inc. Tuesday, Sep 28 2010 X-1 10 Year Flow + 13) User-defined Highlighted Invert Elev (ft) = 219.60 Depth (ft) = 2.01 Slope (%) = 5.85 Q (cfs) = 34.59 N-Value = 0.043 Area (sqft) = 5.19 Velocity (ft/s) = 6.67 Calculations Wetted Perim (ft) = 7.24 Compute by: Known Q Crit Depth, Yc (ft) = 2.16 Known Q (cfs) = 34.59 Top Width (ft) = 5.28 EGL (ft) = 2.70 (Sta, El, n)-(Sta, El, n)... (0.00, 230.00)-(0.10, 223.80, 0.043)-(5.00, 222.00, 0.043)-(7.50, 221.10,0.043)-(8.50, 220.80, 0.043)-(9.00, 219.70, 0.043)-(9.50,219.60,0.043) -(10.50, 219.90, 0.043)-(11.00, 221.10, 0.043)-(12.00, 222.50, 0.043)-(14.00, 224.40, 0. 043)-(16.00, 224.40, 0.043)-(16.10, 230.00, 0.043) Elev (ft) Section 231.00 229.00 227.00 225.00 223.00 221.00 219.00 217.00 Depth (ft) 11.40 9.40 7.40 5.40 3.40 1.40 -0.60 _o an 0 2 4 6 8 10 12 14 16 18 20 Sta (ft) Section 1040 1040-7 WATER Water shall meet the requirements of Article 1024-4. 1040-8 MORTAR Mortar used in all brick masonry and block masonry shall be proportioned as shown below for either mix No. 1 or No. 2. All proportions are by volume. Do not add any more water than is necessary to make a workable mixture. Mix No. 1: 1 part portland cement 1 /4 part hydrated lime 3 3/4 parts mortar sand (maximum) Mix No. 2: 1 part portland cement 1 part masonry cement 6 parts mortar sand (maximum) The requirements of Articles 1040-4, 1040-5, 1040-6, and 1040-7, are applicable to all cement, hydrated lime, mortar sand, and water. For the hydrated lime and cement portion of Mix No. l,the Contractor may substitute Type M or Type S masonry cement that meets ASTM C270 For Type S masonry cement the minimum compressive strength of the test specimens shall be 2500 psi at 28 days and the test specimens shall be composed of 1 part Type S masonry cement and 3 parts sand. Furnish a .Type 3 certification for the Type M or Type S masonry cement. 1040-9 CEMENT GROUT Use cement grout that consists of a mixture of 1 part portland cement to 3 parts mortar sand with no more water than is necessary to make a workable mixture. Apply the requirements of Article 1040-4, 1040-6, and 1040-7 to all cement, mortar sand, and water. SECTION 1042 RIPRAP MATERIALS 1042-1 PLAIN RIPRAP Stone for plain riprap consists of field stone or rough unhewn quarry stone. The stone shall be sound, tough, dense, resistant to the action of air and water, and suitable in all other respects for the purpose intended. Where broken concrete from demolished structures or pavement is available, it may be used in place of stone provided that such use meets with the approval of the Engineer. However, the use of broken concrete that contains reinforcing steel will not be permitted. All stone shall meet the approval of the Engineer. While no specific gradation is required, there should be equal distribution of the various sizes of the stone within the 10-83 Section 1042 required size range. The size of an individual stone particle will be determined by measuring its long dimension. Stone or broken concrete for riprap shall meet the requirements of Table 1042-1 for the class and size distribution. TABLE 1042-1 ACCEPTANCE CRITERIA FOR RIPRAP AND STONE FOR EROSION CONTROL REQUIRED STONE SIZES - INCHES CLASS MINIMUM MIDRANGE MAXIMUM A 2 4 6 B 5 8 12 1 5 10 17 2 9 14 23r No more than 5.0% of the material furnished can be less than the minimum size specified nor no more than 10.0% of the material can exceed the maximum size specified. 1042-2 TESTING Test riprap materials in accordance with the requirements of this section and Sections 1005-4(E) Resistance to Abrasion, and 1005-4(F) Soundness. Satisfactory resistance to abrasion will be considered to be a percentage of wear of not greater than 55 percent. Satisfactory soundness will be considered to be a loss in weight of not greater than 15 percent when subjected to 5 alterations of the soundness test. SECTION 1044 SUBSURFACE DRAINAGE MATERIALS 1044-1 SUBDRAIN FINE AGGREGATE The subdrain fine aggregate shall meet the gradation requirements for No. 2S or No. 2MS sand as shown in Table 1005-2. 1044-2 PIPE AND FITTINGS--GENERAL Pipe and fittings may be, at the option of the Contractor, either concrete, corrugated steel, bituminized fiber, or corrugated plastic. 1044-3 CONCRETE PIPE AND FITTINGS Non-perforated concrete pipe and pipe fittings shall meet the requirements of AASHTO M86 for standard strength nonreinforced concrete pipe. Perforated concrete pipe shall meet the requirements of AASHTO M175 for standard strength perforated nonreinforced concrete underdrainage pipe. Joint materials shall meet the requirements of Section 1028. 10-84 Non-Woven Geotextile Fabric: The non-woven geotextile fabric shall meet the following: PHYSICAL PROPERTIES Units Results Grab Tensile Strength kN (Ibs) 0.900 (203) ASTM D 4632 Grab Tensile Elongation % 50 ASTM D 4632 Mullen Burst Strength kPa (psi) 2619 (380) ASTM D 3786 Trapezoidal Tear Strength kN (Ibs) 0.355 (80) ASTM D 4533 Puncture Strength kN (Ibs) 0.575 (130) ASTM D 4833 UV Resistance after 500 hrs. % Strength 70 ASTM D 4355 HYDRAULIC PROPERTIES Apparent Opening Size (AOS) mm (US Sieve) 0.150 (100) ASTM D 4751 Permittivity ASTM D 4491 sec -1 1.5 Flow Rate ASTM D 4491 gal/min/sf 110 I/min/sm 4470 Roll Width m (ft) 4.57 (15) 5.5(18) Roll Length m (ft) 91.5 (300) 76(250) Est. Gross Weight kg (lb) 134 (295) Area m2 (yd2) 418(500) [Tr ?$y } ?? ? .+M . ..•" , C? t W P b T.i'.. E Y«....f.. . ? r ? THS ] .1 ??. .f . ? d ! , r -• t 440 °.i.p+ _..l ...: .p.; i.f. .v a.. .. :.. .P q . f i ° x -3 f .? i- f : t 7 ? it T . D .?.+' ? , t si"f'P ...1- t ! Y .{.?. .{... .t .Y..q 3 . ..: .:. h J_ i Y t I Y a { ! Q {!!tr Q + a ¢ n I , a , 'T y e. y '7 q'" tr r 1 :1 1 W .. ?. q , . ... } t }. i • All 1 W { •... . ? { i .. { > .yam. {_ i. - tt' 9- >> y r t -1- 11 0. -?- K t t tr t- 4? 4: i .q ..{.. ? .. jt t } .. Y t ! q 7 ? a • yv 44 e1 1..F 44 -L.: .. 1 q : N a- f Old 1911 3 ..l t. - Q ii t t } y .Y.. .. ' l. 7 '}'. J t •1 m l 4 i? 49 Yt x 3 14 Was q.. q i ! , , 4. i E v-^ r 1 t ? i t, -r f. 4 O t T.. . l ? t t s Q F, t": } lit: } > 1 7-1 ----Y'''"' F'iiiFF? t 'i .?..h f' ? ..?',..?.M.,j.. ..?.•-i-t.. '.l 1 , O ? ? y «-w 04 _ ..A. _ } yy 41. "M {Zrt?l it i _ y Y .... t ? f' T °. t tt 1 . ? -• ? i x -j- -? -..? Q t' q?? ai3 ?' d r