Loading...
HomeMy WebLinkAboutSW6201202_Calcs (Pipes)_202012101691— Faithwill Farms Subdivision *Cross pipe calculations use 25-year storm intensity Tc = 42 min; use 45 min Kerby: L = 713', s = 0.004, n = 0.4 DA = 3.59 ac C = 0.45 1 = 3.72 in/hr Q = 6.01 cfs Pipe 2 Tc = 47.7 min + 16.7 min; use 1 hour Kerby: L = 1,034', s = 0.005, n = 0.4 Kirpich: L = 1,054', s = 0.0025 DA = 24.32 ac C=0.25 1 = 2.51 in/hr Q = 15.26 cfs