HomeMy WebLinkAboutNCC193303_NOT Closeout Documents_20201210North Carolina Department of Environmental Quality
Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094
(910) 433-3300
Turnberry, Section Two, Part Two - Lot
County: Hoke Project: 192
Person financially responsible: Caviness and Cates Building and Development, Project la
Inc. - Patrick Raynor, CFO
Address: 639 Executive Place, Suite 400, Fayetteville, NC
1. Project Location: Grantham Drive, McLauchlan Twsp
Pictures: No
2. Weather and soil conditions: sunny/workable soils
3. Is site currently under notice of violation? No
4. is the site in compliance with S.P.C.A. and rules? Yes
S. Violations:
6. Is the site in compliance with the NPDES Permit? Yes
Describe:
River basin: Cape Fear
HOKE-2020-024
Initial inspection: No
If no, check violations below:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
S. Contact made with (same):
Inspection report: Sent Report
9. Corrective action needed:
Title:
Date given/sent: June 23, 2020
10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional
self -monitoring or self -inspections are required. Project is in compliance with the SPCA and
released. Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities should be requested by the permittee via a Notice of Termination.
Please note that this correspondence must be uploaded as part of completing the Notice of
Termination process.
Reported by: Penny Markle Others present:
Date of inspection: June 22, 2020 Time arriving on site: 9:00 AM Time leaving site: 9:45 AM
cc: