Loading...
HomeMy WebLinkAboutNCC190347_NOT Closeout Documents_20201209mlzm� OW M0.6 11 I'M North Carolina Department of Environmental Quality Land Resources: 610 East Center Avenue, Suite 301, Mooresville, NC 28115(704)663-1699 Rehab RW 18L-36R, Demo Taxi C7, Upgrade County: Mecklenburg Project: Airfield Guidance Signs River basin: Catawba Person financially responsible: Charlotte Douglas International Airport - Jeff Project #: MECKL-2019-067 McSwain, Engineering Director Address: 5601 Wilkinson Boulevard, Charlotte, NC 28208 1. Project Location: Airport Blvd, Charlotte Pictures: No 2. Weather and soil conditions: Sunny, Workable Soils Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Shane Nixon Title: Clt Airport Inspection report: Sent Report Date given/sent: November 20, 2020 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is released. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities should be requested by the permittee via Notice of Termination unless permit approval date was prior to April 2019. Reported by: Jeffrey Chandler Others present: Date of inspection: November 19, 2020 Time arriving on site: 2:00 PM Time leaving site: 2:10PM cc: