Loading...
HomeMy WebLinkAboutNCC192612_NOT Closeout Documents_20201207x � onrCityoeOf Engineering 300 W Crowell Street, Monroe, NC 28112 monroenc.org • 704-282-4500 • PO Box 69, Monroe, NC 281 1 1 8-26-2020 SDH Charlotte, LLC Attn: Emily Powell 4293 NC Hwy 24/27 E Ste. B Midland, NC 28107 CERTIFIED MAIL RETURN RECEIPT REQUESTED RE: Project Name: Dogwood Forest (Lots 1-5) Project ID: 20-00200402 County: Union Dear Emily Powell, This letter is to serve as notice that the City of Monroe is releasing your erosion and sedimentation control bond. The above referenced site is permanently stabilized and we consider this project complete from an erosion control standpoint. Enclosed you will find the original bond documents as we received them. If you have any questions please contact Sam Starnes at 704-282-4583 or sstarnes@monroenc.org. Sincerely, Sam Starnes Erosion Control Inspector I:\Erosion Control\ESC Inspections\Subdivision Inspections\Dogwood Forest\Smith Douglas Lots 1-5\ Bond Return Letter 8-26-20 CITY OF MONROE STANDARD SPECIFICATIONS AND DETAIL MANUAL CITY OF MONROE 4 Certification Form 1-06 • Final Erosion Control Acceptance Form Project Name C, 2S� 1i L I Date '6/ILJ ILO h o c- act D T I Developer j� JA C ,14p2, Cn7 LLCContractor fMIA •-- L-i—C I . The City of Monroe Erosion Control Number for this project is 20-00200402 2. This project and all associated construction activities are completed. 3. Certification Form 1-03 or 1-04 has been approved by the Engineering Director and Certification Form 1-05 (if needed) has been approved by the Engineering Director. (Responsible Agent) (Development Company) hereb certify that the information contained herein is true and correct to the best of my knowledge and belief and was pr tde Oy me th. 4ro )rz'141 g/17/z(Deve er ent Signature) (Date) gent Signature) (Date) 8/14/2020 (Project Engineer Signature) (Date) ACCEPTANCE BY CITY OF MONROE: " I (Erosion Control Specialist Signature) (Date) `\I, k % % I I I( I I,," �� C A R o4 19 r 2Q�SEAL 048769 Af+ r �y LO (Project Engineer SEAL) s� , ' 4 12-7,P'VP (Engineering Director) (Date) 07-36 Permits, Checklists, and Fortes Division 07