HomeMy WebLinkAboutNCC205607_NOI Application_20201208Action History (UTC-05:00) Eastern Time (US & Canada)
Subrrit by Anonymous User 12/3/2020 1:36:44 PM (NCG01 NOI Submission)
Approve by Gamble, Aana C 12/7/2020 10:49:53 AM (Review- Construction NOI 38043)
• The task was assigned to Gamble, Aana C by round robin distribution 12/3/2020 1:37 PM
The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: December 7, 2020 5:00
PM 12/3/2020 1:37 PM
Submit by McCoy, Suzanne 12/8/2020 2:42:31 PM (Payment Verification for NCC205607)
* Ode// 73 investments
• McCoy, Suzanne assigned the task to McCoy, Suzanne 12/8/2020 2:41 PM
The task was assigned to DEMLR NCG01 Payment Team. The due date is: January 18, 2021 5:00 PM
12/7/2020 10:50 AM
.• SThF� ';
1
NORTH CAROLINA
EnrlronmertW quallly
A. Project Information
Part A.
Project Location and Waterbody Information
Are you submitting IT No
an NOI that was r Yes
rejected before?
1a. Project Name * Odell Corners Phase I, Phase II & Roadway Improvements
1 b. Specific Lot This field rray be used to list specifc lot numbers.
Numbers
2. County* Cabarrus
3. Highway or Street Southeast Corner of Highway 73 and Odell School Road
Address* Street narre only is acceptable if no address nun ber assigned yet
4.CityorTownship* Concord
5. State * NC
6. Zip Code * 28027
7. Latitude* Enter the latitude in decimal degrees
35.4384
8. Longitude* Enter the longitude in decimal degrees (M.JST be negative)
-80.7257
If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of
North Carolina. Look for the coordinates in the bottom left corner.
9. Date to Begin*
12/07/2020
Estimated Construction Project Start Date
10. Date to End*
12/31/2021
Estimated Construction Project End Date
11. SIC (Primary)*
Residential, Other than SFE (1522)
Standard Industrial aassification for Developrrent
12. Acres to be
23.95
disturbed*
(including off -site borrow and waste areas)
13. Total site area 23.95
(acres) *
14. Post- 11.01
construction (Estirrated)
impervious area
(acres) *
NCC Project NCC-CABAR-2020-Odell Corners Phase I, Phase II & Roadway
Tracking ID Improvements
Assigned autorratically
Below you must enter waterbody information for surface waters affected by this project. Please consult
DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please
enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You
may enter up to 3 waterbodies if needed.
15a. Receiving Rocky River
Waterbody* Ibrre of w aterbody into w hich storrrw ater runoff w ill discharge
15b. Waterbody 13-17
Index No.* NCWaterbody Index Number
Stormwater rJ No
discharges will flow r- Yes
to additional
wate rs *
16a. Is this project r Yes
subject to the NC r No, not subject to NC SPCA
Sediment Pollution
Control Act?*
B. Permittee Information
Part B. ^
Fl rnittee Inforrration - Legally Fa sponsible Entity and Individual
Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application
form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same
organization. That person must be a responsible corporate officer who owns or operates the construction activity, such
as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV,
Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part
IV, Section B, Item (6) of that permit.
1. Organization Legally Pesponsible Entity
Name * Odell 73 Investments, LLC
It pernittee is an individual (i.e., organization does not apply), enter first and last narre in this field.
Note: The organization name must match the business entity name registered with the NC Secretary of State. You can
verify the registration here.
2. First Name * Justin
IF Corporation, enter Faegistered Agent First Wre
3. Last Name* Mueller
It Corporation, enter F;bgistered Agent Last %rre
3b. Title Manager
4. Permitee E-mail justin@sdgcarolinas.com
Address*
5. Permittee 7045785688
Telephone No.*
6. Permittee Mailing Street Address
Address* 51 Union Street South
Address Line 2
Suite 100
City State / Frovince / Fbgion
Concord NC
Fbstal / Zip Code Country
28025 United States
Check box if the V Yes
street address the
same as mailing
address
7. Permittee Street
Street Address
Address*
51 Union Street South
Address Line 2
Suite 100
City
State / Ftovince / Faegion
Concord
NC
Fbstal / Zip Code
Country
28025-5009
US
8. Type of
Non -Government
Ownership*
C. Site Contact Information
Part C.
Roject Site Contact Inforrration
....................................................................................................................................................................................................
1. Primary Site
Justin
Contact - First
Name *
2. Primary Site
Mueller
Contact - Last
Name *
3. Title
Manager
4. Site Contact E-
justin@sdgcarolinas.com
mail Address*
5. Site Contact
7045785688
Telephone No.
6. Organization
Odell 73 Investments, LLC
Name
7. Site Contact
Street Address
Mailing Address*
51 Union Street South
Address Line 2
Suite 100
city
Concord
Fbstal / Zip Code
28025
8. Consultant Name
(Optional)
Andrew Grant
First and Last narre
9. Consultant E-mail
AGrant@bgeinc.com
This person will be copied on all correspondence.
10. Consultant
803-322-7510
Telephone No.
State / Rovince / Region
NC
Country
United States
D. E&SC Plan
Part D. ^
Erosion & Sediment Control (E&SC) Ran Approval Information
......................................................................................................................................................................................................................................................................................................................................
1. Date E&SC Plan 07/08/2020
Approved *
2. E&SC Plan Project CABAR-2020-080
Number/ID * Assigned by agency or local program
3. E&SC Plan r State DEQ Office
Approved by* r Local Program
4. State DEQ Office * Mooresville (MRO)
Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a
complete application. For linear projects, please also upload a site map showing the overall extent of the project or
include the beginning point and end point coordinates in the "Notes" box below.
5. E&SC Plan Grading Permit.pdf
Approval letter or Mast beRDFformat
Grading Permit
6. Site Location Map Mist be RDFforrret (lint 20 NB)
Site Location Map.pdf
Rease do not upload entire set of E&SC plans.
1.8MB
206.91 KB
7. Notes (Optional) Frovide any additional information that night help the reviewer better understand how uploaded docurrents support
the application. Include additional waterbodies for linear projects if necessary.
8. NOI Certification NCG01 Notice of Intent (NOI) Certification Form.pdf 708.82KB
Form Wst be RDF formal
This is an Express r No
Review Project* r Yes
E. Certification
North Carolina General Statute 143-215.6E (i) provides that:
Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other
document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement
of a material fact in a rulemaking proceeding or contested case under this Artcle; or who falsifies, tampers with, or knowingly renders
inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the
Commission implementing this Artcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand
dollars ($10,000).
Under penalty of law, I certify that:
17 I am the person responsible for the construction activities of this project, for
satisfying the requirements of this permit, and for any civil or criminal penalties
incurred due to violations of this permit.
rJ The information submitted in this NOI is, to the best of my knowledge and belief,
true, accurate, and complete based on my inquiry of the person or persons who
manage the system, or those persons directly responsible for gathering the
information.
* 17 I will abide by all conditions of the NCG010000 General Permit and the
approved Erosion and Sediment Control Plan.
* rJ I hereby request coverage under the NCG010000 General Permit and
understand that coverage under this permit will constitute the permit
requirements for the discharge(s) and is enforceable in the same manner as an
individual permit.
Specify if you are:* r The Responsible Person named on this Notice of Intent
f Authorized Responsible Person*
Important: The person who electronically signs this Certification above must be the same person who signs the NOI
Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible
person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who
owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager
that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more
information on signatory requirements, see Part IV, Section B, Item (6) of that permit.
Signature
�%�rc1.1�sr ��flfd�l�'•t.
Type Name * Justin Mueller
Title Manager
Organization Legally Responsible Entity
Odell 73 Investments, LLC
Date * 12/03/2020
F. Tracking and COC Info
NOI Tracking No. 38043
NC Reference No.
NCG01-2020-5607
Uses 'count_nurrber' variable (increrrented by SP)
Certificate of
NCC205607
Coverage (COC)
Uses 'count_nurrber' variable (increrrented by SP)
No.*
Count Number 5607
Sequential nurrber for subrrittal that is incremented by Stored Frocedure
COC Year 2020
Year of date reviewed (used to assign YY digits after "NOC' in COCno.)
Initial Invoice No. NCC205607-2020
Invoice Due Date 1/6/2021
Initial Fee $ 100.00
Invoice Status OPEN