Loading...
HomeMy WebLinkAbout20100730 Ver 1_401 Application_20100910201 0 North Carolina Wildlife Resources Commission 9 Gordon Myers, Executive Director September 2, 2010 NC DWQ 401/Wetlands Unit 1650 Mail Service Center Raleigh, NC 27699-1650 Dear Sir or Madam: The North Carolina Wildlife Resources Commission proposes maintenance at its Gaston Boating Access Area in Northampton County. The project will require a US Army Corps Nationwide Permit 3 and DWQ Water Quality Certification. Please find enclosed 5 copies of the PCN form, project location map, and proposed project plan. Also enclosed is proof of payment by electronic transfer. The necessary documentation has already been submitted to US Army Corps of Engineers. If you need any additional information to complete your review please contact me at sara.sherman(cD, ncwildlife. org or 919-707-0164. Thank you for your time and attention to this issue. Sincerely, Sar her , Project Engineer Division of Engineering Services SS Enclosures DIVISION OF ENGINEERING SERVICES Mailing Address: 1720 Mail Service Center - Raleigh, NC 27699-1720 Office Location: 1751 Varsity Drive - Raleigh, NC -Telephone: (919) 707-0150 - Fax: (919) 707-0162 "'C'100730 of ?NA7?? LM Di?SJt-? , _ 11C Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Pre-Construction Notification PCN Form A. Applicant Information QP04 ram 1. Processing 1 a. Type(s) of approval sought from the Corps: ? Section 404 Permit ®Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: 3 or General Permit (GP) number: 1 c. Has the NWP or GP number been verified by the Corps? ® Yes ? No 1d. Type(s) of approval sought from the DWQ (check all that apply): ® 401 Water Quality Certification - Regular ? Non-404 Jurisdictional General Permit ? 401 Water Quality Certification - Express ? Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ? Yes ® No For the record only for Corps Permit: ? Yes ® No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. ? Yes ® No 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1h below. ? Yes ® No 1h, Is the project located within a NC DCM Area of Environmental Concern (AEC)? ? Yes ® No 2. Project Information 2a. Name of project: Gaston Boating Access Area 2b. County: Northampton 8 2c. Nearest municipality / town: Gaston, NC &J ti L= Pi 2d. Subdivision name: N/A 201 2e. NCDOT only, T.I.P. or state project no: NIA DENR • WATER QUALITY VMTIA c 3. Owner Information 3a. Name(s) on Recorded Deed: NC Wildlife Resources Commission 3b. Deed Book and Page No. Book 506, Page 60 3c. Responsible Party (for LLC if applicable): Sara Sherman, Project Engineer 3d. Street address: 1720 Mail Service Center 3e. City, state, zip: Raleigh, NC 27699 3f. Telephone no.: 919-707-0150 3g. Fax no.: 919-707-0162 3h. Email address: sara.sherman@ncwildlife.org Page 1 of 11 PCN Form - Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a. Applicant is: ? Agent ? Other, specify: 4b. Name: 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: 5b. Business name (if applicable): 5c. Street address: 5d. City, state, zip: 5e. Telephone no.: 5f. Fax no.: 5g. Email address: Page 2 of 11 PCN Form -Version 1.3 December 10, 2008 Version B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 3999-87-7985 Latitude: 36.48259 Longitude: - 77.64436 1 b. Site coordinates (in decimal degrees): (DD.DDDDDD) (-DD.DDDDDD) 1c. Property size. 5.94 acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to Roanoke River proposed project: 2b. Water Quality Classification of nearest receiving water: C 2c. River basin: Roanoke 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: The site is an existing boating access area with 1 boat ramp and gravel parking. Surrounding areas are undeveloped woods. 3b. List the total estimated acreage of all existing wetlands on the property: NIA - entire project area is below NWL 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 2300 3d. Explain the purpose of the proposed project: The ramp is difficult to use because of sediment accumulation around the end of the ramp from powerloading. This project proposes to remove the accumulating pebbley/sandy sediment to provide adequate water depths for launching, recovering, and maneuvering of boats. 3e. Describe the overall project in detail, including the type of equipment to be used: When this ramp was constructed in the 1960s, dredging was part of the original construction. This project proposes minor excavation (21 cubic yards) of the accumulated pebbley/sandy sediment just beyond the end of the ramp. The excavation will be performed by an excavator on the shore. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / ? Yes ? No ® Unknown project (including all prior phases) in the past? Comments: 4b. If the Corps made the jurisdictional determination, what type ? Preliminary ? Final of determination was made? 4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: Name (if known): Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for ® Yes ? No ? Unknown this project (including all prior phases) in the past? 5b. If yes, explain in detail according to "help file" instructions. NWP 13 issued 10/29/1993, action ID 199304500. NWP 3 issued 11/6/2008 for repair of broken end of ramp, no action ID--per email 45-day review expired. Page 3 of 11 PCN Form - Version 1.3 December 10, 2008 Version 6. Future Project Plans 6a. Is this a phased project? ® Yes ? No 6b. If yes, explain. The proposed work is a short-term fix because the ramp is currently very difficult to use in normal and low water conditions. This ramp has not been renovated since its original construction in the 1960s. In the future a full renovation is planned consisting of a new ramp directly over the existing and a floating dock with the abutment being above MHW. Less than 1 acre will be disturbed in the future full renovation. Page 4 of 11 PCN Form - Version 1.3 December 10, 2008 Version C. Proposed Impacts Inventory 1. Impacts Summary I a. Which sections were completed below for your project (check all that apply): ? Wetlands ? Streams - tributaries ? Buffers ® Open Waters ? Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact number - Type of impact Type of wetland Forested Type of jurisdiction (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ - non-404, other) (acres) Tem ora T ? Yes ? Corps W1 ? P ? T ? No ? DWQ ? Yes ? Corps W2 ? P ? T ? No ? DWQ ? Yes ? Corps W3 ? P ? T ? No ? DWQ ? Yes ? Corps W4 ? P ? T ? No ? DWQ ? Yes ? Corps W5 ? P ? T ? No ? DWQ ? Yes ? Corps W6 ? P ? T ? No ? DWQ 2g. Total wetland impacts 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g• Stream impact Type of impact Stream name Perennial Type of jurisdiction Average t Impact length number - Permanent (P) or (PER) or intermittent (Corps - 404, 10 DWQ - non-404, ream s width (linear Temporary (T) (INT)? other) (feet) feet) S1 ? P ? T ? PER ? INT ? Corps ? DWQ ? PER ? Corps S2 ? P ? T ? INT ? DWQ ? PER ? Corps S3 ? P ? T ? INT ? DWQ S4 ? P ? T ? PER ? INT ? Corps ? DWQ ? PER ? Corps S5 ? P ? T ? INT ? DWQ ? PER ? Corps S6 ? P ? T ? INT ? DWQ 3h. Total stream and tributary impacts 3i. Comments: Page 5 of 11 PCN Form - Version 1.3 December 10, 2008 Version 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. Open water impact number - Permanent (P) or Temporary 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) 01 ? P ®T Roanoke River Disturbance during minor dredging River <0.01 02 ®P ? T Roanoke River Increase in water depth in affected area River <0.01 03 ?P?T 04 ?P?T 4L Total open water impacts <0.01 4g. Comments: 21 cubic yards of material will be excavated from below NWL. 5. Pond or Lake Construction If and or lake construction proposed, then complete the chart below. 5a. Pond ID 5b. Proposed use or purpose 5c. Wetland Impacts (acres) 5d. Stream Impacts (feet) 5e. Upland (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f. Total 5g. Comments: 5h. Is a dam high hazard permit required? ? Yes ? No If yes, permit ID no:- 51. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: Page 6 of 11 PCN Form - Version 1,3 December 10, 2008 Version 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If an impacts require mitigation, then you MUST fill out Section D of this form. 6a. ? Neuse ?Tar-Pamlico ? Other: Project is in which protected basin? ? Catawba ? Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number - Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary T impact required? B1 ?P?T ?Yes ? No ?Yes B2 ?P?T ? No B3 ?P?T ?Yes ? No 6h. Total buffer impacts 6i. Comments: D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. No new construction is proposed. Only 1 small area of dredging with no vegetation is proposed for maintenance purposes. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. The excavator will perform the dredging from the shoreline which will minimize temporary in-water impacts. Work will adhere to Feb 15 - Sept 30 moretorium due to anadramous fish habitat. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for ? Yes ® No impacts to Waters of the U.S. or Waters of the State? 2b. If yes, mitigation is required by (check all that apply): ? DWQ ? Corps ? Mitigation bank 2c. If yes, which mitigation option will be used for this F1 Payment to in-lieu fee program project? ? Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity Page 7 of 11 PCN Form - Version 1.3 December 10, 2008 Version 3c. Comments: 4. Complete If Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. ? Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: ? warm ? cool ?cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 6. Complete If Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ? Yes ? No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments: Page 8 of 11 PCN Form - Version 1.3 December 10, 2008 Version E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified 0 Yes ® No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. I ? Yes ? No Comments: 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? unknown % 2b. Does this project require a Stormwater Management Plan? ? Yes ® No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: Entire work area is below NWL, no I changes to existing impervious surfaces are proposed. 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: 2e. Who will be responsible for the review of the Stormwater Management Plan? ? Certified Local Government ? DWQ Stormwater Program ? DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? NIA - State Project 3b. Which of the following locally-implemented stormwater management programs apply (check all that apply): 3c. Has the approved Stormwater Management Plan with proof of approval been attached? ? Phase II ? NSW ? USMP ? Water Supply Watershed ? Other: ? Yes ? No t. vrra.t vwn??r. caa?. . ? Coastal counties ? HQW 4a. Which of the following state-implemented stormwater management programs apply 0 ORW (check all that apply): ? Session Law 2006-246 ? Other: 4b. Has the approved Stormwater Management Plan with proof of approval been ? Yes ? No attached? 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ? Yes ? No 5b. Have all of the 401 Unit submittal requirements been met? ? Yes ? No Page 9 of 11 PCN Form -Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1a. Does the project involve an expenditure of public (federal/state/local) funds or the Yes ? No use of public (federal/state) land? 1b. If you answered "yes" to the above, does the project require preparation of an ? Y ® No environmental document pursuant to the requirements of the National or State es (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ? Yes ? No letter.) Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated d St d d W l ? Yes ® No an ar s, et an Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or or Riparian Buffer Rules (15A NCAC 2B.0200)? 2b. Is this an after-the-fact permit application? ? Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in Yes ® No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. No wastewater will be generated. No on-site water or sewer facilties exist or will be proposed. Page 10 of 11 PCN Form - Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ? Yes ® No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ? Yes ® No impacts? E] Raleigh 5c. If yes, indicate the USFWS Field Office you have contacted. ? Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? Area is already developed and is a manmade impact. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ® Yes ? No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? NCWRC Division of Inland Fisheries classifies the area as Primary Nursery 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ? Yes ® No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? none 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? ? Yes ® No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? Entire project area is below NWL therefore cannot be in floodplain. NC Wildlife Resource s? 8/31/2010 COnirnission, Sara Sherman - Appliqan Agent's Signature Date Applicant/Agent's Printed Name (Agent's signature is valid f anauthorization letter from the applicant is provided.) Page 11 of 11 PCN Form - Version 1.3 December 10, 2008 Version I W LLJ r LL LL W C N L U m � O W nI Z m� z LU LU Z W Z > O C� 0 In W > D Lu a w Q Q U N (6 N L Y O U O (� � C 70 N m � O Q O N CL V 06 C O c O U U Z 0) c � O W O w U LL X LL U) O Q U) 0N V� N O C O O O � r � Ql p �Q U W w D OCl) co LU LU(.) � U_ W 0� LL w J co -j Z >_ W Q W m Z Z m V � Q O Z wz W zo w� Q LL LIJ U O UU U = = z w0 _O �z ry J_ cn Q � O ow Z D �� M o E � O n J � O O Z O M co II II co N" N O N m 0 C Ca (n O O > m � W c 0 >J z O M N 0 m ai c i c o m -C n U E m E Wo CO ov C - N \5 / i -T.2o O _ dEmN -.- _ _6 U W U ` ..i a) / E v 1 I / / x W \ / m I I U �y ,n. W LLJ r LL LL W C N L U m � O W nI Z m� z LU LU Z W Z > O C� 0 In W > D Lu a w Q Q U N (6 N L Y O U O (� � C 70 N m � O Q O N CL V 06 C O c O U U Z 0) c � O W O w U LL X LL U) O Q U) 0N V� N O C O O O � r � Ql p �Q U W w D OCl) co LU LU(.) � U_ W 0� LL w J co -j Z >_ W Q W m Z Z m V � Q O Z wz W zo w� Q LL LIJ U O UU U = = z w0 _O �z ry J_ cn Q � O ow Z D �� Gaston BAA Location Map Roanoke River, Northampton County, NC I ?0100?3Q Sep 2, 2010 12:14:27 PM ,OCP AP DOCUMENT GENERAL INFORMATION NEXT FUNCTION: ACTION: --------------------------------- PAY ENTITY 17PT VEND/EMP SHORT NAME: b DOCUMENT DATE : 08/30/2010 CONTROL NUMBER : 0271 DOCUMENT TYPE : INVOICE DOCUMENT STATUS : PD-FULL CURRENCY CODE GROSS DOC AMOUNT AMOUNT PAID COUNTY CDE/TRIP NBR: PO REFERENCE SIGN APPROVAL CODE DATES APPROVED DGI HISTORY: 09/02/2010 12:14:14 VENDOR/EMP NUMBER: 566000372 40 DOCUMENT NUMBER GASTON083010 CONTROL DATE : 08/31/2010 APPLICATION AREA : JS DATE ENTERED : 08/31/2010 DATE LAST UPDATED: 08/31/2010 570.00 PROV ACCTG DATE . 570.00 REMIT MESSAGE: I ,Sep 2, 2010 OCP AP NEXT FUNCTION: BROWSE: 12:14:35 PM DOCUMENT PAYMENT GENERAL INFORMATION ACTION: HISTORY: DPG 09/02/2010 12:14:29 ------------------------------------------------------------------------------- PAY ENTITY 17PT VEND/EMP NBR: 566000372 40 VEND/EMP SHORT NAME: DENR DOCUMENT NBR: GASTON083010 DOCUMENT DATE : 08/30/2010 PAYMENT NBR: 001 PRTL PYMT NBR: 000 IND AMOUNT SALES TAX/VAT VAT INCLUSIVE N SALES TAX 2 EXPENSE IND SALES TAX 3 GL EFFECTIVE DATE: 09/01/2010 FREIGHT EXTRACT DATE ADDITIONAL COST ACCRUAL CANC DATE: GROSS INVOICE 570.00 CURRENCY CODE PAYMENT AMOUNT 570.00 DISCOUNT TYPE NOT TAKEN AMOUNT PAID 570.00 DISCOUNT TAKEN PAYMENT STATUS PAID PAYMENT TERMS : NET PAY IMMEDIATELY PAYMENT REF NBR 0000045414 PAYMENT DATE : 09/01/2010 PAYMENT TYPE ELECTRONIC PAYMENT ROUTE CD : - HANDLING CODE FACTOR NUMBER ONE INVC PER PYMT: REASON CODE/DESC BANK ACCT PYMT CD: IGO .00