HomeMy WebLinkAbout20100632 Ver 1_Approval Letter_20100824??
NCDENR
Beverly Eaves Perdue
Governor
Mr. Chris Teeter
City of Salisbury
One Water Street
Salisbury, NC 28144
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Coleen H. Sullins
Director
Subject: MLK Ball Field Sewer Line
APPROVAL of 401 Water Quality Certification with Additional Conditions
Dear Mr. Teeter:
Dee Freeman
Secretary
August 24, 2010
DWQ# 10-0632
Rowan County
You have our approval, in accordance with the general certification and those conditions listed below,
to impact 30 linear feet (If) of Town Creek in order to construct the sewer line in Rowan County, as described in
your application received by the Division of Water Quality (DWQ) on August 3, 2010. After reviewing your
application, we have determined that this project is covered by Water Quality General Certification Number
3819, which can be viewed on our web site at http://portal.ncdenr.org/web/wq/swp/ws/401. The General
Certification allows you to use Nationwide Permit Number 12 once it is issued to you by the U.S. Army Corps
of Engineers. Please note that you should get any other federal, state or local permits before proceeding with
your project, including those required by (but not limited to) Sediment and Erosion Control, Non-Discharge, and
Water Supply Watershed regulations.
The above noted Certification will expire when the associated 404 permit expires unless otherwise
specified in the General Certification. This approval is only valid for the purpose and design that you described
in your application. If you change your project, you must notify us in writing, and you may be required to send
us a new application for a new certification. If the property is sold, the new owner must be given a copy of the
Certification and approval letter; and is thereby responsible for complying with all conditions.
In addition to the requirements of the certification, you must also comply with the following conditions:
The Mooresville Regional Office shall be notified in writing once construction at the approved impact areas
has commenced.
2. Existing stream dimensions (including the cross section dimensions, pattern, and longitudinal profile) must be
maintained.
3. Utilization of rip rap shall be minimized to cut width to the maximum extent practicable. Use of native
vegetation and other soft stream bank stabilization techniques must be used where practicable instead of
riprap or other bank hardening methods. If riprap is necessary, it shall not be placed in the streambed,
unless approved by the DWQ.
Mooresville Regional Office One
Location: 610 East Center Avenue, Suite 301, Mooresville, NC 28115 NorthCarolina
Phone: (704) 663-1699\Fax: (704) 663-6040\ Customer Service: 1-877-623-6748 J??????1,?l//?
Internet: http://portal.ncdenr.org/web/wq ?/
An Fnual Onnnrtnnity/Affirmative Antinn Fmnlnver - 50% Recvcled/10% Post Consumer Paoer
4. Storm water discharge structures at this site shall be constructed in a manner such that the potential
receiving streams (of the discharge) will not be impacted due to sediment accumulations, scouring or erosion
of the stream banks.
5. No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the
footprint of the impacts depicted in the Preconstruction Notification application. All construction activities
associated with this project shall meet, and/or exceed, those requirements specified in the most recent
version of the North Carolina Sediment and Erosion Control Manual and shall be conducted so that no
violations of state water quality standards, statutes, or rules occur.
6. Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent
practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable,
they shall be removed and the natural grade restored within two months of the date the Division of Land
Resources has released the project.
7. Upon completion of the project, the applicant shall complete and return the enclosed "Certificate of
Completion" form to the 401/Wetlands Unit of the NC Division of Water Quality.
8. Continuing Compliance. The applicant (City of Salisbury) shall conduct all activities in a manner so as not to
contravene any state water quality standard (including any requirements for compliance with section 303(d)
of the Clean Water Act) and any other appropriate requirements of state and federal law. If DWQ determines
that such standards or laws are not being met (including the failure to sustain a designated or achieved use)
or that state or federal law is being violated, or that further conditions are necessary to assure compliance,
DWQ may reevaluate and modify this certification to include conditions appropriate to assure compliance with
such standards and requirements in accordance with 15 A NCAC 2H.0507(d). Before codifying the
certification, DWQ shall notify the applicant and the US Army Corps of Engineers, provide public notice in
accordance with 15A NCAC 2H.0503, and provide opportunity for public hearing in accordance with 15A
NCAC 2H.0504. Any new or revised conditions shall be provided to the applicant in writing, shall be provided
to the United States Army Corps of Engineers for reference in any permit issued pursuant to Section 404 of
the Clean Water Act, and shall also become conditions of the 404 Permit for the project.
If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing.
You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written
petition that conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative
Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final
and binding unless you ask for a hearing.
This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act.
If you have any questions, please telephone Mr. Alan Johnson in the Mooresville Regional Office at 704-663-
1699 or Ms. Cyndi Karoly in the Central Office in Raleigh 919-733-9721.
Sincerely,
l C?j
for Coleen H. Sullins
Attachments
cc: Army Corps of Engineers, Asheville
Ian McMillan, Wetlands Unit
MRO, Land Quality