HomeMy WebLinkAboutNCC191232_NOT Closeout Documents_20201207North Carolina Department of Environmental Quality
Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094
(910) 433-3300
County: Hoke Project: Arabia Bay River basin: Cape Fear
Person financially responsible: Restoration Systems, LLC - George Howard, CEO Project #: HOKE-2019-028
NCC 191232
Address: 1101 Haynes St., Suite 211, Raleigh, NC 27604
1. Project Location: Arabia Road / SR 1003, Stonewall
Pictures: No
2. Weather and soil conditions: sunny/workable soils
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes
5. Violations:
Initial inspection: No
If no, check violations below:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name): Worth Creech Title: Site Construction Manager
Inspection report: Sent Report Date given/sent: December 04, 2020
9. Corrective action needed:
10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional
self -monitoring or self -inspections are required. Project is in compliance with the SPCA and
released. Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities should be requested by the permittee via a Notice of Termination_
Please note that this correspondence must be uploaded as part of completing the Notice of
Termination process.
Reported by: Penny Markle Others present:
Date of inspection: December 03, 2020 Time arriving on site: 10:50 AM Time leaving site: 11:20 AM
cc: