Loading...
HomeMy WebLinkAbout010012_Inspection_20201103Type of Visit: Compliance Inspection U Operation Review O Structure Evaluation O Technical Assistance Reason for Visit: Routine O Complaint O Follow-up O Referral O Emergency O Other O Denied Access Date of Visit: Arrival Time: Departure Time: County: 4amnw Region: Farm Name: `A 1 1� Q l Ckt I�J 1 �(' Owner Email: Owner Name: d Phone: Mailing Address: 26I E GI �-n S� U — �I (I Ic�l • SYvyj_q Physical Address: Facility Contact: ( Title: PhonM: J- Onsite Representative: I Integrator: Certified Operator: v Certification Number: Back-up Operator: Certification Number: Location of Farm: Latitude: ��% I� q 1 Longitude: b I nt r-r�'1� WA-7 5 =7 All 12A!� �✓n � ��'�v..� (a'rh'► Discharees and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes tkNo ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes No ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes No ❑ NA ❑ NE of the State other than from a discharge? Page I of 3 21412015 Continued Facility Number: jDate of Inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes K No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: I,,) s 9 Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) yy 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes Z No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes] No ❑ NA ❑ NE maintenance or improvement? 7� Waste Annlication 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes 4 No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes � No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): WV1 Wi V-4-" C��O_S 14. Do the receiving crops differ from those designated in the CAWMP? 15. Does the receiving crop and/or land application site need improvement? 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acres determination? 17. Does the facility lack adequate acreage for land application? 18. Is there a lack of properly operating waste application equipment? Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check the appropriate box. ❑ Yes No ❑ NA ❑ NE ❑ Yes 9No ❑ NA ❑ NE ❑ Yes ❑ No 0 NA ❑ NE ❑ Yes R No ❑ Yes NO ❑ Yes No ❑ Yes No ❑ NA ❑ NE ❑NA ❑NE ❑ NA ❑ NE ❑ NA ❑ NE ❑WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes [2 No ❑ NA ❑ NE Waste Application ® Weekly Freeboard Waste Analysis ® Soil Analysis Weather Code Rainfall V Stocking /®` Crop Yield M Monthly and 1 " Rainfall Inspections Dc�;� 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes $k No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No rA NA ❑ NE Page 2 of 3 21412015 Continued Facili Number: - I ry j I Date of Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes 'A No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes TTTT] No ] NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes ( No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes No ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes No ❑ NA ❑ NE Leaca �us�►� S%+vs?'(� l�aCfto�on- �r��illed w� Al�l�A1��� �U� btf,y CG l bra - a n v c� I^ s f ck- l �va-o� 0 1.%J Iv. E$ so; i s cWc QCk- r C`2.6) o I oxofd�5 �b6v_n Yea_p_ 0.0 a�'kk(�wox yLi-f- fly 5 1--\ .sue CZNC�n . ,eryvce d G,�1S 1t �� Pf 0Vf__ � I �a� on Corr.J— ry►105 l ���) ,pyy�' "Gall C% �0�to �r 5.0b V';0_ etcore�i Rq Fb 6-uS?-M ,.ray a 6vo a Z Reviewer/Inspector Name: L C A (�A a V\A Phone: T1 o5 Reviewer/Inspector Signa Date: Page 3 of 3 2/ /201