Loading...
HomeMy WebLinkAbout010028_Inspection_20201027Type of Visit: W Compliance Inspection V Operation Review V ,tructure Evaluation U l echmcal Assistance I Reason for Visit::' (Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Arrival Time:'^ ` Departure Time: County:, I r 1Aft Region:, A� Farm Name: A Car( � n W i l i G�rd� Owner Email: \ Owner Name: A _ D1 . a 1-A Phone: Mailing Address: � 15 /� yid l ?w I V l� I Physical Address: Facility Contact: Car L�y 1 l l 0!r Title: Onsite Representative: Certified Operator: Back-up Operator: Location of Farm: Phone:�b� ` 3L1 �� Integrator: Certification Number: Certification Number: 1 I l� 1 Ga �y I � /� Latitude: 35 O `T Longitude: I [-i Ix d � /YLA ( 128(. 7 �rn ran � _ Discharees and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes x No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ No ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes ❑ No ❑ NA 0 NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes No ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes No ❑ NA ❑ NE of the State other than from a discharge? Page 1 of 3 21412015 Continued Facifi Number: Of jDate of Inspection: I 0 Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes 09 No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE 1,/ Structure 1 Structure 2 Structure 3 V Identifier: v S 1" a — Spillway?: wo— Designed Freeboard (in): _ Observed Freeboard (in):- 5. Are there any immediate threats to the integrity of any of the structures observed? (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? Structure 4 Structure 5 Structure 6 ❑ Yes XNo ❑ NA ❑ NE ❑ Yes 1% No ❑ NA ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? �Q Yes ❑ No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes CKNo ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes CKNo ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes [� No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes N] No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes X No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes ❑ No [" NA ❑ NE acres determination? 7N 17. Does the facility lack adequate acreage for land application? ❑ Yes JW No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes EA No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box. ❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑ Other: 21. Does record keeping need improvement? If yes, checkjtLe appropriate box below. Yes ❑ No ❑ NA ❑ NE 4Waste Application Weekly Freeboard ❑ Waste Analysis �cSLs Weather Code Rainfall ocki g Monthly d V Rainfall ` Inspectio 22. Did the facility fail to inst and maintain a rain gauge? t Yes No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? [:]Yes [:]No NA ❑ NE Page 2 of 3 21412015 Continued S70Z/P/Z C�t I 1 :a1E(l In In V) 'A �l )+, . � afm f fo f a-Qnd .tolaadsul�.tan�atnag :owuN .tolaadsul/.tannatnag 4 V) W u I. kvQ �xo ► � kb,�U kl ��\ a RoNIAJ i (,4,pw 1�� \ oce AQ-00 @ Svc wo-D -Y) M N4 am v ,y-��q 1'uj r 101 1I'e` ,. , .. ,. 3- a am ❑ dN ❑ ON sau ❑ ZXow& ouzus au; Xq I►sin dn-mollo3 v aiinboi f4iliov3 agI sooQ •V£ FiN ❑ `dN ❑ ON sad ❑ Zanilsluasatdat alis-uo ue g;Tm uoilaadsut�nnatnat ssnastp of Ire3 io;aadsul/.iannatna-1 agl P?Q '££ 9N ❑ dN ❑ ON s3A ❑ ZdWAWD .to jiLund agl jo aaueildwoo-uou asnuo gaignn palou sutalgo.td Ieuoilippr Xuu alaM 'Z£ HN ❑ `JN [:1 ON N6 sa'k ❑ gN ❑ dN ❑ oN N ] s3A ❑ aN ❑ dN ❑ ON ffi saA ❑ :joiglo ❑ puod 32vzolSNoo2e-1 ❑ Plaid uoiluoilddd ❑ molaq xoq alEt.tdozddu agI 31aaga `soKjj 4,�Iilton3 agl;n Isixa suteip alit aaejmsgns oa -I £ (uot;8atlddu-.tan0`sutalgoad p.xsogaa4 `o5xugosip `•a•i) Z;tuuad agI Aq paitnboi st, suot;rmis Aau02.tauta jo aagjo Ieuot0a-d agl f3ilou of I!UJ f4tltaL'3 oy pia 'o£ •,Clalt?ipauuui antleluasa.tdai fqiltma .nd leuoidai u lauluoo `soX 3I Ltuaauoo Ajtlenb liu so .zopo uu asod ,14ilioE3 agI pip uoiloadsui agl Jo auul aql id '6Z Zleuuou uegl iagSig mono ivy solt'.t 4ilnytow ytodoi puu am ❑ FAN ❑ ON saA ❑ Iuaumaop io/pue smog bZ g;inn sIUWIUU peap Jo asodsip Aliodoid of ItE3 fliliaE3 ag; piQ -8Z saussl laq;o am ❑ dN ❑ ON 1� s3A ❑ Luoiluoljplaa (Zd Id) sluautssosse ssol stuogdsogd a amoas of IIt3 f4tltn3 3q3 piQ •LZ aN ❑ dN El ON saA ❑ La2mgo ui io;ezado pagiljaa �Clanilou uu jo uoileluautnaop apino.td IiE3 �Sltiiotj aqj PiQ 'qZ :aauuildutoo-uou Sutleaipui Xanms Isjlj jo alep pule (s)amlatuls Isq u002el Cut? ui Slanal o2pnls Iut,ilduioa-uoN ❑ slanal 32pnls zo3 dod 8 dolanap of ambled ❑ AoAms 32pnls Iunuue alaldutoo of amitud ❑ •nmolaq (sa)xoq a;t?udoiddu agl oN ❑ s3A ❑ 3laaga `soK jj LaSpnls of polulat suoilipuw lluuad g;inn aaueildutoa jo Ino �Cliliot3 all sI 'SZ am El dN am ❑ FAN ❑ ON 04 saA ❑ Zltuuad agI Xq pannbai st, luautdinba uoileailddu alsem alszgilua of Iin3 /4t1toe3 oqi P!Q tZ :aouaa sui;o a;eQ - :aagiunN tl[ae4