HomeMy WebLinkAbout20100642 Ver 1_Emails_20100421--2- 0I D 0U`i2-
Hill, Tammy
From: Marc Seelinger [marc@swampschool.org]
Sent: Wednesday, April 21, 2010 7:57 AM
To: McMillan, Ian; 'Williams, Andrew E SAW'; fox.rebecca@epa.gov; Hill, Tammy; Bryant, Shari
L.; howard_hall@fws.gov; 'Tugwell, Todd SAW'
Subject: RE: LaForesta Steam Site
Attachments: image001.jpg; Laforesta Dr, Greensboro, G...pdf
Attached is a map to the La Foresta site. If you are running late or get lost, please give me a call on my cell 919-302-
6900.
Many thanks,
Marc Seelinger, PWS
Director
The Swamp School
SWAMP
From: McMillan, Ian [mailto:ian.mcmillan@ncdenr;gov] f.,,v I_
Sent: Tuesday, April 20, 2010 4:35 PM s
To: Williams, Andrew E SAW; fox. rebecca@epa.go!V'Hill, Tammy; Bryant, Shari L.; howard_hall@fws.gov; Tugwell, Todd
SAW
Cc: Marc Seelinger
Subject: RE: LaForesta Steam Site
Do we have a map to get to the site? Thanks, Ian McMillan
lan.f. McMillan, PWS, LISP
NCDF.NR/I)ivision of Water Quality
Acting Supervisor - 401/Wetlands Permitting and Oversight Unit
2321 Crabtree Blvd. Suite 250
Raleigh, NC 27604
Office: (919) 715-4631
Fax: (919) 733-6893
Email: ian.mcmillan(a,ncdenr.gov
E-mail correspondence to and from this address.ma.ybesubject to the
North Carolina Public Records Law and may be disclosed,to third parties.
From: Williams, Andrew E SAW [Mai Ito: AndreW f=.V1ilWms2@usace.army.mill
Sent: Tuesday, April 06, 2010 8:52 AM
To: fox.rebecca@epa.gov; McMillan, Ian; Hill, Tam6y Bryant, Shari L.; howard_hall@fws.gov; Tugwell, Todd SAW
Cc: Marc Seelinger
Subject: FW: LaForesta Steam Site
All,
Attached is the sketch for the proposed Dunlap Mitigation Bank. We currently are scheduled to visit the site at 9:30 am on 22 April
2010. The email (below) states that the sinuosity on the sketch is 1.5 but they plan to lower it to 1.3. 1 believe that it may still be more
sinuous than typical streams in the piedmont.
Currently, Shari Bryant (NCWRC), Ian McMillan (NCDENR) and 1 are scheduled'to attend the 22 April Meeting. Todd Tugwell has
stated that he would like to attend, but has a schedule conflict.
Andrew Williams
Regulatory Project Manager
U.S. Army Corps of Engineers
Wilmington District, Raleigh Field Office
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
919-554-4884 ext. 26
t,
We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at:
http://per2.nwp.usace.army.miI/survey.html
Thank you for taking the time to visit this site and complete the survey.
-----Original Message-----
From: Marc Seelinger [maiIto: marc a,swampschool.org]
Sent: Thursday, April 01, 2010 11:01 AM
To: Williams, Andrew E SAW
Cc: APPLIEDBOTANY@YAHOO.COM
Subject: LaForesta Steam Site
Hi Andy,
Attached is the proposed stream sketch for the LaForesta Stream' &bjeEt': TH8,exisfiiig stream that we are working with is 5,337 feet
long. What is drawn represents a 1.5 sinuosity (K) and is 7,105 of h6e '§tre hilcliannel. To be a little more conservative, we estimate
a K=1.3 and a subsequent stream length of 6,130 feet.
The proposed stream type will be a Rosgen C-4 (gravel) and will be 90% Priority 1 restoration. About 10% will be Priority 2 towards
the downstream end of the project to step down to match final grade.
We do envision some rock structures for vertical and lateral stability. We will also include bioengineering materials for in-stream
habitat restoration.
The construction plan will be to establish the new stream channel in the "dry" and then <<image003.jpg>> turn the old stream into the
new stream once all of the stabilization materials are in place. The cut material will be placed in the old stream bed. However, we
have much less material than area to fill, therefore we will create some oxbow ponds and other "wetland" habitat where the old stream
channel remains.
We have had meetings will Duke Power about their utility easement. There may be some portions of the buffer area that will overlap
the overhead power easement. We have discussed the short term and long term management of the buffer area and believe that we can
come to an agreement to provide an adequate buffer for this area. This agreement will be in writing and part of the MBI. I would
appreciate some guidance on how the IRT has dealt with this issue in the past.
2
a _ Dr
? maps Address Laforest
Greensoro i4d5 `
I Get Google Maps on your phone
"
"
to4664S3
Text the word
GMAPS
r F'
dd
i
?Q?
:. Lftt}x r
? ?
tg??? ? D
ry
,?
? APr'?'dian RcP ;?'+
a r? ss
HicOne Rd eY ?r
HicarxeRd f*cOn,e Rr
LmwoodRO a~v e"7 hlcxthfore5?
Q§
w Spy w
i g
M
? 0
yr t;,;kev? ad
Y Lake
$? Lakewood
-kiee t-b;1b
c ?J a 'L.
keMiew
anal Para
Gpc*t?
Greekyi Rd
Mines ehaper Rd
ttb
M,ctw9 ?+
' b
Q-
?
W-010 Google ? Map data X010 Google
Page 1 of 3
MAPQUE'ST
Trip to 4634 La Foresta Dr
McLeansville, NC 27301
62.07 miles -about 1 hour 11 minutes
Notes
Do • • yow- Credit Scot-e?
Excellent 750 - B40
Good 660 - 749
Fair 620 - 659
J'
Poor 340 - 619
I Don't Know ????
Find out INS
'Sco TANTLY!
m-colm
2807 Mebane Ln, Durham, NC 27703-7986
1. Start out going WEST on MEBANE LN toward
WOODSDALE DR.
1"? 2. Turn RIGHT onto WOODSpAI:?,gl,.
+11 3. Turn LEFT onto PROSPEPT"PKWY.
tai;
4. Turn LEFT onto LIVE OAK-CIR:- -
k.)rti:is`.
i
5. Turn LEFT onto COPPER ?EAF WAY.
i
i„r, wcsr 6. Turn RIGHT onto US-70 W I NEW RALEIGH HWY.
Continue to follow US,70 W.
't' T 51 7. US-70 W becomes `US=76 BYP W.
't` 8. US-70 BYP W becomes:a-$5 S. ,
fim
9. Take the MT HOPE CHURCH RD exit, EXIT 132.
10. Turn RIGHT onto MT.HOPE CHAD / MT HOPE
i
http://www.mapquest.com/print
go 0.0 mi
go 0.0 mi
go 0.5 mi
go 0.0 mi
go 0.5 mi
go 3.0 mi
go 2.8 mi
go 45.3 mi
go 0.5 mi
4/21/2010
Page 2 of.3
i.
CHURCH RD.
go 2.7 mi
11. MT HOPE CH RD / MT HOPE, CHURCH RD becomes go 3.4 mi
MCLEANSVILLE RD.
41 12. Turn LEFT onto HUFFINE MILL RD. go 0.8 mi
f+ 13. Turn RIGHT onto DICKS MILL RD. goo. 1 mi
14. Stay STRAIGHT to go onto CREEK4'W RID go 0.5 mi
15. Turn RIGHT onto ANDERSON=VALLEY RD. go 1.1 mi
16. Turn RIGHT onto HINES CHAPEL RD, go 0.4 mi
h 17. Turn LEFT onto LA FORESTA DR. go 0.3 mi
18. LA FORESTA DR. go 0.0 mi
4634 La Foresta Dr, McLeansville, NC 27301
Total Travel Estimate : 62.07 miles - about 1 hour 11 minutes
End Map Hide
B: 4634:1a Fq esta Dr, McLeansville, NC 27301
MAPMUFST. p too m
300 ft
I a F,n'
L,
02010 Map Quest Ponions 02010 N7AVTEQ
Route Map Hide
http://www.mapquest.com/print 4/21/2010
Page 3 of 3
j
tC1pQYIFSi ?Altamahaw ' 0 ? ? i km
4 mi
L86)
Bahama
0
501
?Gibsonville
n .lBurlington Mebane
{7r,'; Hillsborough
A L ,a hit a E.
D 'rfam
1<1
aax5pahaw.
7 ra
i54
' 4911 _ Carrboro ?Chape(flill
CSnow camp. .? - ?- j 147
15 501'?
Liberty
-° Cs?2010 MzpQwgsY Wottion s 02010 NAVTE0 Inter p
All rights reserved. Use subject to License/Copyright Map Legend
Directions and maps are informational only. We make no warranties on the <4Ccuracy of their content, road conditions or route usability or
expeditiousness. You assume all risk of use. Map Quest and its suppliers'shali riot be liable to you for any loss or delay resulting from
your use of MapQuest. Your use of MapQuest means you agree to our Tri;,,_- nf-tjse
http://www.mapquest.com/print 4/21/2010