Loading...
HomeMy WebLinkAbout090176_Structure Evaluation Inspection_20181002 /— 6—f`" Structure Evaluation inspection Facility Number: -- / 7(e Date: j 0 Time in: f/ 33 Time-out: ( �-<< Farm Name: /! ()urn F n) Farm 911 address: • Owner Name: l t�� C(--. ?���( Phone Facility Contact: Onsite Representative: Integrator: Certified Operator: V Cert. Number Is storage capacity less than adequate? Yes �No If yes is waste level into the structural freeboard? Yes No Was non-compliant level reported to DWR y`t� POA received c -5_5 Structure: 1 2 - 3 V 4 5 6 Identifier: • Spillway? • Designed Freeboard (in.): Observed Freeboard (in.): • Are there any immediate threats to the integrity of any of the structures observed? Yes No Do any structures lack adequate markers as required by the permit? Yes No --' Does any part of the wasterrianagement system need repair Yes No .� Condition of field's . ' - Condition of receiving crop. roe,'(-) " Comments: e • L