HomeMy WebLinkAbout090176_Plan of Action (POA)_20200602 C J -PLAN OF ACTION (PoA). FOR HIGI-9 FREEBOARD AT:ANIMAL FACILITIES Facility.Number:: :. 1-7 (o County: al c1(- ilk Facility Name: 1‹ 2.. Certified Operator Name: U )I Le Rica rd Operator:# 6 o27/ . 1. Current liquid level(s)- in inches as measured from the: current liquid level in the lagoon:to the lowest point:on the top of the dam for:lagoons without spillways; and,from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways:.:: Structure 1 Structure 2:: Structure 3 Structure 4 Structure 5 Structure 6 Lagoon Name/Identifier (ID): Spillway (Yes or No): :. .. ' .. Level (inches): I. 2. Check all applicable items Liquid level is within the-designed structural freeboard elevations of one or more structures. Five : and 30 day Plans of.Action are attached.. Hydraulic•and agronomic balances are within acceptable ranges.: Liquid level is within the.25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached Agronomic balance is within acceptable range.. Waste is to be pumped and hauled to off site locations.: Volume:and PAN content of waste to pumped and hauled is reflected in section III tables. Included within this. plan is a list of the :proposed:sites with related facility number(s); number: acres and receiving crop :information. Contact and secure approval from the Division of Water Quality prior to transfer of waste • to a site not covered in the facility's certified animal waste management plan. Operation will be partially or:fully depopulated. :: attach a complete schedule:with:corresponding animal units and dates for depopulation. - if animals are to be moved to another.-permitted facility, provide facility number, lagoon freeboard:levels and herd population for the receiving facility 3. Earliest possible date:to begin land applicatiion:of waste:: ,10 I hereby certify that I have reviewed the:information listed above land included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. $foci :.Phone: ( Io) 32o ,iq Facility Owner/Manager(print): Date: (4 • a--G.. Facility Owner/Manager(signature) PoA Cover Page 2/21/00 II TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR.STORM STORAGE ELEVATIONS IN ALL:WASTE STRUCTURES FOR FACILITY 1. Structure:ID: -ABK#2 9-176 line rri= 547.3 lb PAN : 2 Structure ID: .. line m = lb PAN 3. Structure ID:. line m= lb PAN 4 Structure ID: line m ::lb PAN :. 5-: Structure ID`. linem:= lb PAN 6 Structure ID: .. line m = lb PAN . n. dines 1 +2+3+4+5+.6_ 547.3 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING.30 DAY DRAW:DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract# : p- field:# O. crop r. acres s.remaining IRR-t.TOTAL PAN u.application window • - • 2 PAN balance BALANCE FOR • (lb/acre) FIELD(Ibs.) • column r x s . . T10981 • .any bermuda : :29.20 . :100.00. . 2920.0 Sept-April . *guestimation on PAN left-only pumped a few times this year: '.State current crop ending;application date or.next crop application beginning date for available receiving crops during 30 day draw down period:. v:'Total PAN available for all fields (sum of column t)= • :_ 2920.0 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II)e 547.3'lb. PAN x: Crop's remaining PAN balance:(line v from section III)= 2920.0 lb. PAN ye Overall PAN balance(w-x)= -2373 lb..PAN Line=y must show as a deficit. If line y does not show as a deficit, list course-Of action here including pump and haul, depopulation, herd reduction,_ etc. For pump&:haul and herd reduction options, recalculate new PAN based on:new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the.PAN balance table and recalculate:the overall PAN balance. If animal wastes to be hauled to another permitted facility;:provide information regarding the herd population and lagoon freeboard levels at the receiving:facility.:- - NARRATIVE: • Will begin pumping as soon as field conditions allow.: PoA(30 Day)2/21/00 PLAN OF ACTION (PoA):FOR HIGH FREEBOARD AT ANIMAL FACILITIES_. 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO.BE LAND.APPLIED.PER WASTE STRUCTURE 1: Structure Name/Identifier(ID): ABK#2 9-176: :2. .Current liquid volume in 25 yr./24 hr. storm storage&structural.freeboard . a. current liquid level according to marker 18:0 inches b. designed 25 yr./24 hr. storm:&structural freeboard 19.0 inches: c: line b-line a (inches in red zone);= 1.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 98350 ft2 e, line c/12 x line d x_7.48 gallons/ft3 61305 gallons 3. Projected volume of waste:liquid produced during draw down period f. temporary storage period according to:structural design 180 days g. volume of waste produced according to structural design 121058 ft3 h. current herd# 3672 certified herd# 3672 actual waste produced = current herd# x line g = =121058 ft3 certified herd# - i. volume of wash wateraccordi:ng:to structural-design ft3: j. excess rainfall over evaporation according to design 59600 ft3 k: (lines h + i+j)x 7.48 x= 30: days/line,f= = 225220 gallons 4. Total PAN to be land applied during draw down period .. I. current waste anal sis dated y� 1/13/2020 1.91 lbs/1000 gal. m. ((lines e+ k)/1000)x line I= 547:3 lbs. PAN . . REPEAT.SECTION I.FOR EACH WASTE.STRUCTURE ON.SITE. .. . (Click on the.next Structure tab shown below) - _ PoA(30 Day)2/21/00