-PLAN OF ACTION (PoA). FOR HIGI-9 FREEBOARD AT:ANIMAL FACILITIES
Facility.Number:: :. 1-7 (o County: al c1(- ilk
Facility Name: 1‹ 2..
Certified Operator Name: U )I Le Rica rd Operator:# 6 o27/ .
1. Current liquid level(s)- in inches as measured from the: current liquid level in the lagoon:to the
lowest point:on the top of the dam for:lagoons without spillways; and,from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways:.::
Structure 1 Structure 2:: Structure 3 Structure 4 Structure 5 Structure 6
Lagoon Name/Identifier (ID):
Spillway (Yes or No): :. .. ' ..
Level (inches): I.
2. Check all applicable items
Liquid level is within the-designed structural freeboard elevations of one or more structures. Five
: and 30 day Plans of.Action are attached.. Hydraulic•and agronomic balances are within
acceptable ranges.:
Liquid level is within the.25 year 24 hour storm elevations for one or more structures. A 30 day
Plan of Action is attached Agronomic balance is within acceptable range..
Waste is to be pumped and hauled to off site locations.: Volume:and PAN content of waste to
pumped and hauled is reflected in section III tables. Included within this. plan is a list of the
:proposed:sites with related facility number(s); number: acres and receiving crop :information.
Contact and secure approval from the Division of Water Quality prior to transfer of waste
• to a site not covered in the facility's certified animal waste management plan.
Operation will be partially or:fully depopulated. ::
attach a complete schedule:with:corresponding animal units and dates for depopulation.
- if animals are to be moved to another.-permitted facility, provide facility number, lagoon
freeboard:levels and herd population for the receiving facility
3. Earliest possible date:to begin land applicatiion:of waste:: ,10
I hereby certify that I have reviewed the:information listed above land included within the attached Plan
of Action, and to the best of my knowledge and ability, the information is accurate and correct.
$foci :.Phone: ( Io) 32o ,iq
Facility Owner/Manager(print):
Date: (4 • a--G..
Facility Owner/Manager(signature)
PoA Cover Page 2/21/00
II TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR.STORM STORAGE ELEVATIONS IN ALL:WASTE STRUCTURES FOR FACILITY
1. Structure:ID: -ABK#2 9-176 line rri= 547.3 lb PAN :
2 Structure ID: .. line m = lb PAN
3. Structure ID:. line m= lb PAN
4 Structure ID: line m ::lb PAN :.
5-: Structure ID`. linem:= lb PAN
6 Structure ID: .. line m = lb PAN .
n. dines 1 +2+3+4+5+.6_ 547.3 lb PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING.30 DAY DRAW:DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD.
o. tract# : p- field:# O. crop r. acres s.remaining IRR-t.TOTAL PAN u.application window
• -
• 2 PAN balance BALANCE FOR
• (lb/acre) FIELD(Ibs.)
• column r x s
. .
T10981 • .any bermuda : :29.20 . :100.00. . 2920.0 Sept-April .
*guestimation on PAN left-only pumped a few times this year:
'.State current crop ending;application date or.next crop application beginning date for available
receiving crops during 30 day draw down period:.
v:'Total PAN available for all fields (sum of column t)= • :_ 2920.0 lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II)e 547.3'lb. PAN
x: Crop's remaining PAN balance:(line v from section III)= 2920.0 lb. PAN
ye Overall PAN balance(w-x)= -2373 lb..PAN
Line=y must show as a deficit. If line y does not show as a deficit, list course-Of action here including pump and
haul, depopulation, herd reduction,_ etc. For pump&:haul and herd reduction options, recalculate new PAN
based on:new information. If new fields are to be included as an option for lowering lagoon level, add these
fields to the.PAN balance table and recalculate:the overall PAN balance. If animal wastes to be hauled to
another permitted facility;:provide information regarding the herd population and lagoon freeboard levels at the
receiving:facility.:- -
NARRATIVE: •
Will begin pumping as soon as field conditions allow.:
PoA(30 Day)2/21/00
PLAN OF ACTION (PoA):FOR HIGH FREEBOARD AT ANIMAL FACILITIES_.
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO.BE LAND.APPLIED.PER WASTE STRUCTURE
1: Structure Name/Identifier(ID): ABK#2 9-176:
:2. .Current liquid volume in 25 yr./24 hr. storm storage&structural.freeboard .
a. current liquid level according to marker 18:0 inches
b. designed 25 yr./24 hr. storm:&structural freeboard 19.0 inches:
c: line b-line a (inches in red zone);= 1.0 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 98350 ft2
e, line c/12 x line d x_7.48 gallons/ft3 61305 gallons
3. Projected volume of waste:liquid produced during draw down period
f. temporary storage period according to:structural design 180 days
g. volume of waste produced according to structural design 121058 ft3
h. current herd# 3672 certified herd# 3672
actual waste produced = current herd# x line g = =121058 ft3
certified herd# -
i. volume of wash wateraccordi:ng:to structural-design ft3:
j. excess rainfall over evaporation according to design 59600 ft3
k: (lines h + i+j)x 7.48 x= 30: days/line,f= = 225220 gallons
4. Total PAN to be land applied during draw down period ..
I. current waste anal sis dated y� 1/13/2020 1.91 lbs/1000 gal.
m. ((lines e+ k)/1000)x line I= 547:3 lbs. PAN . .
REPEAT.SECTION I.FOR EACH WASTE.STRUCTURE ON.SITE. .. .
(Click on the.next Structure tab shown below) - _