HomeMy WebLinkAboutNCC192265_NOT Closeout Documents_2020120415A CATAWBA COUNTY UTILITIES & ENGINEERING DEPARTMENT
SEDIMENTATION INSPECTION REPORT
INSPECTION ECINSP-477139
In Compliance
CASE NUMBER: ECPC-09-2019-122070
PROJECT: PROJ-11-2017-11919 N. Center St Retail Shell
PARCEL/ADDRESS: 370416839361 2910 N CENTER ST, HICKORY NC 28601
START DATE: 04/28/2020 Tuesday 11:24 am
COMPLETION DATE: 04/28/2020 Tuesday 11:24 am
CONTACT LIST
Architect OVERCASH DEMMITT ARCHITECTS, 2010 S TRYON ST IA, CHARLOTTE NC 28203,
B:7049263355C:7049056844 DWENDOVER@ODA.US.COM
Contact Person - Erosion Contrc BOHLER ENGINEERING NC, PLLC, 4130 PARK LAKE AVE 130, RALEIGH NC 27612,
13:9195789000 WBONE@BOHLERENG.COM
Financier TRIBEK PROPERTIES, INC., 2820 SELUYN AVE 425, CHARLOTTE NC 28209, 13:70471
42860C:7049056805F:7043338485 SBORTZ@TRIBEK.COM
Land Owner SUNSET SOUTHSTAR LLC, 101 S KINGS DR SUITE 200, CHARLOTTE NC 28204
Lien Agent CHICAGO TITLE COMPANY, LLC, 19 W HARGETT ST, RALEIGH NC 27601, 13:888690
7384 NANCY.FERGUSON@CTT.COM
Contractor KENNETH ANDUJAR, 3013 GRIFFITH ST, CHARLOTTE NC 28203, 13:7043634813
Contractor KP SITE DEVELOPMENT, 19600 GALLEON VIEW, CORNELIUS NC 28301, C:7043631
356
PICTURES: PRINTS: SLIDES: 17-1 DIGITAL: ❑
WEATHER & SOIL CONDITIONS
cloudy, warm, soil workable
PROGRESS INSPECTION
IS SITE CURRENTLY UNDER NOTICE OF VIOLATION?
VIOLATIONS
❑ a. No approved plan 31-4 (c)
❑ b. Failure to follow approved plan 31-5 (f)
❑ c. Failure to submit revised plan 31-6 (m)
❑ d. Failure to provide adequate groundcover 31-5 (d)
❑ e. Insufficient measures to retain sediment on site 31-7 (e)
❑ f. Failure to take all reasonable measures 31-4 (d)
PHASE OF GRADING: Final grading complete
POTENTIAL NPDES PERMIT VIOLATION? No
HAS SEDIMENTATION DAMAGE OCCURED? No
❑ Lake/natural watercourse on the tract
❑ Lake/natural watercourse off the tract
ZIX
VIDEO: ❑
❑ g. Inadequate buffer zone 31-5 (a)(1)
❑ h. Graded slopes and fills too steep 31-5 (b)
❑ i. Unprotected exposed slopes 31-5 (b)
❑ j. Failure to maintain erosion control
❑measures 31-13
k. Notice of activity initiation 31-6 (j)
❑ I. Other (describe)
DEGREE OF DAMAGE:
❑ Other property
❑ Road/walkway
E9 - rinspsedimentationreport 05/14/2020 11:25 Page 1 of 2
$A cOG CATAWBA COUNTY UTILITIES & ENGINEERING DEPARTMENT
SEDIMENTATION INSPECTION REPORT
" INSPECTION ECINSP-477139
1842 5M In Compliance
INSPECTION REPORT IN CASE FILE DUE TO Sent to person financially responsible
DATE GIVEN/SENT
CORRECTIVE ACTIONS NEEDED
CONCLUSION
COMMENTS
Permanent ground cover sufficient to restrain erosion has been established.
No additional self -monitoring or self -inspections are required.
Project is released and coverage under NPDES General Stormwater Permit for Construction Activities is terminated.
REPORT BY Toni Norton
E9 - rinspsedimentationreport 05/14/2020 11:25 Page 2 of 2