Loading...
HomeMy WebLinkAboutNCC192265_NOT Closeout Documents_2020120415A CATAWBA COUNTY UTILITIES & ENGINEERING DEPARTMENT SEDIMENTATION INSPECTION REPORT INSPECTION ECINSP-477139 In Compliance CASE NUMBER: ECPC-09-2019-122070 PROJECT: PROJ-11-2017-11919 N. Center St Retail Shell PARCEL/ADDRESS: 370416839361 2910 N CENTER ST, HICKORY NC 28601 START DATE: 04/28/2020 Tuesday 11:24 am COMPLETION DATE: 04/28/2020 Tuesday 11:24 am CONTACT LIST Architect OVERCASH DEMMITT ARCHITECTS, 2010 S TRYON ST IA, CHARLOTTE NC 28203, B:7049263355C:7049056844 DWENDOVER@ODA.US.COM Contact Person - Erosion Contrc BOHLER ENGINEERING NC, PLLC, 4130 PARK LAKE AVE 130, RALEIGH NC 27612, 13:9195789000 WBONE@BOHLERENG.COM Financier TRIBEK PROPERTIES, INC., 2820 SELUYN AVE 425, CHARLOTTE NC 28209, 13:70471 42860C:7049056805F:7043338485 SBORTZ@TRIBEK.COM Land Owner SUNSET SOUTHSTAR LLC, 101 S KINGS DR SUITE 200, CHARLOTTE NC 28204 Lien Agent CHICAGO TITLE COMPANY, LLC, 19 W HARGETT ST, RALEIGH NC 27601, 13:888690 7384 NANCY.FERGUSON@CTT.COM Contractor KENNETH ANDUJAR, 3013 GRIFFITH ST, CHARLOTTE NC 28203, 13:7043634813 Contractor KP SITE DEVELOPMENT, 19600 GALLEON VIEW, CORNELIUS NC 28301, C:7043631 356 PICTURES: PRINTS: SLIDES: 17-1 DIGITAL: ❑ WEATHER & SOIL CONDITIONS cloudy, warm, soil workable PROGRESS INSPECTION IS SITE CURRENTLY UNDER NOTICE OF VIOLATION? VIOLATIONS ❑ a. No approved plan 31-4 (c) ❑ b. Failure to follow approved plan 31-5 (f) ❑ c. Failure to submit revised plan 31-6 (m) ❑ d. Failure to provide adequate groundcover 31-5 (d) ❑ e. Insufficient measures to retain sediment on site 31-7 (e) ❑ f. Failure to take all reasonable measures 31-4 (d) PHASE OF GRADING: Final grading complete POTENTIAL NPDES PERMIT VIOLATION? No HAS SEDIMENTATION DAMAGE OCCURED? No ❑ Lake/natural watercourse on the tract ❑ Lake/natural watercourse off the tract ZIX VIDEO: ❑ ❑ g. Inadequate buffer zone 31-5 (a)(1) ❑ h. Graded slopes and fills too steep 31-5 (b) ❑ i. Unprotected exposed slopes 31-5 (b) ❑ j. Failure to maintain erosion control ❑measures 31-13 k. Notice of activity initiation 31-6 (j) ❑ I. Other (describe) DEGREE OF DAMAGE: ❑ Other property ❑ Road/walkway E9 - rinspsedimentationreport 05/14/2020 11:25 Page 1 of 2 $A cOG CATAWBA COUNTY UTILITIES & ENGINEERING DEPARTMENT SEDIMENTATION INSPECTION REPORT " INSPECTION ECINSP-477139 1842 5M In Compliance INSPECTION REPORT IN CASE FILE DUE TO Sent to person financially responsible DATE GIVEN/SENT CORRECTIVE ACTIONS NEEDED CONCLUSION COMMENTS Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is released and coverage under NPDES General Stormwater Permit for Construction Activities is terminated. REPORT BY Toni Norton E9 - rinspsedimentationreport 05/14/2020 11:25 Page 2 of 2