HomeMy WebLinkAbout20061833 Ver 1_Certification of Completion_201008170(4-100315
Azov_ -d 0 7
Bobbitt Design-Build, Inc.
600 Germantown Road
Raleigh North Carolina 27607
Letter of Transmittal
(919) 851-1980 Date: 2-Aug-10 Job Number: 2802
Fax (919) 851-1982 Job Name: Gregory Poole Subdivision
bobbitt.com DWQ#06-1833
To: NC Div. Water Quality Attention: Wetlands/401 Certification Unit
2321 Crabtree Blvd, Suite250
Raleigh, NC
We are sending you the following items:
Shop drawings Plans
Copy of letter Samples
Prints Specifications
Change order
Copies Date No. Description
1 Original Certificate of Completion including pictures upstream and down stream
of intermittent stream impact and of filled wetland, upstream and
downstream of filled wetland
?G@LN0V
A U G 17 2C ;;i
DENR - wATER OUAL.
MTLANDS AND STORNIYcArcR dry,::
rhese are transmitted:
FOR BIDS DUE (Date)
For approval Resubmit copies for approval
For your use Submit copies for approval
As requested Return corrected prints
For review & comment
Approved as submitted
Returned for corrections
Remarks:
Please let me know if you have any questions
Thanks
Copy to: File From: Blair Pittman
b ittman bob i .
Certification of Completion
DWQ ProjectNo.:
o&-110 33
County:
Applicant: /6o C o
project Name: RE a2 3
Date of Issuance of Wetland Permit: !?G b8•a? Zo 0
Certificate of Completion
Upon. completion of all work approved within the 401 Water Quality Certification and Buffer Rules, and any
subsequent modifications, the applicant is required to return this certificate to the 401 Oversight/Express Permitting Unit,
North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be
returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send
certificates from all of these.
Applicant's Cerdfication
hereby state that, to the best of my abilities, due care and diligence was
used in the observation of the construction such that the construction was observed to be, built within substantial
compliance and intent of the 401 Water Quality Certifiication.'and- Buffer Rules, the-approved plans and specifications,
and other supporting materials.
Signaature:
Date: `
L a ~
.
'
2.010
Agent's Certification Dr ;k
TL WDS AND STTOR?AA? wkm
hereby stale that, to,the best of my abilities, due care and diligenco was
used in the observation of the construction such that. the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules, the.approved plans and specifications,
and other supporting materials.
Signature: Date:
If this project was designed by a Certified Professional -
&INAW as a duly registered Professional Engineer,.
Landscape Architect, Surveyor, -etc.) in the State of North Carolina, having been authorized to. observe -(Reriodi_aa L
weekly,. full time) the construction of the project, for the Permittee hereby state that, to the best of my abilities, due care .
and diligence was used in the observation of the construction such that the construction was observed to be built within
substantial compliance and intent of the 401 Water Quality Certification and. Buffer Rules, the approved plans and
specifications,. and other supporting materials.
Signature: _ Registration No. 243 5 Date /a
AREA DOWNSTREAM OF FILLED STREAM
AREA UPSTREAM OF FILLED STREAM
AREA OF FILLED STREAM
AREA DOWNSTREAM OF FILLED WETLAND
I-85 RIGHT-OF-WAY
AREA OF FILLED WETLAND
LOOKING NORTH FROM SOUTHERN PORTION
LOOKING SOUTH FROM NORTHERN PORTION
AREA UPSTREAM OF FILLED WETLAND