Loading...
HomeMy WebLinkAbout20070258 Ver 1_More Info Received_2007041003/29/2007 01:31 9196760211 MARK_TAM PAGE 01 ~' F W Ar~ Michael F. Gaslcy, Governor 9pG O~~ William G. Ross Jr., Secretary ~ (/~ tq,. North Carolina Department of&nvirtmment anA Nawml Resources ~ y Alen W. Klimek, P.E. Director Q Y Division of Water qualiry March 26, 200? DWQ Project # 07-0258 Franklin County CERTIFIED MAIL: RETURN RECEIPT REQUESTED Mr. Mark Miller 11717 Stannary Place Raleigh,NC 27b13 Subject Property: Mark Miller Lake Royale [030301, 28-31-(1), B, NSW] REQUEST FOR MORE INFORMATION ~ - Dear Mr. Miller; On February 13, 2007, the Division of Water Quality (DWQ} received your application dated February 12, 2007, to fill or otherwise impact 0.0067 acres of open waters below the normal pool lake level, 0.0033 acres of open waters above the normal pool lake level, and shade 0.0004 of open waters above the normal pool lake level, and impact 168 square feet of Zone 1 of the Tar-Pamlico River basin protected riparian buffer to construct a 147-foot bulkhead and 10'x16' dock and 12'x24' boathouse at the subject property. On March 14, 2007, the DWQ received additional information from you, however, the DWQ has determined that your application remains incomplete and/or provided inaccurate information as discussed below. The DWQ will require additional information in order to process your application to impact protected wetlands and/or streams on the subject property. Therefore, unless we receive five copies of the additional information requested below, we will have to move toward denial of your application as required by 15A NCAC 2H .0506 and will place this project on (told as incomplete until we receive this additional information. Please provide the following information so that we may continue to review your project. Additional Information Requested: 1. Your proposed seawall does not appear to be necessary due to the stabilizing presence of buffer vegetation. Please provide justification for the.neccs5ity of a seawall along the entire lakefront property line. Please contact the DWQ within three weeks of tl,e date of this letter to verify that you have received this letter and to provide us with a date that we may expect to receive this requested information. if we do not receive this requested information within one week of the date you indicate it will be forthcoming, your project will be withdrawn and you will need to reapply with a new application and a new fee. Please contact me in writing and Lauren Cobb of the DWQ Raleigh Regional Office. If we do not hear from you within three weeks, we will assume that you no longer want to pursue this project and we will consider the project as withdrawn. This letter only addresses the application review and does not authorize any impacts to wetlands, waters or protected buffers. Please he aware that any impacts requested within your application are not a, !`,~ ~ ~R ~ ~~~ ~ Zoc~ r~~~~ av ~1~TI.gAID;;A;,IDr~~~~Ql~tag ~~N 03/29/2007 01:32 9196760211 MARK_TAM PAGE 01 Mark Miller Pale 2 of 2 March 2G, 2007 authorized (at This time) by the DWQ, Please call Ms. Cyndi Karoly or Mr. Ian McMillan at 919-733- 1786 if you have any questions regarding or would like to Set up a meeting to ~scuss this matter, S' c rely ndi Karoly, Supervisor .401' OversightBxpress Review Permitting Unit C.BK/ijm cc: Lauren Cobb, DWQ Raleigh Regional Office USACE Raleigh Regulatory Field Office File Copy Central Files Filcnomc~ 07a258M~rkMiller(Fnnklio)On Hold2 Re: Mark Miller, DWQ project #07-0258 04/04/2007 On Apri14`h, 2007 we contact Ian McMillian as specified in your letter concerning the application for Mark 1C~Iiller, DWQ project #07-0258, in regard to the seawall to the property line. This application was received by DWQ on February 13, 2007. In the time since permit was applied for, we have worked with Amy Chapman on another seawall issue and how the construction of the boathouse and/or boat slip requires a seawall. We discussed with Ms. Chapman that to properly construct the boathouse and/or boat slip a 5'ft seawall on each side of the slip seawall is integral to the construction and necessary for the retention of existing soils. Basically, as with the previously mentioned permit, this is what necessary for this permit as well. A five foot section of seawall on either side of the boathouse is needed to ensure the retention of existing soils. Sincerely, Jason Rivera Lakesides, Inc 919-244-1622