Loading...
HomeMy WebLinkAboutNCC192200_NOT Closeout Documents_20201130North Carolina Department of Environmental Quality Land Resources: 943 Washington Square Mall, Washington, NC 27889 (252) 946-6481 County: Wayne Project: HF Lee Haul Road Person financially responsible: Duke Energy Progress LLC - Bobby Smith Address: 400 S Tryon St, Charlotte, NC 28202 1. Project Location: BLACK JACK CHURCH RD, Goldsboro Pictures: No 2. Weather and soil conditions: Sunny, cool, dry 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes 5. Violations: 6. Is the site in compliance with the NPDES Permit? Yes Describe: River basin: Neuse Project #: WAYNE-2020-003 Initial inspection: No If no, check violations below: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Joyce Dishmon, Ricky Stroupe Title: HF Lee Manager Inspection report: Sent Report Date given/sent: November 30, 2020 9. Corrective action needed: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is released. 10. Comments: Termination of coverage under NPDES General Stormwater Permit for Construction Activities should be requested by the permittee via a Notice of Termination. Reported by: Bradley West Others present: J. Row Date of inspection: November 23, 2020 Time arriving on site: 11:00 AM Time leaving site: 1:00 PM cc: