Loading...
HomeMy WebLinkAboutNCC191860_NOT Closeout Documents_20201130North Carolina Department of Environmental Quality Land Resources: 450 W. Hanes Mill Road, Suite 300, Winston-Salem, NC 27105 (336) 776-9800 County: Yadkin Project: E Main St to Service Rd River basin: Yadkin-PeeDee Person financially responsible: Frontier Natural Gas Company - Fred Steele Project #: YADKI-2019-011 Address: 110 PGW Drive, Elkin, NC 28621 1. Project Location: E Main St., Yadkinville Pictures: No 2. Weather and soil conditions: 50's clear Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Taylor Younger Title: FNG Inspection report: Sent Report Date given/sent: November 23, 2020 9. Corrective action needed: 10. Comments: Project construction is complete and all disturbed areas are established with adequate vegetation. Project file is closed. Reported by: Tim Latham Others present: Date of inspection: November 17, 2020 Time arriving on site: 2:15 PM Time leaving site: 2:25 PM cc: tyounger&egas.net; Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is released. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities should be requested by the permittee via Notice of Termination.