HomeMy WebLinkAboutNCC191860_NOT Closeout Documents_20201130North Carolina Department of Environmental Quality
Land Resources: 450 W. Hanes Mill Road, Suite 300, Winston-Salem, NC 27105 (336)
776-9800
County: Yadkin Project: E Main St to Service Rd River basin: Yadkin-PeeDee
Person financially responsible: Frontier Natural Gas Company - Fred Steele Project #: YADKI-2019-011
Address: 110 PGW Drive, Elkin, NC 28621
1. Project Location: E Main St., Yadkinville
Pictures: No
2. Weather and soil conditions: 50's clear Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name): Taylor Younger Title: FNG
Inspection report: Sent Report Date given/sent: November 23, 2020
9. Corrective action needed:
10. Comments: Project construction is complete and all disturbed areas are established with adequate
vegetation.
Project file is closed.
Reported by: Tim Latham Others present:
Date of inspection: November 17, 2020 Time arriving on site: 2:15 PM Time leaving site: 2:25 PM
cc: tyounger&egas.net;
Permanent ground cover sufficient to restrain erosion has been established. No additional
self -monitoring or self -inspections are required. Project is released. Termination of coverage
under the NPDES General Stormwater Permit for Construction Activities should be requested by
the permittee via Notice of Termination.