Loading...
HomeMy WebLinkAboutNCC190324_NOT Closeout Documents_20201130North Carolina Department of Environmental Quality Land Resources: 610 East Center Avenue, Suite 301, Mooresville, NC 28115 (704) 663-1699 County: Cabarrus Project: Harris Square Person financially responsible: Town of Harrisburg - Daniel Stines, Parks & Recreation Director Address: PO Box 100, Harrisburg, NC 28075 1. Project Location: NC Highway 79, Harrisburg Pictures: No 2. Weather and soil conditions: Rainy 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes 5. Violations: River basin: Yadkin-PeeDee Project #: CABAR-2019-081 Initial inspection: No If no, check violations below: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): No one on site Title: Inspection report: Gave Report Date given/sent: January 08, 2020 9. Corrective action needed: Yes 10. Comments: Inspection showed that the project is completed as per plan. Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is released. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities should be requested by the permittee via Notice of Termination (NOT) if the plan was approved after April 1, 2019. Prior to this date, you do not need to submit any NOT. If you have any questions, please contact me at Erin.Ireland@ncdenr.gov or by phone at (704) 235-2139 Reported by: Erin Ireland Others present: Kenny Llywelyn Date of inspection: January 07, 2020 Time arriving on site: 12:40 PM Time leaving site: 12:50 PM cc: