Loading...
HomeMy WebLinkAbout20201631 Ver 1_PreFiling Email 30-Day Clock Reached Email_20201128Strickland, Bev From: laserfiche@ncdenr.gov Sent: Saturday, November 28, 2020 12:01 AM To: j.shepherd@booth-assoc.com Cc: Tankard, Robert Subject: Pre -Filing Time Clock has been reached for UG Fiber Crossing of ICW - 20201631 Ver Attachments: DWR Pre -Filing Meeting Request Form.pdf The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for UG Fiber Crossing of ICW that you submitted on 10/28/2020. The ID number for that project is 20201631, Version 1. Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be accepted. When you submit your application please upload a copy of the attached document in this email. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not monitored. ID#* 20201631 Version* 1 Regional Office* Washington Regional Office - (252) 946-6481 Reviewer List* Robert Tankard Pre -Filing Meeting Request submitted 10/28/2020 ..................................................................................................................................................................................................................................................... Contact Name * Joshua Shepherd Contact Email Address* j.shepherd@booth-assoc.com Project Name* UG Fiber Crossing of ICW Project Owner* Project County* Owner Address: Kevin Heath, Albemarle Electric Membership Corporation Camden Street Address 125 Cooperative Way Address Line 2 aty Hertford Rbstal / Zip Code 27944 Is this a transportation project?* r Yes r No Type(s) of approval sought from the DWR: r- 401 Water Quality Certification - F- 401 Water Quality Certification - Regular Express r- Individual Permit r- Modification r- Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No State / Frovince / Region NC Country USA Do you know the name of the staff member you would like to request a meeting with? Please give a brief project description below. * One underground fiber line will cross the Dismal Swamp canal at a depth of 15' belowthe bottom of the canal. See attached Plan/Profile project proposal and vicinity map of the area. Horizontal Directional Drilling will cause very little disturbance to the agricultural ground adjacent to the canal. There is an existing underground distribution line directly adjacent to this proposed project location. I previously filled out a PCN, but it was denied today due to not filling out this form first and waiting 30 days. I have attached the PCN also for reference. Please give a couple of dates you are available for a meeting. 10/29/2020 11 /2/2020 11 /3/2020 11 /4/2020 11 /5/2020 Please attach the documentation you would like to have the meeting about. 4479911 _PP_UG. pdf 324.92 KB 4479911 _vm. pdf 269.85KB 4479911 _usgs. pdf 1.63MB 4479911 _n res. pdf 1.66MB Agent Auth Form.pdf 651.53KB Endangered Species List.pdf 480.93KB HistoricalCultural.pdf 228.16KB Pre -Construction Notification (PCN) Form.pdf 126.16KB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature r"?; dr��r, , 5; �,c�,,ta" Submittal Date 10/28/2020