HomeMy WebLinkAbout20201631 Ver 1_PreFiling Email 30-Day Clock Reached Email_20201128Strickland, Bev
From: laserfiche@ncdenr.gov
Sent: Saturday, November 28, 2020 12:01 AM
To: j.shepherd@booth-assoc.com
Cc: Tankard, Robert
Subject: Pre -Filing Time Clock has been reached for UG Fiber Crossing of ICW - 20201631 Ver
Attachments: DWR Pre -Filing Meeting Request Form.pdf
The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for UG Fiber Crossing
of ICW that you submitted on 10/28/2020. The ID number for that project is 20201631, Version 1.
Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be
accepted.
When you submit your application please upload a copy of the attached document in this email.
This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as
responses are not monitored.
ID#* 20201631 Version* 1
Regional Office* Washington Regional Office - (252) 946-6481
Reviewer List* Robert Tankard
Pre -Filing Meeting Request submitted 10/28/2020
.....................................................................................................................................................................................................................................................
Contact Name * Joshua Shepherd
Contact Email Address* j.shepherd@booth-assoc.com
Project Name* UG Fiber Crossing of ICW
Project Owner*
Project County*
Owner Address:
Kevin Heath, Albemarle Electric Membership Corporation
Camden
Street Address
125 Cooperative Way
Address Line 2
aty
Hertford
Rbstal / Zip Code
27944
Is this a transportation project?* r Yes r No
Type(s) of approval sought from the DWR:
r- 401 Water Quality Certification - F- 401 Water Quality Certification -
Regular Express
r- Individual Permit r- Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
State / Frovince / Region
NC
Country
USA
Do you know the name of the staff member you would like to request a meeting with?
Please give a brief project description below. *
One underground fiber line will cross the Dismal Swamp canal at a depth of
15' belowthe bottom of the canal. See attached Plan/Profile project
proposal and vicinity map of the area. Horizontal Directional Drilling will
cause very little disturbance to the agricultural ground adjacent to the
canal. There is an existing underground distribution line directly adjacent to
this proposed project location.
I previously filled out a PCN, but it was denied today due to not filling out
this form first and waiting 30 days. I have attached the PCN also for
reference.
Please give a couple of dates you are available for a meeting.
10/29/2020
11 /2/2020
11 /3/2020
11 /4/2020
11 /5/2020
Please attach the documentation you would like to have the meeting about.
4479911 _PP_UG. pdf
324.92 KB
4479911 _vm. pdf
269.85KB
4479911 _usgs. pdf
1.63MB
4479911 _n res. pdf
1.66MB
Agent Auth Form.pdf
651.53KB
Endangered Species List.pdf
480.93KB
HistoricalCultural.pdf
228.16KB
Pre -Construction Notification (PCN) Form.pdf
126.16KB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
r"?; dr��r, , 5; �,c�,,ta"
Submittal Date 10/28/2020