HomeMy WebLinkAboutNCC205139_ESC Approval Submitted_20201125Iredell County Planning & Development Erosion Control Section 349 North Center Street P.O. Box 788 Statesville, NC 28687 Date: October 9`h 2020 LETTER OF APPROVAL WITH MODIFICATIONS Andrew McDonald True Homes USA 2627 Brekonridge Centre Dr. Monroe, NC 28110 RE: Project Name: Hidden Lakes Phases 6, 7 & 8 Acres Approved with Modifications: 72 Project ID: STVLE-2020-029 Project Location: PIN 4733233340.000 Submitted By: Bloc Design, PLLC Date Received: September 30'h 2020 Plan Type: Revised Dear Mr. McDonald: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and herby issue this Letter of Approval with Modifications. Modifications must be received in this office no later than two weeks prior to the project start date. Failure to submit modified plans can result in a violation and fine under the Iredell County Land Development Code. The Modifications required for Approval are listed on the attached page. The Certificate of Approval issued by Iredell County must be posted at the job site. This plan approval shall expire three (3) years following the date of this approval as is required by Title 15A NCAC 4B.0129 and Appendix H of the Iredell County Land Development Code. Title 15A NCAC 4B 0118(a) and Appendix H of the Iredell County Land Development Code requires that a copy of the approved erosion control plan be on file at the job site. Any amendments and/or revisions to the approved plan must be reviewed and approved prior to implementation in order for the site to remain in compliance. Failure to submit plans for approval may result in administrative actions and/or penalties as indicated in the Iredell County Land Development Code. Also, this letter gives notice as required by G.S. 1 I3A-61.1(a) and Appendix H of the Iredell County Land Development Code, of our right of periodic inspection to insure compliance with the approved plan. Iredell County's Sedimentation Pollution Control Program is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is Letter of Approval with Modifications Hidden Lakes Phases 6, 7, & 8 October 91h 2020 Page 2 of 4 inadequate to meet the requirements of the Iredell County Land Development Code and the Sedimentation Pollution Control Act of 1973, (North Carolina General Statute I I3A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act and Code. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. It is the responsibility of the applicant to obtain all other required permits or approvals. As of March 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NOI form may be accessed at deq.nc.gov/NCG0L Please direct questions about the NOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul CIark at Paul.clark@ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCGO1 permit. However, on or after May 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it is required that this office to be notified of the proposed starting date for this project. Failure to notify this office of the starting date may result in a Notice of Violation and civil penalty. Please notify us when you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, Jonathan Williams Erosion Control Inspector II Enclosures: Modifications Letter of Approval with Modifications Hidden Lakes Phases 6, 7, & 8 October 9`h 2020 Page 3 of 4 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Hidden Lakes Phases 6, 7 & 8 Project ID: STVLE-2020-029 County: Iredell Reviewed by: Jonathan Williams Required changes are designated as "RC" under legal authority from NC General Statutes Chapter 113A Article 4 and the Iredell County Land Development Code. Suggested Changes are designated as "SC" for improvement of the plan. 1. Provide a statement from Dependable Development, Inc. granting permission to True Homes USA to perform land disturbing activity on parcel 4733233340.000. —RC 2. Provide a copy of the Floodplain Development Permit from the City of Statesville prior to any land disturbing activity in the flood plain. —RC 3. Add language to the Erosion Control Notes that all land disturbing activity will be done in 20 to 25 acre phases. To disturb additional acreage will require the same amount of disturbed area to be stabilized. —RC 4. Add phasing lines on the site plan for each 20 to 25 acre phase and add reflective language to the construction sequencing. —RC 5. To be granted coverage under the NCG01 permit, all basins with a drainage area of 10 acres or greater are required to have riser structures. Add riser structures to Basins 3 & 4 and provide detail..- RC 6. Turn silt fencing up at Basins 3 & 5 at the skimmer outlets so that the treated basin discharge leaves the site through undisturbed ground. —RC 7. Show the construction entrance for Stage 1 at the Batten Ridge Drive stub -out. If not being used for a construction entrance in Stage 1, close access off. —RC 8. Adjust Basin 1 skimmer orifice size to 2.75 inches in Stage 1 to dewater the required volume of 37350 ft3 in as close to 3 days' time (3.02 days) possible. —RC 9. Adjust Basin 1 skimmer orifice size to 2.5 inches in Stage 2 to dewater the required volume of 28152 ft3 in as close to 3 days' time (2.76 days) possible. —RC 10. Adjust Basin 2 skimmer orifice size to 2 inches in Stage 1 to dewater the required volume of 19206 ft3 in as close to 3 days' time (3.22 days) possible. —RC 11. Adjust Basin 2 skimmer orifice size to 2.5 inches in Stage 2 to dewater the required volume of 28458 ft3 in as close to 3 days' time (3.05 days) possible. —RC 12. Adjust Basin 3 skimmer orifice size to 2 inches to dewater the required volume in as close to 3 days' time (Stage 1 - 3.13, Stage 2 - 3.12 days) possible. —RC 13. Adjust Basin 4 skimmer orifice size to 2.5 inches in Stage 1 to dewater the required volume of 27774 ft3 in as close to 3 days' time (2.72 days) possible. -RC 14. Adjust Basin 4 skimmer orifice size to 2.25 inches in Stage 2 to dewater the required volume of 24984 ft3 in as close to 3 days' time (3.02 days) possible. —RC Letter of Approval with Modifications Hidden Lakes Phases 6, 7, & 8 October 91h 2020 Page 4 of 4 15. Adjust Basin 5 skimmer size to 3 inches and orifice size to 1.5 inches in Stage 1 to dewater the required volume of 7812 ft3 in as close to 3 days' time (3.01 days) possible. RC 16. Adjust Basin 5 skimmer size to 3 inches and orifice size to 1.25 inches in Stage 2 to dewater the required volume of 5094 ft3 in as close to 3 days' time (2.82 days) possible. - RC