Loading...
HomeMy WebLinkAbout20080737 All Versions_Email_20100603Ridings, Rob From: Stanton, Tyler P Sent: Thursday, June 03, 2010 8:00 AM To: Ridings, Rob Subject: RE: Fay outer loop modification No problem. We'll be revising our debit ledger. Thanks, Tyler From: Ridings, Rob Sent: Tuesday, June 01, 2010 10:49 AM To: Stanton, Tyler P Subject: Fay outer loop modification Tyler, In the mod request for Fayetteville Outer Loop, it appears DOT is suggesting to use Privateer Farms mitigation for these additional impacts at 1.5:1 ratio. However in the original 401, we used a 2.5:1 ratio. 2:1 is standard for off-site, and it was bumped up to 2.5:1 (as I recall) due to being out of HUC. Since the mitigation site is certainly more mature now than it was in 2008, 1 might can adjust this down some, but due,to •• being off-site, I feel I will need to,require,at least 2:1, as typical of DWQ mitigation. According to the ledger, it appears DOT will have enough in bank to cover it. Let me know if you have any major issues with that. Thanks, Rob Ridings Transportation Permitting Unit, Wetlands & Stormwater Branch, NC Division of Water Quality 919-733-9817 rob.ridings@ncdenr.gov Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.