Loading...
HomeMy WebLinkAboutNCC191418_NOT Closeout Documents_20201119North Carolina Department of Environmental Quality Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094 (910) 433-3300 County: Cumberland Project: FB-ON-000 10- 19, Macomb Water R&R River basin: Cape Fear Person financially responsible: American States Utility Services, Inc. - Justin Project N: CUNME-2020-023 Nyland, Senior Engineer Address: P.O. Box 73316, Fort Bragg, NC 28307 1. Project Location: Macomb St./Scott St./Old Post, Fort Bragg Pictures: No 2. Weather and soil conditions: sunny/workable soils 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes 5. Violations: 6. Is the site in compliance with the NPDES Permit? Yes Describe: Initial inspection: No If no, check violations below: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Teddy Jernigan/Mat Kincade Title: Inspection report: Sent Report Date given/sent: June 25, 2020 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance with the SPCA and released. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities should be requested by the permittee via a Notice of Termination_ Please note that this correspondence must be uploaded as part of completing the Notice of Termination process. Reported by: Penny Markle Others present: Brian Williams Date of inspection: June 24, 2020 Time arriving on site: 11:20 AM Time leaving site: 11:31 AM cc: