Loading...
HomeMy WebLinkAbout20201756 Ver 1_Meeting Request Review_20201116ID#* 20201756 Regional Office* Reviewer List* Version* 1 Central Office - (919) 707-9000 Erin Davis Pre -Filing Meeting Request submitted 11/16/2020 Contact Name * Raymond Holz Contact Email Address* rholz@restorationsystems.com Project Name* Tiger Falls Project Owner* NC Division of Mitigation Services Project County* Cleveland Owner Address: Street Address 217 W Jones St. Address Line 2 Suite 3000a City Raleigh Fbstal / Zip Code 27603 Is this a transportation project? * r Yes r No State / Province / Region North Carolina Country United States Type(s) of approval sought from the DWR: W 401 Water Quality Certification - F- 401 Water Quality Certification - Regular Express r- Individual Permit F- Modification r- Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Do you know the name of the staff member you would like to request a meeting with? Erin Davis Please give a brief project description below. Full -delivery stream and wetland mitigation site for the NC Division of Mitigation Services. The project includes priority 1 stream restoration of 3392 I. ft., stream enhancement level 1 of 1584 I. ft., stream enhancement level 2 of 2261 I. ft. and preservation of 2726 I. ft, generating 5625 stream mitigation units. Further, the site includes wetland mitigation to 3.4 acres in a combination of re-establishment, rehabilitation, and enhancement, for 2.68 wetland mitigation units. Please give a couple of dates you are available for a meeting. 12/14/2020 Please attach the documentation you would like to have the meeting about. Tiger Falls - Tech Proposal Figure 5_Proposed 691.44 KB Conditions_.pdf pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 11/16/2020 Reviewer Meeting Request Decision Has a meeting been scheduled?* r Yes r No NCCGIA FIGURE Drawn by: Date: Scale: Project No.: KRJ JUL 2019 1:3700 19-001.05 Title: Project: Prepared for: Cleveland County, NC TIGER FALLSMITIGATION SITE PROPOSEDCONDITIONS 5 ³Legend Easement = 28.6 acStream Restoration = 3392 ftStream Enhancement (Level I) = 1584 ftStream Enhancement (Level II) = 2261 ftStream Preservation = 2726 ftWetland Reestablishment = 1.9 acWetland Rehabilitation = 0.2 acWetland Enhancement = 1.3 ac \Powerline2-foot Contours 0 500 1,000 1,500250Feet B u ffa lo C re e k UT-1UT-2UT- 3 U T-4 UT-4 UT-5- Step up with structures- Contour channel banks- Fence livestock- Plant - Fence livestock- Plant - Step up with structures- Contour channel banks- Fence livestock- Plant - P1/P2 stream restoration in backfilled relict channel including structures, bench, and channel construction.- Fence livestock- Treat invasive species- Plant - P1 stream restoration on new location- Fence livestock- Plant - Upgrade perched culvert - Fence livestock- Treat invasive species- Plant - Preserve channel to connect reaches- Treat invasive species - Preserve channel to connect reaches- Treat invasive species - Fence livestock- Conduct minor bank stabilization- Treat invasive species- Plant - Step up with structures- Rehydrate drained hydric soils- Contour channel banks- Plant - P1 stream restoration in relict stream channel- Rehydrate drained hydric soils- Fence livestock- Treat invasive species- Plant - Fence livestock- Conduct minor bank stabilization- Treat invasive species- Plant - Step up with structures- Contour channel banks- Treat invasive species- Fence livestock- Plant - P1/P2 stream restoration in backfilled relict channel including structures, bench, and channel construction.- Fence livestock- Treat invasive species- Plant