Loading...
HomeMy WebLinkAboutNCS000233_CEI_20201118ROY COOPER GoVernor MICHAEL S. REGAN' Secretary BRIAN WRENN Director NORTH CAROLINA Environmental Quality November 18, 2020 Trinity Manufacturing Co., Inc. Attn: Daryl Mitzel PO Box 1519 Hamlet, NC 28345 Subject: COMPLIANCE EVALUATION INSPECTION NPDES Stormwater Permit NCS000233 Trinity Manufacturing Co., Inc. Richmond County Dear Mr. Mitzel:' On November 13, 2020, a site inspection was conducted for the Trinity Manufacturing Co., Inc. facility located at 11 E.V. Hogan Drive, Hamlet, Richmond County, North Carolina. A copy of the Compliance Inspection Report is enclosed for your review. Mr. Andy Borgstrom, EHS Manager, was also present during the inspection and his time and assistance is greatly appreciated. The site visit and file review revealed that the subject facility is covered by NPDES Stormwater Permit NCS000233. Permit coverage authorizes the discharge of stormwater from the facility to receiving waters designated as a UT to Falling Creek, a class WS-III waterbody in the Yadkin River Basin; As a result of the inspection, the facility was found to be in compliance with the conditions of NPDES Stormwater Permit NCS000233. Please refer to the enclosed Compliance Inspection Report for additional comments and observations made during the inspection. Please be advised that violations of the NPDES Stormwater Permit are subject to a civil penalty assessment of up to $25,000 per day for each violation. If you or your staff have any questions, comments, or needs assistance with understanding any aspect of your permit, please contact me at (910) 433-3394 or via e-mail at mike.lawyer@ncdenr.gov. Sincerely, Michael Lawyer, CPSWQ Environmental Program Consultant Division of Energy, Mineral and Land Resources Enclosure: Compliance Inspection Report ec: Andy Borgstrom, EHS Manager —Trinity Manufacturing Co., Inc. cc: FRO — DEMLR, Stormwater Files C.�!�'" ` �`.-� ,..� North Carolina Department of environmental Quality I Division of Energy, Mineral and Land Resources Jjj Fayetteville Regional Office 1 225 Green Street, Suite 7141 Fayetteville, North Carolina 28301 NORT I CAR(A NA oenemnencorr ft"nt Q.1i� I+�"''f 910 33.3300 Compliance Inspection Report Permit: NCS000233 Effective: 03/01/12 Expiration: 02/28/17 Owner Trinity Manufacturing Co Inc SOC: Effective: Expiration: Facility: Trinity Manufacturing Co Inc County: Richmond 11 EV Hogan Dr Region: Fayetteville Hamlet NC 28345 Contact Person: Andy Borgstrom Title: EHS Manager Phone: 910-410-2702 Directions to Facility: System Classifications: Primary ORC: Certification: Phone: Secondary ORC(s): On -Site Representative(s): On -site representative Andy Borgstrom 910-410-2702 Related Permits: Inspection Date: 11/13/2020 Entry Time 02:15PM Primary Inspector: Mike Lawyer Nt Secondary Inspector(s): Reason for Inspection: Routine Permit Inspection Type: Stormwater Discharge, Individual Facility Status: 0 Compliant ❑ Not Compliant Question Areas: Storm Water (See attachment summary) Exit Time: 04:25PM Phone: 910-433-3394 Inspection Type: Compliance Evaluation Page 1 of 3 Permit: NCS000233 Owner- Facility: Trinity Manufacturing Co Inc Inspection Date: 11/13/2020 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: Permit expired on February 28, 2017. A permit renewal application was received by the Division on August 31, 2016 and the permit has been administratively extended with the same conditions until a new permit is issued. Inspection conducted to evaluate compliance with current permit conditions prior to re -issuance of a new permit. Met with Andy Borgstrom, EHS . Manager, who provided the facility's Stormwater Pollution Prevention Plan (SPPP) and monitoring records for review. The SPPP is well -organized, complete and updated per requirements. Documentation associated with employee training, facility inspections, significant spills (none) and non-stormwater evaluations are included with the SPPP. Monitoring records from 2017 through 2020 for the facility's one stormwater discharge outall indicate that there have been no exceedances of the benchmark values associated with the discharge characteristics. Per Mr. Borgstrom, no onsite vehicle maintenance is conducted. After the records review, site observations were made of the facility's ASTs with appropriate secondary containment, material storage areas, stormwater drains/ditches, stormwater retention pond and stormwater discharge outfall. As a reminder, the permit contains second ary.containment requirements for bulk storage of liquid materials (single above ground storage container with capacity of greater than 660 gallons or multiple containers in close proximity with a total combined storage capacity of greater than 1,320 gallons), storage in any amount of Section 313 of Title III of the SARA water priority chemicals, and storage in any amount of hazardous substances. Page 2 of 3 Permit: NCS000233 Owner - Facility: Trinity Manufacturing Co Inc Inspection Date: 11/13/2020 Inspection Type :Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? 0 ❑ ❑ ❑ # Does the Plan include a General Location (USES) map? 0 ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? 0 ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? 0 ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? 0 ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? N ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? E ❑ ❑ ❑ # Does the Plan include a BMP summary? 0 ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? 0 ❑ ❑ ❑ #'Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? 0 ❑ ❑ ❑ # Does the facility provide and document Employee Training? E ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? 0 ❑ ❑ ❑ # Is the Plan reviewed and updated annually? 0 ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan -been implemented? ❑ ❑ ❑ Comment: Qualitative Monitorinq Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? 0 ❑ ❑ ❑ Comment: Analytical Monitorinq Yes No NA NE Has the facility conducted its Analytical monitoring? 0 ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ M ❑ Comment: Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ ❑ ❑ # Were all outfalls observed during the.inspection? ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ E ❑ # Has the facility evaluated all illicit (non stormwater) discharges? 0 ❑ ❑ ❑ Comment: Page 3 of 3