Loading...
HomeMy WebLinkAbout20201370 Ver 1_Buffer Approval Letter_20201118 DocuSign Envelope ID:373F3614-9040-4199-BF70-553B2B2DEFOB ROY COOPER Governor ' MICHAEL S. REGAN , Secretary NORTH CAROLIMA S. DANIEL SMITH Etwironme.rttut Quality Director November 18,2020 Johnston County NCDWR Project No.20201370 New Bridge on SR 1341 State Project No.DF16804.2051046 APPROVAL of NEUSE BUFFER AUTHORIZATION with ADDITIONAL CONDITIONS Mr.Kevin Bower,PE,Division Engineer NCDOT Division 4 PO Box 3165 Wilson,NC 27895 Dear Mr.Bower: You have our approval,in accordance with the conditions listed below,for the following impacts for the purpose of replacing a culvert on SR 1341 with a New Bridge in Johnston County: Neuse Riparian Buffer Impacts Site Zone 1 Impact Zone 1 Buffer Mitigation Zone 2 Impact Zone 2 Buffer Mitigation (sq ft) Required (using 3:1 ratio) (sq ft) Required(using 1.5:1 ratio) Totals 11833 N/A 3823 N/A *n/a=No mitigation required Total Buffer Impact for Project: 15662 square feet. The project shall be constructed in accordance with your application received November 17,2020. This approval is valid for the Neuse Riparian Buffer Rules(15A NCAC 2B.0233). In addition,you should acquire any other federal,state or local permits before you proceed with your project including(but not limited to)Sediment and Erosion Control,Non-Discharge and Water Supply Watershed regulations. This approval is valid solely for the purpose and design described in your application(unless modified below). Should your project change,you must notify the NCDWR and submit a new application. If the property is sold,the new owner must be given a copy of this Certification and approval letter,and is thereby responsible for complying with all the conditions.Additional buffer impacts may require compensatory mitigation as described in 15A NCAC 2B.0233.For this approval to remain valid,you must adhere to the conditions listed below. Conditions of Certification: 1.All stormwater runoff shall be directed as sheetflow through stream buffers at non-erosive velocities,unless otherwise approved by this certification. [15ANCAC 2B.0233] 0-7?) North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 11617 Mail Service Center I Raleigh,North Carolina 27699-1617 919.707.9000 DocuSign Envelope ID:373F3614-9040-4199-BF70-553B2B2DEFOB 2.All riparian buffers impacted by the placement of temporary fill or clearing activities shall be restored to the preconstruction contours and revegetated.Maintained buffers shall be permanently revegetated with non-woody species by the end of the growing season following completion of construction. For the purpose of this condition, maintained buffer areas are defined as areas within the transportation corridor that will be subject to regular NCDOT maintenance activities including mowing.The area with non-maintained buffers shall be permanently revegetated with native woody species before the next growing season following completion of construction. [15ANCAC 2B.0233] 3.Pursuant to 15A NCAC 2B.0233(6)sediment and erosion control devices shall not be placed in Zone 1 of any Neuse Buffer without prior approval by the NCDWR. At this time,the NCDWR has approved no sediment and erosion control devices in Zone 1, outside of the approved project impacts,anywhere on this project. Moreover,sediment and erosion control devices shall be allowed in Zone 2 of the buffers provided that Zone 1 is not compromised and that discharge is released as diffuse flow. 4. Native riparian vegetation(i.e.,trees and shrubs native to your geographic region)must be reestablished in the riparian areas within the construction limits of the project by the end of the growing season following completion of construction. [15A NCAC 02B.0233(10)]. If you wish to contest any statement in the attached Certification you must file a petition for an administrative hearing. You may obtain the petition form from the office of Administrative hearings. You must file the petition with the office of Administrative Hearings within sixty(60)days of receipt of this notice. A petition is considered filed when it is received in the office of Administrative Hearings during normal office hours. The Office of Administrative Hearings accepts filings Monday through Friday between the hours of 8:00am and 5:00pm,except for official state holidays. The original and one(1) copy of the petition must be filed with the Office of Administrative Hearings. The petition may be faxed-provided the original and one copy of the document is received by the Office of Administrative Hearings within five(5)business days following the faxed transmission. The mailing address for the Office of Administrative Hearings is: Office of Administrative Hearings 6714 Mail Service Center Raleigh,NC 27699-6714 Telephone: (919)431-3000,Facsimile: (919)431-3100 A copy of the petition must also be served on DEQ as follows: Mr.Bill F.Lane,General Counsel Department of Environmental Quality 1601 Mail Service Center This letter completes the review of the Division of Water Resources under the Neuse Riparian Buffer Rules. If you have any questions, please contact Rob Ridings at rob.ridings@ncdenr.gov. Sincerely, ,—DocuSigned by: CA/VA.pdketk, S. iei oUoo rector Division of Water Resources Electronic copy only distribution: Eric Alsmeyer,US Army Corps of Engineers,Raleigh Field Office Chad Coggins,Division 4Environmental Officer File Copy 0-7?) North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 11617 Mail Service Center I Raleigh,North Carolina 27699-1617 919.707.9000