Loading...
HomeMy WebLinkAboutNCG510542_Compliance Evaluation Inspection_20170908�i Water Resources ENVIRONMENTAL QUALITY September 7, 2017 Mr. Richard Krejci Director of Operations Southeast Region Plantation Pipe Line Company 1000 Windward Concourse Suite 450 Alpharetta, GA 30005 ROY COOPER Governor MICHAEL S. REGAN Secretary S. JAY ZIMMERMAN Director Subject: Compliance Inspection Report Plantation Pipe Line Permit#NCG510542 Groundwater Remediation Gastonia, Gaston County Dear Mr. Krejci: On September 7, 2017, the Mooresville Regional Office (MRO) performed a compliance inspection of the Remediation System at the Plantation Pipeline facility located at 2740 S. New Hope Road Gastonia, to determine compliance with remediation activities as per permit #NCG510542. The MRO would like to thank Mr. Mike Seean, Mr. Scott Smida and Mr. Joe Marlowe for their assistance during this site visit. Enclosed is a copy of the site inspection report. The system is online and performing at levels consistent with the active permit for this facility. Laboratory data indicates the system is being effective in the reduction of petroleum constituents. The continued monitoring of the system is recommended. Should you have questions with the site inspection report or the findings listed herein, I may be reached by phone at (704) 663-1699 or email (edward.watson@ncdenr.gov). Sincerely, se �wa�o n Hydrogeologist Mooresville Regional Office Water Quality Regional Operations Section, Division of Water Resources Attachment: Compliance Inspection Report CC: Mike Skeean (via email) Joe Marlowe (via email) WQROS Central Office State of North Carolina [ Environmental Quality I Water Resources I Water Quality Regional Operations Mooresville Regional Office 1 610 East Center Avenue, Suite 3011 Mooresville, North Carolina 28115 704 663 1699 United Stales Environmental Protection Agency Form Approved. EPA Washington, D.C. 20460 OMB No. 2040-0057 Water Compliance Inspection Report Approval expires8-31-98 Section A: National Data System Coding (i.e., PCS) Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type 1 IN I 2 15 1 3 I NCG510542 I11 121 17/09/07 I17 18 LC 19 I G I 20I I I_I_I 211 I I I I I I I I I I 1 U I 1 I I I I I I I I I I I 1 I IIJI I I I I IIJI I I 1_ f6 Inspection Work Days Facility Self -Monitoring Evaluation Rating 81 QA ------------------- Reserved --------- --- 67 1.0 701272 lr731 174 75I I I I 80 J 71 it1 Section B: Facility Data Name and Location of Facility Inspected (For Industrial Users discharging to POND, also include Entry Time/Date Permit Effective Date POTW name and NPDES permit Number) 09: 57AM 17/09/07 16/10/13 Plantation Pipe Line Company 2740 S New Hope Rd Exit Time/Date Permit Expiration Date Gastonia NC 28054 11:40AM 17/09/07 20/09/30 Name(s) of Onsile Representalive(s)/Titles(s)/Phone and Fax Numbers) Other Facility Data Name, Address of Responsible Official/Title/Phone and Fax Number Contacted Greg Dempsey, 1000 Windward Concourse Ste 450 Alpharetta GA 30005/Company Contact7770-751-414377707514130 No Section C: Areas Evaluated During Inspection (Check only those areas evaluated) Permit Flow Measurement Operations 8 Maintenance Records/Reports Facility Site Review Effluent/Receiving Waters Laboratory Other Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Names) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date Edward Watson MRO GW/// J/ F � 13 Zrr Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date W. Corey Basinger MRO WQ//704-235-2194/ EPA Form 3560-3 (Rev 9-94) Previous editions are 4solete. %-:>� �`C At - Page# NPDES yr/mo/day Inspection Type (Cont.) NCG510542 111 121 17/09/07 117 18 ICI Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) On September 7, 2017 Edward Watson of the MRO conducted a compliance evaluation inspection for NPDES permit NGC510542 at the Plantation Pipeline facility in Gastonia, N.C. During the inspection, MRO staff observed the installation of piping for and Air Spargre System that is permitted under W10300342. Photos of the trench and line are in the electronic file. The treatment trailer is equiped with a SCADA system that is connected to the ORC's cell phone. The SCADA system will alert the ORC of system failures. The system will allow the ORC to re -set certain alarms without having to visit the site. The MRO has requested a copy of the spent Activated Carbon Manifests to be submitted via email as part of record keeping and suggests that a copy of the waste manifest be kept on site as part of the regular O&M records. MDS files were also present and available for review. Calibration records for the Flow meter at the effluent discharge were observed to be up to date and the calibration date was clearly marked next to the flow meter. Laboratory records were reviewed. Laboratory records indicate the treatment system is being effective at reducing BTEX and MTBE. There is only one outfall for this facility. During the site visit, the outfall was observed the be free of solids . foam and odors. The MRO also viewed RW-1 well. A note was made to cover the exposed wire observed at the well head. MRO also requested that the other RWs be checked for any exposed wiring and have those wires covered. Overall, the site was found to compliant with the permit. Page# Permit: NCG510542 Owner - Facility: Plantation Pipe Line Company Inspection Date: 09/07/2017 Inspection Type: Compliance Evaluation Permit Yes No NA NE (If the present permit expires in 6 months or less). Has the permittee submitted a new 0 ❑ ❑ ❑ application? Is the facility as described in the permit? 0 ❑ ❑ ❑ # Are there any special conditions for the permit? ❑ 0 ❑ ❑ Is access to the plant site restricted to the general public? 0 ❑ ❑ ❑ Is the inspector granted access to all areas for inspection? 0 ❑ ❑ ❑ Comment: The treatment area is isolated from public access by a gate at the entrance. There is also a fence around the treatment system trailer and the location of the treatment system is fairly remote from public travel. Record Keeping Yes No NA NE Are records kept and maintained as required by the permit? 0 ❑ ❑ ❑ Is all required information readily available, complete and current? 0 ❑ ❑ ❑ Are all records maintained for 3 years (lab. reg. required 5 years)? ❑ ❑ ❑ Are analytical results consistent with data reported on DMRs? ❑ ❑ 0 ❑ Is the chain -of -custody complete? 0 ❑ ❑ ❑ Dates, times and location of sampling Name of individual performing the sampling Results of analysis and calibration Dates of analysis Name of person performing analyses Transported COCs Are DMRs complete: do they include all permit parameters? ❑ ❑ 0 ❑ Has the facility submitted its annual compliance report to users and DWQ? ❑ ❑ 0 ❑ (If the facility is = or > 5 MGD permitted Flow) Do they operate 24/7 with a certified operator ❑ ❑ 0 ❑ on each shift? Is the ORC visitation log available and current? M ❑ ❑ ❑ Is the ORC certified at grade equal to or higher than the facility classification? M ❑ ❑ ❑ Is the backup operator certified at one grade less or greater than the facility classification? ❑ ❑ ❑ Is a copy of the current NPDES permit available on site? 0 ❑ ❑ ❑ Facility has copy of previous year's Annual Report on file for review? ❑ ❑ M ❑ Comment: Please submit information for back-up ORC. Operations Sr Maintenance Yes No NA NE Page# 3 Permit: NCG510542 Owner -Facility: Plantation Pipe Line Company Inspection Date: 09/07/2017 Inspection Type: Compliance Evaluation Operations & Maintenance Yes No NA NE Is the plant generally clean with acceptable housekeeping? 0 ❑ ❑ ❑ Does the facility analyze process control parameters, for ex. MLSS, MCRT, Settleable ❑ ❑ ❑ Solids, pH, DO, Sludge Judge, and other that are applicable? Comment: O&M records were reviewed during the site visit. The records appear to be accurate and up to date. Other Yes No NA NE Comment: Waste manifest for spent Activated Carbon has been requested to be submitted to MRO. Page# 4