Loading...
HomeMy WebLinkAbout20201370 Ver 1_DF16804.2051046_PermitDrawings_BUFFER_20201102_20201117V = =MPH ADT FUNC CLASS = PROJECT LENGTH STATE STATE PROJECT REFERENCE NO. STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION NO. TOTAL SHEETS N.C. SHEET 1 SIGNATURE: SIGNATURE: P.E. P.E. GRAPHIC SCALES HYDRAULICS ENGINEER LOCATION: TYPE OF WORK:09/08/99DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA 10/28/2020...\DF16804.2051046_hyd_prm_buf_tsh.dgnUSER:MHarveyARTMEN N ASO H DEPT O F TRA SPORTTIONTATEOFNRTCAR O LI NAPROJECT ENGINEER PROJECT DESIGN ENGINEER EDWARD G, WETHERILL, PE GREG S. PURVIS, PE ENGINEER ROADWAY DESIGN LETTING DATE: 45 0.095 MILES 0.013 MILES 0.082 MILES GRADING, DRAINAGE, PAVING & STRUCTURE THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES. 2020 DESIGN DATA 0 0 0 PROFILE (HORIZONTAL) PLANS PROFILE (VERTICAL) 0 00 50 25 50 50 25 50 10 5 10 20 ENGINEERING ETHERILLW Raleigh, N.C. 27606 Bus: 919 851 8077 Fax: 919 851 8107 CIVIL/SITE DESIGN - GIS/GPS - CONSTRUCTION OBSERVATION TRANSPORTATION PLANNING/DESIGN - BRIDGE/STRUCTURE DESIGN 1223 Jones Franklin Rd. License No. F-0377 UNLESS ALL SIGNATURES COMPLETED DOCUMENT NOT CONSIDERED FINAL See Sheet 1B For Conventional Symbols 2018 STANDARD SPECIFICATIONS PROJECT ENGINEER - NCDOT DIVISION 4 100 100 4 PE NCDOT CONTACT: RIGHT OF WAY DATE: RURAL LOCAL SUBREGIONAL TIER JOHNSTON COUNTY REPLACE CULVERT OVER ARTERS BRANCH NA 2011NAD 83/CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD III. ROW, UTIL. CONST. See Sheet 1A For Index of Sheets See Sheet RW01 TO RW04 For Survey Control Sheets CONTRACT: PROJECT: DF16804.2051046DF16804.2051046 DF16804.2051046 DF16804.2051046 .541162 1343 1340 1342 1343 1341 1341 1343 1376 1341 1374 1375 1345 1347 1343 1162 1343 1386 1342 1347 1340 1341 QuailRd.LakeviewDr.Packing PlantNorthJohnsonRd.Club Rd .GalileeRd.GalileeRd.Rd.Rd.Galil eeGalil eeBlack CreekRd.Bla c k Cr e e kRd. Plant Pack ing Rd.Packi ngPl ant Rd. S wa mp NEUSE School Elementary West Smithfield Church Hopewell Transportation301 96 210 1341 VICINITY MAP OFF-SITE DETOUR PROJECT SITE Prepared for: DIVISION OF HIGHWAYS DIVISION FOUR 509 Ward Boulevard, Wilson NC, 27895 JAKE GREEN, PE, PLS TOTAL LENGTH PROJECT DF16804.2051046 = LENGTH STRUCTURE PROJECT DF16804.2051046 = LENGTH ROADWAY PROJECT DF16804.2051046 = ON SR 1341 (GALILEE ROAD)ARTERS BRANCH3,500 PRELIMINARY PLANS DF16804.2051046 (NORTH JOHNSTON RD) SR 1342 US 301/NC 96(GALILEE RD) SR 1341 -L- (GALI LEE RD) SR 1 3 4 1 -L- PROJECT DF16804.2051046 BEGIN NCDOT -L- POC STA. 15+55.00 END NCDOT PROJECT DF16804.2051046 -L- POC STA. 20+55.00 BEGIN BRIDGE -L- STA. 17+96.99 END BRIDGE -L- STA. 18+67.01 BUFFER IMPACTS PERMIT SHEET 1 OF 3 BUFFER DRAWING SITE 1 WELLONS-FETZER, LLC 36" 2SBW 36" 2SBW 3 6" 2 S BW3 6" 2 S BW3 6" 2 SBWSILT 48"WW W/1SBW48"M TL W/ W W 48"MTLSILT SILTDEBRIS AREA RIPRAP & RIPRAPWRACK LINEWRACK LI NEP OSTWD(X2) ANCHORS STEEL (X4) ANCHORS STEEL WOODS WOODS WOODS WOODS WOODS SILT 36" 2SBWW/ 1SBW48"WW N 5339’02" E567.46’POST WD EXISTING R/W EXISTING R/W 60.00’TEXI STI NG R/W60.00’130.8’ 130.8’ 130.3’ 130.2’ 130.7’ 133.6’ 133.6’ 133.6’ 133.6’ CULTIVATED FIELD RIP RAP ON TREE WRACK LINE ON TREE WRACK LINE ON TREE WRACK LINE SR 1342 (NORTH JOHNSTON RD) 22’ PAVED ROADWAY SR 1341 (GALILEE RD) CULTIVATED FIELD WELLONS-FETZER, LLC ANITA POWELL WELLONS-FETZER, LLC WELLONS-FETZER, LLC 22’ PAVED ROADWAYSR 1341 (GALI LEE RD) US 301/NC 96EXI STI NG R/WCULTIVATED FIELD CP P 18" H/W MTL158"x105" CMAPDAMAGED MTL H/W ARTERS BRANCHA R T E R S B R A N C H FOR STRUCTURE PLANS SEE SHEETS S-1 THRU S-?? & BRIDGE/PAVT. SKETCH -DWY- ALIGNMENT, SEE SHEET 2A-2 FOR CURVE DATA, ROW STATION/OFFSETS SEE SHEET 2A-3 FOR tTHE GRAPHIC SCALE 0’100’100’ ALLOWABLE IMPACTS ZONE 1 ALLOWABLE IMPACTS ZONE 2 BUFFER IMPACTS PERMIT SHEET 2 OF 3 BUFFER DRAWING15+0020+0025+00-L- -L- **************************************** RR SPIKE AT BASE OF 44" HACKBERRY TREE BL STATION 13+16.9, 162.2’ RIGHT N 632,162.2 E 2,184,631.3 BM#1 ELEVATION = 132.81’ **************************************** **************************************** RR SPIKE AT BASE OF 17" WATER OAK TREE BL STATION 16+48.7, 137.6 LEFTN 632,230.2 E 2,185,109.7BM#2 ELEVATION = 128.24’**************************************** GPS-2 BL-3 BL- 4EOI 5 0 PR 50 PR 50 PR 16 " D IP 16" DIP SS BM#1 BM#2 ALL LINEAR DIMENSIONS ARE LOCALIZED HORIZONTAL DISTANCES NC GRID NAD 83 NA 2011 16" DI 24.32 RT 17+45.56 Elv. 125.53 TH 1 16" DI 28.95 RT 17+94.50 Elv. 124.04 TH 2 16" DI 28.60 RT 18+72.54 Elv. 126.70 TH 3 16" DI 19.33 RT 19+59.24 Elv. 131.61 TH 4 2" FO35.12 RT20+84.36El v. 143.44TH 52" FO 19.58 RT 17+45.72 Elv. 125.79 TH 6 NOT FOUND 15.00 RT 17+93.88 Elv. 0.00 TH 7 NOT FOUND 20.36 RT 18+72.32 Elv. 0.00 TH 8 NOT FOUND 30.71 RT 19+37.96 Elv. 0.00 TH 9 PI = 16+90.00 EL = 130.03’ (-)1.3100%(+)2.5033% VC = 188’ PI = 19+35.00 EL = 136.16’ (+)2.5033%(+)5.1500% VC = 131’EL. 131.80STA. 15+55.00BEGIN GRADEEL. 142.34STA. 20+55.00END GRADETIER GUIDELINES SUBREGIONAL NOTE: MEETS DS = 35 MPH K = 49 TIER GUIDELINES SUBREGIONAL NOTE: MEETS DS = 35 MPH K = 49 STA. 18+68.14END BRIDGESTA. 17+95.86BEGIN BRIDGEGROUND EXIST. GRADE PROP. (-)1.8100% EX.GRADE (+)5.6500%EX. GRADE =-L- STA. 16+06.64-DWY- STA. 10+00.00= 560 = 125.4 = 126.3 = 130.9 = 10/12/20 = 122.0 = 2685 DESIGN DISCHARGE DESIGN FREQUENCY BASE DISCHARGE CFS YRS YRS BASE FREQUENCY OVERTOPPING ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGE CFS CFS YRS FT FT FT DESIGN HW ELEVATION BASE HW ELEVATION DATE OF SURVEY W.S. ELEVATION AT DATE OF SURVEY FT = 25 = 100 BRIDGE HYDRAULIC DATA = 770 = 500+ CMPA WITH HEADWALLS EXISTING 1@158"’ x 105" CENTERLINE = 119.50 INVERT AT PROPOSED CHANNEL (10-12-20) ELEV. = 122.0 ON DATE OF SURVEY WATER SURFACE NWS ELEV. = 122.51.5:1CHORD LOWEST ELEV. 125.0 EXCAVATE TO (2 FT. THICK) W/ GEOTEXTILE CLASS II RIP RAP (2 FT. THICK) W/ GEOTEXTILE CLASS II RIP RAP TOP OF BERM UNDER BRIDGE (TYP.) ADD 0.5’ OF TOP SOIL TO ELEV. 127.0 EXCAVATE TO1.5:11.5:11.5:1NO DECK DRAINS REQUIRED W/ 4’0" CAPS 1@70’ - 24" CORED SLAB C ELEV. = 133.58 SKEW = 90 STA. 18+32.00 -L-0L 1300 CY (+/-) EXCAVATION = TOTAL APPROXIMATE C C C F C C F C C C C F C F C CC C F C C C C F C FF1 1 1 2 1 ENGINEERING ETHERILLW DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED CIVIL/SITE DESIGN - GIS/GPS - CONSTRUCTION OBSERVATION TRANSPORTATION PLANNING/DESIGN - BRIDGE/STRUCTURE DESIGN Fax: 919 851 8107 Bus: 919 851 8077 Liscense No. F-0377 Raleigh, N.C. 27606 1223 Jones Franklin Rd.SHEET NO.PROJECT REFERENCE NO. HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER 4 R/W SHEET NO.8/17/9910/29/2020P:\2020\20137.01_Galilee Road Div 4\Hydraulics\PERMITS_Environmental\Drawings\DF16804.2051046_hyd_prm_buf_psh.dgnMHarveyREVISIONSDF16804.2051046 12 13 14 15 16 17 18 19 20 21 22 23 24 25 80 90 100 110 120 130 140 150 160 170 80 90 100 110 120 130 140 150 160 170 26 SITE 1 (-)0.84% (-)2.06% (+)8.82% (+)7.00% ELEV.=123.50 FT -L- 18+18 (LT) END DITCH ELEV.=127.17 FT -L- 17+25 (RT) END DITCH ELEV.=127.77 FT -L- 18+64 (LT) BEGIN DITCH ELEV.=137.71 FT -L- 20+05 (LT) END DITCH ELEV.=133.91 FT -L- 19+50 (RT) END DITCH ELEV.=129.50 FT -L- 19+00 (RT) BEGIN DITCH RIGHT DITCH LEFT DITCH ELEV.=128.92 FT -L- 15+55 (LT) BEGIN DITCH ELEV.=128.18 FT -L- 16+05 (RT) BEGIN DITCH (TYP.) TO SHOULDER PT. CLASS II RIP RAP CULVERT REMOVE EXISTING (TYP.) TO SHOULDER PT. CLASS II RIP RAP SEE DETAIL E BANK STABILIZATION MCF SEE DETAIL B TAIL DITCH 0402 +41SBGBEGIN15" 0401 SEE DETAIL A SPECIAL CUT DITCH 3:13:1D ( Not to Scale) d TAIL DITCH CLASS B RIP RAP = 18 TONS, GEOTEXTILE = 37 SY LENGTH = 52 FT, SLOPE = 4.17% FROM -L- STA. 17+25 TO STA. 17+78 RT. Type of Liner= Class B Rip-Rap Max. d = 1 Ft. Min. D = 1 Ft. DETAIL B Ground Natural Ground Natural Geotextile DETAIL E FROM -L- STA. 17+30 TO 17+99 FROM -L- STA. 18+19 TO 19+09 BANK STABILIZATION 2.0’(MIN.)(MAINTAIN 20’ WIDTH THROUGH THE BRIDGE OPENING) CHANNEL WIDTH VARIES 15’ TO 20’ BED CHANNEL EXISTING NOT TO SCALE GROUND NATURAL W/ GEOTEXTILE (TYP.) ALONG EXISTING BANK CLASS ’II’ RIP RAP TO FORM NEW CHANNEL USE SLOPES 2:1 OR FLATTER GEOTEXTILE = 405 SY EST. 400 TONS OF CLASS II RIP RAP SEE DETAIL C AND GEOTEXTILE B RIP RAP W/ CLASS CUT DITCH SPECIAL SEE DETAIL D AND GEOTEXTILE W/ CLASS B RIP RAP CUT DITCH 3:1D Flatter4:1 or d ( Not to Scale) CUT DITCH 61 TONS CLASS B 82 SY GEOTEXTILE FROM -L- STA. 19+50 TO STA. 20+55 RT. Slope Ditch Front DETAIL D Max. d = 1 Ft. Min. D = 1 Ft. Type of Liner= Class B Rip-Rap Ground Natural Geotextile SEE DETAIL C AND GEOTEXTILE W/ CLASS B RIP RAP SPECIAL CUT DITCH Flatter3:1 or D 3:1( Not to Scale) SPECIAL CUT DITCH FROM -L- STA. 16+05 TO STA. 17+25 RT. FROM -L- STA. 15+55 TO STA. 18+18 LT. DETAIL A Min. D = 1 Ft. Ground Natural Slope Ditch Front 3: 1 D Flatter4:1 or d ( Not to Scale) SPECIAL CUT DITCH 29 TONS CLASS B 39 SY GEOTEXTILE FROM -L- STA. 19+00 TO STA. 19+50 RT. 49 TONS CLASS B 103 SY GEOTEXTILE FROM -L- STA. 18+64 TO STA. 20+05 LT. DETAIL C Max. d = 1 Ft. Min. D = 1 Ft. Type of Liner= Class B Rip-Rap Slope Ditch Front Ground Natural Geotextile SEE DETAIL A SPECIAL CUT DITCH ( Not to Scale) Geotextile Elevation Natural Bed 38 TONS CLASS B 80 SY GEOTEXTILE FROM -L- STA. 18+26 TO STA. 19+00 RT. 15 TONS CLASS B 32 SY GEOTEXTILE FROM -L- STA. 17+25 TO STA. 18+13 RT. Ground Natural Ground Natural (Variable) Channel Bed EXISTING CHANNEL STABILIZATION DETAIL F 1’ Type of Liner= Class B Rip-Rap - Keyed-In SEE DETAIL E STABILIZATION EXISTING CHANNEL Site Station StructureNo. (From/To) Size / Type1 -L- 17+32 - 18+20 Lt Prestressed Cored Slab BridgeX 4793 2263 70561 -L- 17+88 - 19+27 Lt Prestressed Cored Slab BridgeX 6410 1086 74961 -L- 17+50 - 18+24 Rt Prestressed Cored Slab BridgeX 630 341 9711 -L- 18+88 - 19+13 Lt Prestressed Cored Slab BridgeX 139 13911833 3829 1566200000NOTES:Revised 2018 Feb SHEET 4OF4BUFFER REPLACEMENTIMPACTSRIPARIAN BUFFER IMPACTS SUMMARYNC DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYSTOTALS*:ROAD CROSSINGBRIDGEPARALLEL IMPACTZONE 1(ft2)ZONE 2(ft2)TYPEJOHNSTON COUNTYDF16804.2051046ALLOWABLE MITIGABLE10/30/2020ZONE 2(ft2)ZONE 1(ft2)TOTAL(ft2)ZONE 2(ft2)ZONE 1(ft2)TOTAL(ft2)