Loading...
HomeMy WebLinkAbout20100480 Ver 1_Application_20100618o?oFwarFgoG Office Use Only: t t ' c 1004 Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Pre-Construction Notification (PCN) Form A. Applicant Information 1. Processing 1a. Type(s) of approval sought from the Corps: ®Section 404 Permit E) Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: 13 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ® Yes ? No 1d. Type(s) of approval sought from the DWQ (check all that apply): ® 401 Water Quality Certification - Regular ? Non404 Jurisdictional General Permit ? 401 Water Quality Certification - Express ? Riparian Buffer Authorization le. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ® Yes ? No For the record only for Corps Permit: ® Yes ? No If. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. ? Yes ® No tg. Is the project located in any of NC's twenty coastal counties. If yes, answer 1h below., ? Yes ®: No 1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ? Yes ®,No, 2. • Project Information i;A.: r. erso 2a. Name'of'project: Maintenance activity at pipe structure conveying Rocky Branch' . 2b. County: Wake 2c. Nearest municipality / town: Apex 2d. Subdivision name: - ' - c afie, 2e. NCDOT only, T.I.P. or state project no: U ' ' 4v" i, ^ .. 3. Owner Information 8 :201'0: 3a. Name(s) on Recorded Deed: NCDOT•lyq 3b. Deed Book and Page No. AlEgg? 3c. Responsible Party (for LLC if applicable): , 3d. Street address: 3e. City, state, zip: 3f. Telephone no.: 3g. Fax no.: 3h. Email address: Page I of 10 PCN Form -Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner)' :t,- S i 4a. Applicant is, ? Agent ? Other, specify: 4b. Name: 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: 5b. Business name (if applicable): 5c. Street address: 5d. City, state, zip: 5e. Telephone no.: 5f. Fax no.: 5g. Email address: ;y . C Page 2 of 10 PCN Form - Version 1.3 December 10, 2008 Version B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): N/A 1b. Site coordinates (in decimal degrees): Latitude: 35.66353 Longitude: - 78.78414 (DD.DDDDDD) (-DD.DDDDDD) 1c. Property size: 0.1 acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to proposed project: Rocky Branch 2b. Water Quality Classification of nearest receiving water: C; NSW 2c. River basin: Neuse 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Wooded land. 3b. List the total estimated acreage of all existing wetlands on the 0.1 property: 3c. List the total estimated linear feet of all existing streams (interm 30 ft ittent and perennial) on the property: 3d. Explain the purpose of the proposed project: Stabilize fill slope. 3e. Describe the overall project in detail, including the type of equipment to be used: ^':• Stabilize fill slope with Class I or Class II rip rap. 4. Jurisdictional Determinations c:::-i ';;•> •: 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? Comments: ? Yes ® No ? Unknowr' 4b. If the Corps made the jurisdictional determination, what type of determination was made? ? Preliminary ? Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. . 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ? Yes ® No ? Unknown '. 51b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ? Yes ® No 6b. If yes, explain. Page 3 of 10 PCN Form - Version 1.3 December 10, 2008 Version f C. Proposed Impacts Inventory 1. Impacts Summary la. Which sections were completed below for your project (check all that apply): ® Wetlands ® Streams - tributaries ? Buffers ? Open Waters ? Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number - Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ - non404, other) (acres) Temporary T W1 ? P ? T ? Yes ? Corps ? No ? DWQ W2 ? P ? T ? Yes ? Corps ? No ? DWQ W3 ? P ? T ? Yes ? Corps ? No ? DWQ W4 ? P ? T ? Yes ? Corps ? No ? DWQ W5 ? P ? T ? Yes ? Corps ? No ? DWQ W6 ? P ? T ? Yes ? Corps ? No ? DWQ 2g. Total wetland impacts - . . • •; n: . 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the:site, then complete this question for all stream sites impacted.,- .,, - . 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction, Average. Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ - non-404, width. , (linear Temporary (T) (INT)? other) (feet) feet) S1 ®P ? T Rock Plate Rocky Branch ® PER ? INT ® Corps ® DWQ 20 ft 30 ft S2 ? P ? T ? PER ? Corps ? INT ? DWQ S3 ? P ? T ? PER ? Corps ? INT ? DWQ S4 ? P ? T ? PER ? Corps ? INT ? DWQ S5 ? P ? T ? PER ? Corps ? INT ? DWQ S6 ? P ? T ? PER ? Corps ? INT ? DWQ 3h. Total stream and tributary impacts • 30 fl 3i. Comments: Constuction will involve stabilization of washed fill slope. The fill slope will be capped with Class I or Class II rip rap. Page 4 of 10 PCN Form - Version 1.3 December 10, 2008 Version it 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number- (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary T 01 ?P?T 02 ?P?T 03 ?P?T 04 ?P?T 4f. Total open water impacts 0.0 4g. Comments: 5. Pond or Lake Construction If and or lake construction proposed, then complete the chart below. 5a. 5b. 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f. Total 5g. Comments: 5h. Is a dam high hazard permit required? ? Yes ? No If yes, permit ID no:' 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If an impacts require mitigation, then you MUST fill out Section D of this form. 6a ? Neuse . ?Tar-Pamlico ? Other: Project is in which protected basin? ? Catawba ? Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number - Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary T impact required? s B1 ®P ? T Stabilize Rocky Branch ® No 300 sf ?Yes B2 ?P?T ? No B3 ?P?T ?Yes ? No 6h. Total buffer impacts 300 sf 6i. Comments: Buffer impact is only for work area to stabilize fill slope. Page 5 of 10 PCN Form - Version 1.3 December 10, 2008 Version i. D. Impact Justification and Mitigation 1. Avoidance and Minimization la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Impacts to stream and wetland are necessary to stabilize fill slope. No additional impacts are anticipated. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. All efforts will be made during construction to minimize impacts. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ? Yes ®No 2b. If yes, mitigation is required by (check all that apply): ? DWQ ? Corps 2c. If yes, which mitigation option will be used for this project? pro ? Mitigation bank El. Payment to in-lieu fee program ? Permittee Responsible Mitigation 3. Complete if-Using a Mitigation Bank 3a. Name'of Mitigation Bank: 31b. Credits,Purchiased (attach receipt and letter) Quantity 3c. 'Comments: " 4. 'Complete if Making a Payment to In-lieu Fee Program 4a.''ApprovaHetterfrom in-lieu fee program is attached. ' ? Yes u..y, •-, . ; _ •'4b "Stream mitigation 'requested: linear feet x ? 2 46'1f usmg'stream mitigation, stream temperature ` ?'war' n ?'cool ?cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal'(tidal) wetland mitigation requested: acres "4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using,a,permittee responsible mitigation plan, provide a description of the proposed mitigation plan. , ., Page 6 of 10 PCN Form - Version 1.3 December 10, 2008 Version I . n• ""P a 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ? Yes Z No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments: Page 7 of 10 PCN Form - Version 1.3 December 10, 2008 Version t E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified ® Yes ? No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. ? Yes ®No Comments: Project serves to stabilize damaged fill slope. 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 0% 2b. Does this project require a Stormwater Management Plan? ? Yes ®No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: Impacts are only to stabilize fill slope. 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, na rrative description of the plan: Construction of this project WILL NOT add any additional impervioius surface at the project. ? Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ® DWQ Stormwater Program ? DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? N/A' ' :• ? Phase Il 3b Which of the following locally-implemented'stormwater management programs ?NSW. apply(check'all that apply): ? USMP ., ? Water Supply Watershed ? Other':' 36 Has the approved Stormwater Management Plan with proof of approval been ? Yes" ` ?. No. attached? 4. DWQ Stormwater Program Review ? Coastal counties .. ? HOW' 4a . 'Which of the following-state-implemented stormwater management programs apply ? ORW (check'all that apply): ? Session Law2006-246 ? Other: 4b ..Has the approved Stormwater Management Plan with proof of approval been attached? ? Yes ? No 5. DWQ 401 Unit Stormwater Review 5a . Does the Stormwater Management Plan meet the appropriate requirements? ? Yes ? No 5b . Have all of the 401 Unit submittal requirements been met? ? Yes ? No Page 8 of 10 PCN Form - Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) la. Does the project involve an expenditure of public (federal/state/local) funds or the ® Yes ? No use of public (federal/stale) land? 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ? Yes ® No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) ? Yes ? No Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Welland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ? Yes ® No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after-the-fact permit application? ? Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): -.. .::;.. i . 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in i l ? El Yes _ No . additional development, wh ch cou d impact nearby downstream water quality 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the.,, most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) ... = ' ' ' 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discha rge) of.wastewater generated from the proposed project, or available capacity of the subject facility. Project will not generate sewage disposal. ... Page 9 of 10 PCN Form - Version 1.3 December 10, 2008 Version L'r' 1(, 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ? Yes N No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ? Yes N No impacts? El Raleigh 5c. If yes, indicate the USFWS Field Office you have contacted. ? Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? Consultation with PDEA-NEU mussel biologists. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ? Yes N No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? • . .. , Available mapping. 7. Historic or Prehistoric Cultural Resources (Corps Requirement) ' . ••. . 7a: Will this project occur in or near an area that tFe state, federal or tribal `,' governments have designated as having historic or cultural preservation ? Yes N No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 71b. What data sources: did you use to determine'whether your site would impact historic or archeological, resources? :,. Impacts are only to stabilize existing fill slope: No additional impacts at site. 8. Flood Zone Designation (Corps Requirement) 8a. :W illlthis project occur in a FEMA-designated 100-year floodplain? ? Yes N•No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? Avaiable mapping. J. W. Bowman, PE 6/18/10 Applicant/Agent's Printed Name Applicant/Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 10 of 10 PCN Form - Version 1.3 December 10, 2008 Version t ? L?1? _ CsS? o? Fill slope (26 l,neor Feet) /?Ovr weilc.na a(e u -ILL 4t?1, rb "?uP Q(fE? ? Wade( I -LI 5?4E_2 T SR 1390 LJG{2_ ?a ark r 3 •` • . ` ~ ' uss \ 7 Mantenance activity at pipe structure conveying Rocky 1 3 0 C 'r • • ? fx=a I in Wake ounty Branch along SR 1 9 Apex USGS Topographic Map (1974 1988) 1 1,i? °• // r s 1 ?? ?;J, }.' ' ?.? , , ? Lat 356635269 Lorna 78 7841446 ?( \ Figure 1 cale 1 24,000 Protect Site II ?. Cem 389 - II % - I\ jj u r Su set o La ke ` ?rl '1 ?+ ?? - r -