Loading...
HomeMy WebLinkAbout20100444 Ver 1_Approval Letter_201006244 NCDM North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary June 24, 2010 Town of Clayton Attn: Mr. Steve Biggs 111 East Second Street Clayton, N 27520 Subject Property: Clayton Community Park, Clayton, NC Neuse River [030402, 27-(38.5), WSIV, NSW] DWQ Project # 2010-0444 County: Johnston AUTHORIZATION of Neuse River Buffer Rule (15A NCAC 02B.0233) Authorization Certificate Dear Mr. Biggs: You have our authorization, in accordance with 15A NCAC 02B .0233 and any conditions listed below, to impact approximately 3,726 ft2 of Zone 1 and 3,323 ftZ of Zone 2 of the protected riparian buffers for the purpose of constructing the greenway trail and sanitary sewer line at the subject property as described within your application dated May 21, 2010, received by the Division of Water Quality (DWQ) on June 7, 2010. In addition, you should obtain or otherwise comply with any other required federal, state or local permits before you go ahead with your project including (but not limited to) Erosion and Sediment Control, Non-discharge regulations. This authorization certification is for the purpose and design that you described in your application. If you change your project, you must notify us and you may be required to send us a new application. If the property is sold, the new owner must be given a copy of this authorization letter and is thereby responsible for complying with all conditions. This authorization requires you to follow the conditions listed below. The Additional Conditions of the Certification are: 1. Impacts Approved The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are approved including incidental impacts: Amount Approved nits Plan Location or Reference Zone 1 Buffers 3,726 (square ft. Application Zone 2 Buffers 3,323 (square ft.) Application 2. Erosion & Sediment Control Practices Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: 4010versight/Express Review Permitting Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 Location: 2321 Crabtree Blvd., Raleigh, North Carolina 27604 Phone: 919-733-17861 FAX: 919-733-6893 Internet: hfp://portal.ncdenr,org/web/wgtws NorthCarolina aturallry An Equal Opportunity 1 Affirmative Action Employer Town of Clayton Page 2 of 4 June 24, 2010 a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. d. The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. 3. No Waste, Spoil, Solids, or Fill of Any Kind No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre-Construction Notification. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. 4. No Sediment & Erosion Control Measures w/n Wetlands or Waters Sediment and erosion control measures shall not be placed in wetlands or waters without prior approval by the Division. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, design and placement of temporary erosion control measures shall not be conducted in a manner that may result in dis-equilibrium of wetlands or stream beds or banks, adjacent to or upstream and down stream of the above structures. All sediment and erosion control devices shall be removed and the natural grade restored within two (2) months of the date that the Division of Land Resources or locally delegated program has released the project. 5. Diffuse Flow An additional condition is that all stormwater shall be directed as diffuse flow at non-erosive velocities through the protected stream buffers and will not re-concentrate before discharging into the 4!1eaw as identifiud v iAhin 15A NCAC 2B . 0233. 6. Protective Fencing The outside buffer, wetland or water boundary and along the construction corridor within these boundaries approved under this authorization shall be clearly marked with orange warning fencing (or similar high visibility material) for the areas that have been approved to infringe within the buffer, wetland or water prior to any land disturbing activities to ensure compliance with 15A NCAC 2B . 0233. 7. Buffer Mitigation (Lane Island Mitigation Bank) You are required to mitigate for impacts to the protected riparian buffers. The required area of mitigation to compensate for 2,206 square feet of parallel impacts to Zone 1 of the riparian buffer is 6,618, square feet as required by 15A NCAC 2B .0233. We understand you wish to make a payment into the Lane Island Riparian Buffer Mitigation Bank administered by Restoration Systems, LLC to meet this mitigation requirement. This has been determined by the DWQ to be a suitable method to meet the mitigation requirement. This contribution will satisfy our compensatory mitigation requirements in accordance with 15A NCAC 2B .0233(9)(C). Until Restoration Systems, LLC receives and clears your check, no impacts specified in this buffer authorization shall occur. Restoration Systems should be contacted at (919) 334-9118 if you have Town of Clayton Page 3 of 4 June 24, 2010 any questions concerning payment. For accounting purposes, this buffer authorization authorizes payment into the Lane Island Riparian Buffer Mitigation Bank to compensate for 6,618 ftz of required riparian buffer mitigation for impacts to 2,206 W of protected riparian buffers; 03020201, 03-04-02, 27-(38.5) HUC, river and subbasin. 8. Certificate of Completion Upon completion of all work approved within this authorization, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401 Oversight/Express Review Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. 9. Deed Notifications Deed notifications or similar mechanisms shall be placed on all retained jurisdictional wetlands, waters and protective buffers in order to assure compliance for future wetland, water and buffer impact. These mechanisms shall be put in place at the time of recording of the property, or of individual lots, whichever is appropriate. A sample deed notification can be downloaded from the 401/Wetlands Unit web site at: http://h2o.enr.state.nc.us/ncwetlands. The text of the sample deed notification may be modified as appropriate to suit to this project. Any disputes over determinations regarding this Authorization (associated with the approved buffer impacts) shall be referred in writing to the Director within thirty (30) days of receipt of this notice for a decision. You can contest the Director's decision as provided in Articles 3 and 4 of G.S. 15013. To contest the Director's decision you must file a petition for an administrative hearing. You may obtain the petition form from the office of Administrative hearings. You must file the petition with the office of Administrative Hearings within sixty (60) days of receipt of this notice. A petition is considered filed when it is received in the office of Administrative Hearings during normal office hours. The Office of Administrative Hearings accepts filings Monday through Friday between the hours of 8:00am and 5:00pm, except for official state holidays. The original and one (1) copy of the petition must be filed with the Office of Administrative Hearings. The petition may be faxed-provided the original and one copy of the document is received by the Office u huministrativc Fl:uiings within fivc ;5) business du3,° f^11owing the fax-l transmissior. The mailing address for the Office of Administrative Hearings is: Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699-6714 Telephone: (919)-733-2698, Facsimile: (919)-733-3478 A copy of the petition must also be served on DENR as follows: Ms. Mary Penny Thompson, General Counsel Department of Environment and Natural Resources 1601 Mail Service Center Raleigh, NC 27699-1601 This Authorization shall expire five (5) years from the date of this letter. This letter completes the review of the "No Practical Alternatives" determination under 15A NCAC 213 .0233. If you have any questions or would like a copy of the buffer rules, please call Amy Chapman or Town of Clayton Page 4 of 4 June 24, 2010 Ian McMillan at (919) 733-1786. This letter does not authorize any impacts to either Waters of the United States or Waters of the State. Please contact the US Army Corps of Engineers (USACE) or NC Division of Water Quality (DWQ) if any impacts are proposed to either of these waters. Si erely Coleen H. Sullins CHS/ijm/asc Enclosures: Certificate of Completion cc: Lauren Witherspoon, DWQ Raleigh Regional Office DLR Raleigh Regional Office File Copy Filename: 20100444C1aytonCommunityPark(Johnston)NBR