Loading...
HomeMy WebLinkAbout20081832 Ver 1_Emails_20100625Lucas, Annette From: Lucas, Annette Sent: Friday, June 25, 2010 11:12 AM To: 'Levitas, Steve'; 'Gary J. McCabe' Cc: Mcmillan, Ian; 'BMenard@ncdoj.gov'; 'susan.locklear@raleighnc.gov' Subject: RE: SE 40 Attachments: image001.jpg Steve and Gary, Sheet CS-B of the submittal that DWQ received on May 17, 2010 shows that there are two discharge points for Lot 9 that discharge into a sediment and erosion control device. The sheet shows the sediment and erosion control device being placed in the existing ephemeral channel (and thus removing it). Therefore, if the design on this sheet has been implemented already, then the existing channel has been removed - also removing the exemption for the existing stormwater ditch. If the design on the sheet has not been implemented already, and the sediment control device can be reconfigured such that it does riot impact the existing channel, then I will need to see more detail before I can approve the exemption. If this is the case„ then please provide a plan detail of the outlet structures with a depiction of the drainage area of each outlet point at a 1" = 30' scale or larger (please also include contour lines, existing and proposed impervious surfaces, strearn, buffer and wetland features, etc.). Sheet CB-5 refers to the construction phase of the project and I will need to see the final proposal. In addition, the calculations submitted seem to apply to only one discharge point, which does not seem to match the information on the plan sheet. I am going to field verify the plan you submit prior to approval. Please let me know if you have any questions. Thanks, Annette Annette Lucas, PE NC Division of Water Quality - 401 Oversight/Express Unit 2321 Crabtree Boulevard, Suite 250 Raleigh, North Carolina 27604 Phone: (919) 715-3425 Fax: (919) 733-6893 Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Levitas, Steve [mailto:SLevitas@kilpatrickstockton.com] Sent: Thursday, June 24, 2010 7:26 AM To: Lucas, Annette Subject: SE 40 Annette -- I am attaching calculations from Gary McCabe showing that the runoff from Lot 9 development enters the buffer via the pre-existing conveyance at non-erosive velocity. Is that what you are looking for? If not, please let me know what additional information you require. Thanks. Steve 0 Steven J. Levitas Kilpatrick Stockton LLP Suite 400 3737 Glenwood Avenue Raleigh, NC 27612 t 919 420 1707 f 919 510 6145 "'DISCLAIMER"' Per Treasury Department Circular 230: Any U.S. federal tax advice contained in this communication (including any attachments) is not intended or written to be used, and cannot be used, for the purpose of (i) avoiding penalties under the Internal Revenue Code or (ii) promoting, marketing or recommending to another party any transaction or matter addressed herein.