HomeMy WebLinkAbout19990658 Ver 2_More Info Received_20070405l ~`~`~ 0 (o ~`~b'
~.:~~
NCDENR ,~~,~
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Michael F. Easley, Governor Charles S. Jones, Director William G. Ross Jr., Secretary
January 5, 200?
MEMORANDUM:.
TO: Linda Lewis
Noel Lutheran
Division of Water duality
FROM
SUBJECT:
Applicant:
Project Location:
Doug Huggett
Major Permits Processing Coordinator
CAMA/DREDGE & FILL Permit Application Review
Snug Harbor Partners, LLC
Carteret County: Adj. to Nelson Bay & Salter's Creek on the south side of
Hwy 70, Stacy, NC.
Proposed Project: The applicants proposes to revise and expand the original subdivision /marina
development authorized under CAMA Major Permit # 128-00.
Please indicate below your agency's position or viewpoint on the proposed project and return this form by
January 26, 2007. If you have any questions regarding the proposed project, please contact Tere Barrett
at (252) 808-2808. When appropriate, in-depth comments with supporting data are requested.
REPLY: ~ This agency has no objection to the project as proposed
This agency has no comment on the proposed project.
~rp~G~CY ISS~~~
~l3o~a~ ~5
This agency approves of the project only if the recommended changes are
incorporated. See attached.
This ency objects to the project for reasons described in the attached comments.
SIGNED ATE 'J ~ 3 ~ ~a ~
400 Commerce Avenue, Morehead City, North Carolina 28557
Phone: 252-808-28081 FAX: 252-247-33301 Internet: www.nccoastalmanagement.net
An Equal Opportunity 1 Affirmative Action Employer - 50°~ Recyded 110% Post Consumer Paper
~Q N I 0 2007
Yn .
~rc~G2 ~ `~9~ D ~vS`G'
_ v~2 Z.
® ~ ~ ~/lAR `~ ~ rUQI
~~~risa~
510 Glenwood Ave., Suite 201 ~ Raleigh, NC 27603 ~ tel 919.835.1500 ~ fax 919.835.1510
~~
`~~v
~ ~~,
DATE: 26 March 2007
T0: Doug Haggett
NC Division of Coastal A~enagement
400 Commerce Ave
Nbret~ead City, NC 28557
PROJECT: Snug Harbor (JDA #05124)
Major CAMA Permit#128-00 Modification Request
We trarurnit via: USPS
FEDEX I UPS I X
,
t ~ ~ i~
r4`'WW' , _
' ;1
y ~..~~
Delivery ~ Pick up
COP_ IES ~ DATE DESCRlPT10N __
lea 13/26It)7 Revised LAMA permit application form DCM-MP-2 (dd application form and new
j I application form)
'~
I
e~^:s
For your: Approval ~ Distribution Intom>ation Record Review tx X Use i X
carrnierrt
ff erxlosures ere not as noted, please inform us immediatey.
~ r~
REMARKS:
~9.
I revised our previous DCM-MP2 application as well as filling out a new DCM-MP2 application so you'll have your
choice of which to use.
Thanks,
Mark Hall, ASIA
Cc: Melvin Brinkley, Tom Brooks, Teie Barnett
( www.jdavisarchiteds.com f ~1~~..
JDavis Architects, PLLC
Form DCM-MP-2
EXCAVATION
AND FILL
(Except bridges and culverts)
l f r ~. ,. ` '. t
f i ~ ~~.-, a ~ I
~ iii:..:=~
i.~ L.i ~,. :,r
Attach this form to Joint Application for CAMA Major
Permit, Form DCM-MP-l. Be sure to complete all
other sections of the Joint Application that relate to this
proposed project.
Describe below the purpose of proposed excavation or
fill activities. All values to be given in feet.
Average Final
Existing Project
Length Width f)enth r)enth
Access channel
(Existing)
Canal
(Widen
existing canal
by 30 feet)
H
Boat
Basin
(Existing)
Boat
Ramp
Rock
Groin
Rock
Breakwater
Other
(Circulation
Channel Extra
Canal Length
Oniv1
(Excluding
Shoreline
Stabilization)
N/A N/A N/A N/A
-3.0' -3.0'
340' IS' Each NLW NLw
Each Side Existing Existing
Side
N/A N/A N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
210' 14' 0.0' NLW 0.0' NLW
1. EXCAVATION
a. Amount of material to be excavated from
below MHW or NWL in cubic Yards N/A
b. Type of material to be excavated Fine Sand
c. Does the area to be excavated include coastal
wetlands (marsh), submerged aquatic
vegetation (SAVs) or other
wetlands Yes X No
d. High ground excavation in cubic yards
Approximatel}! 4_000 ~.
2. DISPOSAL OF EXCAVATED
MATERIAL
a. Location of disposal area
At northern end of site at existing_spoi] site
b. Dimensions of disposal area
Approximately 400' x 400' x 4'
c. Do you claim title to disposal area?
X Yes No
If no, attach a letter granting permission from
the owner.
d. Will a disposal area be available for future
maintenance? Yes X No
If yes, where? Off-site (to be determined)
Form DCM-MP-2
e. Does the disposal area include any coastal
wetlands (marsh), SAVs or other wetlands?
- Yes X No
f. Does the disposal include any area in the
water? Yes X No
3. SHORELINE STABILIZATION
a. Type of shoreline stabilization
X _ Bulkhead Riprap
b. Length Additional 680 Feet
(1892 feet total, includes basin bulkhead)
c. Average distance waterward of MHW or
NWL
0
d. Maximum distance waterward of MHW or
NWL
0
(1) Shoreline erosion during preceding 12
months N/A
(Source of injormaiion)
f. Type of bulkhead or riprap material
Concrete Sheetpile
g. Amount of fill in cubic yards to be placed
below water level N/A
(1) Riprap
(2) Bulkhead backfill
h. Type of fill material N/A
i. Source of fill material N/A
4. OTHER FILL ACTIVITIES
(Excluding Shoreline Stabilization)
a. Will fill material be brought to site?
X Yes _ No
'.,~ ~~, } 19 ,
t ; ~ ~, `~~
If yes, 3
(1) Amount of ~~te~rta ~o ~~Taced in ; ~ J 1;~~
the water None
(2) Dimensions of fill area General
Upland fill
(3) Purpose of fill
Elevated HomeBuilding and
Roadwa sites
r--~~~~~ --
b. Will fill material be placed Coa~tal~~~~ fit' ~',
wetlands (marsh), SAVs br ot}~~r~~e~lapd ?
_Yes X No C t ~U(.?(
If yes, t~~,~,
(1) Dimenstons of fit area-- ~----_-= ;_m__
(2) Purpose of fill:
5. GENERAL
a. How will excavated or fill material be kept
on site and erosion controlled?
See attached Erosion Control Plan
b. What type of construction equipment will be
used (for example, dragline, backhoe, or
hydraulic dredge)? Dra~line and backhoe
c. Will wetlands be crossed in transporting
equipment to project site? _Yes X No
If yes, explain steps that will be taken to
lessen environmental impacts.
Marina Village at Snug Harbor
Applicant or Project Name .,,,.~]~~
v i/
Signature
2~ v~t ~.~{ 2c~~
Date
Revised 03/95
Form DCM MP-2
EXCAVATION and FILL
(Except for bridges and culverts)
i i ~.~ ,~ ~ ~ 'y;
~~~
~r. ~ .
0
1' _.
x_. t , ~. ,
~~ ..
Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint
Application that relate to this proposed project. Please include all supplemental information.
Describe below the purpose of proposed excavation and/or felt activities. All values should be given in feet.
Access Other
Channel Canal Boat Basin Boat Ramp Rock Groin Rock (excluding
(NLW or Breakwater shoreline
NWL stabilization
widen canal 210'
Length N/A
340' ea side N/A N/A N/A N/A circulation
channel
Width N/A 15' ea side N/A N/A N/A N/A 14'
Avg. Existing -3.0' NLW
Depth N/A existin
9 N/A N/A NA NA 0.0' NLW
Final Project -3.0' NLW
Depth N/A existin
9 N/A N/A NA NA 0.0' NLW
7. EXCAVATION ^This section not applicable
a. Amount of material to be excavated from below NHW or NWL in b. Type of material to be excavated.
cubic yards. Fine Sand
N/A
c. (i) Does the area to be excavated indude coastal wetlands/marsh d.
(CW), submerged aquatic vegetation (SAV), shell bottom (SB),
or other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected.
^CW ^SAV ^SB
^WL ®None
(ii) Describe the purpose of the excavation in these areas:
High-ground excavation in cubic yards.
Approximately 4,000 cu.yd.
2. DISPOSAL OF EXCAVATED MATERIAL ^This section not applicable
a. .Location of disposal area. b. Dimensions of disposal area.
At northern end of site at existing spoil site
c. (i) Do you daim title to disposal area?
®Yes ^No ^NA
(ii) If no, attach a letter granting permission from the owner.
Approximately 400'X400'X4'
d. (i) Will a disposal area be available for future maintenance?
®Yes ^No ^NA
(ii) If yes, where?
Off-site (to be determined)
e. (i) Does the disposal area include any coastal wetlands/marsh
(CW), submerged aquatic vegetation (SAV), shell bottom (SB),
or other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected.
^CW ^SAV ^SB
^WL ®None
(ii) Describe the purpose of disposal in these areas:
f. (i) Does the disposal include any area in the water?
^Yes ®No ^NA
(ii) If yes, how much water area is affected?
252-80li-2808 :: 1-888-4RCC?AST :: N:ww.nccoastalm.anagement.nct revised: 1?_'1£•'f'i~
``~/
~~~ +1 f
1 i~ ~' ~
Form DCM MP-2 {Excavation and Fili, Page 2 of 2j r!`-`~' - " "
nnorenead Cs~~, ~ ~
3. SHORELINE STABILIZATION ^This section not applicable
(If development is a wood groin, use MP-4 -Structures)
... .~r...... ........................«...,.,. v. ~cnyui. oov
®Bulkhead ^Riprap ^Breakwater/Sill ^Other. Width: 2'
c. Average distance watennrard of NHW or NWL: 0' d. Maximum distance waterward of NHW or NWL: 0'
e. Type of stabilization material
Concrete sheetpile
t. (i) Has there been shoreline erosion during preceding 12
months?
^Yes ^No ®NA
(ii) If yes, state amount of erosion and source of erosion amount
information.
g. Number of square feet of fill to be placed below water level.
Bulkhead backfill N/A Riprap N/A
Breakwater/Sill N/A Other N/A
i. Source of fill material.
N/A
h. Type of fill material.
N/A
4. OTHER FILL ACTIVITIES ^This section not applicable
(F~ccluding Shoreline Stabilization)
a. (i) Will fill material be brought to the site? ®Yes ^No ^NA b. (i) Will fill material be placed in coastal wPtlanricrmarch rrwi
If yes,
(ii) Amount of material to be placed in the water None
(iii) Dimensions of fill area General upland fill
(iv) Purpose of fill
Elevated home/building and roadway sites
submerged aquatic vegetation (SAV), shell bottom (SB), or
other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected.
^CW ^SAV ^SB
^WL ®None
(ii) Describe the purpose of the fill in these areas:
5. GENERAL
a. How will excavated or fill material be kept on site and erosion b. What type of construction equipment will be used (e.g., dragline,
controlled? backhoe, or hydraulic dredge)?
See attached erosion control plan Dragline and backhoe
c. (i) Will navigational aids be required as a result of the project? d. (i) Will wetlands be crossed in transporting equipment to project
®Yes ^No ^NA site? ^Yes ®No ^NA
(ii) If yes, explain what type and how they will be implemented. (ii) If yes, explain steps that will be taken to avoid or minimize
2 Channel markers installed upon completion of bulkhead environmental impacts.
widening and removal of the earth plug
26 March 2007 Lawrence R. Zucchino
Date Appli t Name
Marina Village at Snug Harbor
Applicant Signa e
Project Name
252•$08-'2530E3 :: 1•$305-4 KGQAST :: www.nccoastalmanagcment.net revised: 12'2&;OS
Message Confirmation Report MAR-27-20071138 AM TUE
Fax Number 2522473330
Name NC DIV COASTAL MGMNT
Name~Number
Page
Start Time
Elapsed Time
Mode
Results
DCM WILM ~ 919103953964
6
MAR-27-2007 11:38AM TUE
00'24"
STD ECM
[O. K]
c