Loading...
HomeMy WebLinkAboutNCC191017_NOT Closeout Documents_20201113ental 1Land Resources: 610 East CenterA Avenue, Suite 301,, Mooresville, rNC Quality8115 704 66 - ( ) 3 1699 County: Mecklenburg Project: Harrisburg- Unimeck Transmission Line River basin: Catawba Person financially responsible: Duke Energy Carolinas, LLC - Randy Veltri Address: PO Box 1006/Mail Code EC09Q, 526 South Church Street, CharlotteNC28 Prot MECKL-2020-005 1. Project Location: Crescent Knoll Drive, Matthews 201 Pictures: No 2* Weather and soil conditions: Sunny, Workable Soils 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes 5. Violations: 6. Is the site in compliance with the NPDES Permit? Yes Describe: Initial inspection: No If no, check violations below: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): No One Inspection report: Sent Report Title: Date given 'sent: April 20, 2020 9. Corrective action needed: 10. Comments: Overall the site has sufficient permanent ground cover to restrain erosion, however there are some bare areas that need to be monitored for future issues. No additional self -monitoring or self -inspections are required. Project is released. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities should be requested by the permittee via Notice of Termination unless project was approved prior to April 1 2019. Feel free to contact our office with any additional questions. Reported by: Jeffrey Chandler Date of inspection: April 15, 2020 Others present: Kenny Llywelyn Time arriving on site: 2:45 PM Time leaving site: 3.00 PM cc - Grp