Loading...
HomeMy WebLinkAboutNCC190648_NOT Closeout Documents_20201113North Carolina Department of Environmental Quality Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094 (910) 433-3300 Roslin Farms West - Section 4, Part 2 County: Cumberland Project: (Lots 33 & 39) River basin: Lumber Person financially responsible: Caviness and Cates Building and Development, Project #: CUMBE-2019-162 Inc. - Patrick Raynor, CFO Address: 639 Executive Place. Suite 400. Fayetteville, NC 28305 I. Project Location: Gadson Drive, Rockfish Pictures: No 2. Weather and soil conditions: Dry, workable soils 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes 5. Violations: 6. Is the site in compliance with the NPDES Permit? Yes Describe: Initial inspection: No If no. check violations below: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: S. Contact made with (name): No one Title: Inspection report: Sent Report Date given/sent, April 13, 2020 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance with the SPCA and released. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities should be requested by the permittee via a Notice of Termination. Please note that this correspondence must be uploaded as part of completing the Notice of Termination process. Reported by: Melissa Joyner Others present: Date of inspection: April 09, 2020 Time arriving on site: 10:40 AM Time leaving site: 10:50 AM CC: