Loading...
HomeMy WebLinkAboutNCC191509_NOT Closeout Documents_20201113Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources. Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094 (910) 433-3300 Peartree West, Section One, Part County: Cumberland Project: Two - Lot 125 River basin: Cape Fear Person financially responsible: Caviness & Cates Building & Development Project 4. CUM13E-2020-021 Company - Christopher E Cates. Vice President Address: 639 Executive Place, Suite 400. Favetteville. NC 28305 1. Project Location: Hunting Lodge Road. Rockfish Twsp Pictures: No 2. Weather and soil conditions: Dry, workable soils 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes S. Violations: b. Is the site in compliance with the NPDES Permit? Yes Describe: Initial inspection: Yes If no, check violations below: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: S. Contact made with (name): No one Title: Inspection report: Sent Report Date given/sent: April 10, 2020 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance with the SPCA and released. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities should be requested by the permittee via a Notice of Termination. Please note that this correspondence must be uploaded as part of completing the Notice of Termination process. Reported by: Melissa Joyner Others present: Date of inspection: April 07, 2020 Time arriving on site: 10:20 AM Time leaving site: 10:30 AM CC: