HomeMy WebLinkAboutSWA000022__02 Supplemental EZ Form - Signed_20201111SUPPLEMENT-EZ COVER PAGE
FORMS LOADED
PROJECT INFORMATION
1
Project Name
Courtyards at Emerald Lake
2
Project Area ac
33.0
3
Coastal Wetland Area ac
I
0
4
Surface Water Area ac
0.5
5
Is this project High or Low Density?
High
6
1 Does this project use an off -site SCM?
No
COMPLIANCE WITH 02H .1003(4)
7
Width of vegetated setbacks provided feet
100
8
Will the vegetated setback remain vegetated?
Yes
9
Is BUA other that as listed in .1 0034 c-d out of the setback?
Yes
10
Is streambank stabilization proposed on this project?
No
NUMBER AND TYPE OF SCMs:
11
Infiltration System
0
12
Bioretention Cell
0
13
Wet Pond
2
14
Stormwater Wetland
0
15
Permeable Pavement
0
16
Sand Filter
0
17
Rainwater Harvesting RWHI
0
18
Green Roof
0
19
Level Spreader -Filter Strip LS-FS
0
20
Disconnected Impervious Surface (DIS)
0
21
Treatment Swale
0
22
Dry Pond
0
23
StormFilter
0
24
Silva Cell
0
25
Bayfilter
0
26
Filterra
0
FORMS LOADED
DESIGNER CERTIFICATION
27
Name and Title:
Brian Rossi PE/ Project Mana er
28
Organization:
EMHBT
29
Street address:
301 McCullough Dr
30
Cit
y, State, Zip:
Charlotte, NC 28262
31
1Phone number(s):
704-548-0333
brossi@emht.com
32
Email:
Certlfiralion Statement
I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or
supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that
the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the
information provided here.
,��►S�i.......IFr►'�,/
C A R 0
SEAL
045526
'11I1IItf1RO`�,
1
Signature of Designer
I� LoI Z07,0
Date
DRAINAGE AREAS
1
Is this a high density project?
Yes
2
If so, number of drainage areas/SCMs
2
3
Is all/part of this project subject to previous rule
versions?
No
FORMS LOADED
A INFORMATION
Entire Site
1
2
M
Wet Ponds
East Pond 1&2
West Pond 3in
ro ect s ft
486769 sf
373357 sf
91119 sf
on subdivided lots (subject to permitting)
7permitting)
358390 sf
266764 sf
74707 sf
outside of subdivided lots (subject to
s
128379 sf
106594 sf
16411 sf
8
Offsite -total area (sq ft
-
sf
13939 sf
9
Offsite BU(sq ft
-
sf
sf
10
Breakdown of new BUA outside subdivided lots:
Parkin (sq ft
5801 sf
5801 sf
sf
Sidewalk (sq ft
20067 sf
15341 sf
2694 sf
Roof (sq ft
6302 sf
4908 sf
sf
Roadway s ft
96210 sf
80545 sf
13717 sf
Future (sq ft
sf
sf
sf
Other, please specify in the comment box
below (sq ft
sf
sf
sf
11
New infiltrating permeable pavement on
subdivided lots (sq ft
sf
sf
sf
12
New infiltrating permeable pavement outside of
Isubdivided lots (sq ft
sf
sf
sf
13permitting)
Exisitng BUA that will remain (not subject to
s ft
sf
sf
sf
14
Existing BUA that is already permitted (sq ft
sf
sf
sf
15
Existing BUA that will be removed (sq ft
sf
sf
sf
16
Percent BUA
34%
45%
50%
17
Design storm inches
(1-yr post) - (1yr
re)
(1-yr post) - (1yr
pre
18
1 Design volume of SCM cu ft
50661 cf
12408 cf
19
Calculation method for design volume
Discrete NRCS
curve Number
Method
Discrete NRCS
curve Number
Method
ADDITIONAL INFORMATION
20
Please use this space to provide any additional information about the
drainage area(s):
WET POND
=Drainage area number
2 Design volume of SCM (cu ft)
GFNFRAI MDC FROM 07H .1050
1&2 3
50661 cf 12408 cf
3
Is the SCM sized to treat the SW from all surfaces at build -out?
Yes
Yes
4
Is the SCM located away from contaminated soils?
Yes
Yes
5
What are the side slopes of the SCM (H:V)?
3:1
3:1
6
Does the SCM have retaining walls, gabion walls or other engineered
side slopes?
No
No
7
Are the inlets, outlets, and receiving stream protected from erosion
(10-year storm)?
Yes
Yes
8
Is there an overflow or bypass for inflow volume in excess of the
design volume?
What is the method for dewatering the SCM for maintenance?
Yes
Yes
9
Drawdown Orifice
Drawdown Orifice
10
If applicable, will the SCM be cleaned out after construction?
Yes
Yes
11
Does the maintenance access comply with General MDC (8)?
Yes
Yes
12
1 Does the drainage easement comply with General MDC (9)?
Yes
Yes
13
If the SCM is on a single family lot, does (will?) the plat comply with
General MDC (10)?
No
No
14
Is there an O&M Agreement that complies with General MDC (11)?
Yes
Yes
15
Is there an O&M Plan that complies with General MDC (12)?
Yes
Yes
16
Does the SCM follow the device specific MDC?
Yes
Yes
17
Was the SCM designed by an NC licensed professional?
Yes
Yes
WET IOND MDC FROM 02H .1053
18
Method used
SA/DA
SA/DA
19
Has a stage/storage table been provided in the calculations?
Yes
Yes
20
Elevation of the excavated main pool depth (bottom of sediment
removal) (fmsl)
626.48
634.00
21
Elevation of the main pool bottom -(top of sediment removal) (fmsl)
627.48
635.00
22
Elevation of the bottom of the vegetated shelf (fmsl)
634.00
638.80
231
Elevation of the permanent pool (fmsl)
634.50
639.28
24
Elevation of the top of the vegetated shelf (fmsl)
635.00
639.80
25
Elevation of the temporary pool (fmsl)
637.51
640.39
26
Surface area of the main permanent pool (square feet)
15636:1
6350:1
27
Volume of the main permanent pool (cubic feet)
60943 cf
19040 cf
28
Average depth of the main pool (feet)
3.90 ft
3.00 ft
29
Average depth equation used
Equation 2
Equation 2
301
If using equation 3, main pool perimeter (feet)
31
If using equation 3, width of submerged veg. shelf (feet)
32
Volume of the forebay (cubic feet)
21534 cf
3456 cf
33
Is this 15-20% of the volume in the main pool?
No
No
34
Clean -out depth for forebay (inches)
84 in
39 in
35
Design volume of SCM (cu ft)
50661 cf
12408 cf
36
Is the outlet an orifice or a weir?
Orifice
Orifice
371
If orifice, orifice diameter (inches)
2.5 in
1.5 in
38
If weir, weir height (inches)
39
If weir, weir length (inches)
40
Drawdown time for the temporary pool (days)
4.48
3.95
41
Are the inlet(s) and outlet located in a manner that avoids short-
circuiting?
Yes
Yes
42
Are berms or baffles provided to improve the flow path?
No
No
43
Depth of forebay at entrance (inches)
73 in
70 in
44
Depth of forebay at exit (inches)
78 in
76 in
45
Does water flow out of the forebay in a non -erosive manner?
Yes
Yes
46
Width of the vegetated shelf (feet)
8 ft
loft
47
Slope of vegetated shelf (H:V)
8:1
10:1
48
Does the orifice drawdown from below the top surface of the
permanent pool?
Yes
Yes
49
Does the pond minimize impacts to the receiving channel from the 1-
yr, 24-hr storm?
Yes
Yes
50
Are fountains proposed? (If Y, please provide documentation that
MDC(9) is met.)
Yes
Yes
51
1 Is a trash rack or other device provided to protect the outlet system?
No
No
52
Are the dam and embankment planted in non -clumping turf grass?
Yes
Yes
53
Species of turf that will be used on the dam and embankment
Bermuda Red
Bermuda Red
54
Has a planting plan been provided for the vegetated shelf?
Yes Yes
ADDITIONAL INFORMATION
55
Please use this space to provide any additional information about the
wet pond(s):
33. The basins were designed and approved in 2014, when the 15-20% was
not a requirement. The former DEQ manual requested "Approximately 20%"
volume in the forebays. Both basins provide over 20% of the below normal
pool volume providing extra settling opportunities for both basins.
Wet Pond 3 5:13 PM 10/26/2020