Loading...
HomeMy WebLinkAbout20201437 Ver 1_PreFiling Email 30-Day Clock Reached Email_20201108Strickland, Bev From: laserfiche@ncdenr.gov Sent: Sunday, November 8, 2020 12:00 AM To: jlawler@smeinc.com Cc: Turlington, Chad Subject: Pre -Filing Time Clock has been reached for Line 1 Section 2 HDD - UT to Rose Lake - 20201437 Ver 1 Attachments: DWR Pre -Filing Meeting Request Form.pdf The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Line 1 Section 2 HDD - UT to Rose Lake that you submitted on 10/8/2020. The ID number for that project is 20201437, Version 1. Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be accepted. When you submit your application please upload a copy of the attached document in this email. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not monitored ID#* 20201437 Version* 1 Regional Office* Fayetteville Regional Office - (910) 433-3300 Reviewer List* Chad Turlington Pre -Filing Meeting Request submitted 10/8/2020 ...................................................................................................................................................................................................................................................................................... Contact Name * Joey Lawler Contact Email Address* jlawler@smeinc.com Project Name* Line 1 Section 2 HDD - LT to Rose Lake Project Owner* Project County* Owner Address: Piedmont Natural Gas Cumberland Street Address 9751 Southern Pine Blvd Address Line 2 aty Charlotte Fbstal / Zip Code 28273 Is this a transportation project?* r Yes r No State / Province / Region NC Country USA Type(s) of approval sought from the DWR: W 401 Water Quality Certification - F 401 Water Quality Certification - Regular Express r- Individual Permit r- Modification r- Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Do you know the name of the staff member you would like to request a meeting with? Chad Turlington Please give a brief project description below. Piedmont Natural Gas needs to replace a damaged segment of 12-inch diameter Line 5 natural gas pipeline with a new segment that will be installed by horizontal directional drill (HDD) within their existing 50-foot wide easement. This site is located between Black Creek Court and Rose Hill Road in Fayetteville, Cumberland County. The segment of pipe proposed for replacement is located beneath a pond and adjacent wetland area. The pond was likely constructed at the headwaters of an unnamed tributary to Rose Lake. The project may require pre -construction written approval under Nationwide Permit No. 12 and General Water Quality Certification No. 4133. Please give a couple of dates you are available for a meeting. 10/30/2020 Please attach the documentation you would like to have the meeting about. Line 5 Section 2 HDD - UT to Rose Lake.pdf 320.83KB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature ,7o Y L.4W1'I'l Submittal Date 10/8/2020