Loading...
HomeMy WebLinkAboutSW8990923_Historical File_20120509ar �!EN� NCDR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Charles Wakild, P. E. Governor Director May 9, 2012 Dr. Eric McKeithan, President Cape Fear Community College 411 North Front Street Wilmington, NC 28401 Subject: State Stormwater Permit No. SW8 990923 Modification Cape Fear Community College -North Campus High Density Stormwater Project New Hanover County Dear Dr. McKeithan: Dee Freeman Secretary The Wilmington Regional Office received a complete, modified Stormwater Management Permit Application for Cape Fear Community College -North Campus on May 2, 2012. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW8 990923 Modification dated May 9, 2012, for the construction of the built -upon areas and BMP's to serve Cape Fear Community College -North Campus. This modification adds Pond #5 for the treatment of runoff from 32,840 square feet of built -upon area associated with the Carpentry Facility. The existing ponds 1-4 are unchanged. On August 5, 2009, the Governor signed Session Law 2009-406. This law impacts any development approval issued by the Division of Water Quality under Article 21 of Chapter 143 of the General Statutes, which is current and valid at any point between January 1, 2008, and December 31, 2010. The law extends the effective period of any stormwater permit that is set to expire during this time frame to three (3) years from its current expiration date. On August 2, 2010, the Governor signed Session Law 2010-177, which grants an extra year for a total of four (4) years extension. Please note that the expiration date of this permit has been adjusted to reflect this four year extension. This permit shall be effective from the date of issuance until January 28, 2014, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the conditions listed in .this permit regarding the Operation and Maintenance of the BMP(s), certification of the BMP`s, procedures for changes of ownership, transferring the permit, and renewing the permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system, to certify the BMP's, to transfer the permit, or to renew the permit, will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes, and must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. !Unless such demands are made this permit shall be final and binding. Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 Phone: 910-796-72151 FAX: 910-350-20041 DENR Assistance: 1-877-623-6748 Internet: www.ncwaterqualky.org ne NobcithCarolina aturally An Equal Opportunity 1 Affirmative Action Employer State Stormwater Management Systems Permit Number SW8 990923 Mod. If you have any questions, or need additional information concerning this matter, please contact Linda Lewis at (910) 796-7215. Sincer , ost Charle�ild, ,Director Division of Water Quality GDS/arl: S:\WQS\Stormwater\Permits & Projects\1999\990923 HD\2012 04 permit 990923 cc: Monica Loughlin, Urban, LTD. New Hanover County Building Inspections Beth E. Wetherill, New Hanover County Engineering Wilmington Regional Office Stormwater Files Page 2 of 8 State Stormwater Management Systems Permit No. SW8 990923 Modification STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Trustees of Cape Fear Community College Cape Fear Community College -North Campus 4500 Blue Clay Road, Wilmington, New Hanover County FOR THE construction, operation and maintenance of five (5) wet detention ponds in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until January 28, 2014 and shall be subject to the following specified conditions and limitations: .1. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.6 of this permit. The stormwater controls designated as Ponds 1, 2, .3, 4, and 5 have been designed to handle the runoff from a total of 1,268,467 ff, 280,526 fr, 1,219,680 fr, 536,037 ftz, and 32,840 if, respectively, of built -upon area. 3. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 4. The built -upon area within each pond's drainage area will be limited to the amount of built -upon area indicated in Section 1.6 of this permit, the approved plans and application. 5. All stormwater collection and treatment systems must be located in either dedicated common. areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. Page 3 of 8 State Stormwater Management Systems Permit No. SW8 990923 Modification 6. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. Pond 1 Pond 2 Pond 3 Pond 4 Pond 5 a. Drainage Area, acres: 41.60 9.20 40.00 14.48 1.35 Onsite: 1,812,096 400,752 1,742,400 630,749 58,776 Offsite: 0 0 0 0 0 b. Impervious Surfaces, ft2: 1,268,467 280,526 1,219,680 536,037 32,840 Buildings, ft2: 31,363 15,790 117,176 25,265 8,820 Street, ft2: 11,761 33,625 74,488 13,939 0 Parking, ft2: 91,040 68,598 526,640 361,112 21,370 Sidewalk, ft2: 31,220 1,560 125,988 871 2,650 Other, ft2: 0 1,313 46,174 32,060 0 Future Area, ft2: 1,103,083 159,640 329,214 102,790 0 c. Pond Depth, feet: 6.00 5.00 5.50 4.50 3.0 (avg) d. Permanent Pool Elev., FMSL: 27.50 25.00 25.00 27.50 28.5 e. PP Surface Area, ft2: 96,948 31,061 78,605 43,456 5,207 f. Storage Volume Provided, ft3: 104,265 25,732 99,785 46,300 4,262 g. Storage Elevation, FMSL: 28.55 25.80 26.20 28.50 29.15 h. Controlling Orifice Pipes: 3 @3.0" cp 1 @2.0" cp 2 @3.0" cp 1 @3.0" cp 1 @1.0" cp i. Permanent Pool Volume, ft3: 515,398 100,021 260,854 142,780 15,432 j. Maximum Fountain HP: 2 Y3 1 '/ N/A k. Forebay Volume, ft3: 105,041 20,404 59,461 29,250 3,272 I. Receiving Stream: Prince George Creek m. Index Number: CPF23 (18-74-53) n. Classification: "C Sw" II. SCHEDULE OF COMPLIANCE 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface except roads. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of side slopes. d. Immediate repair of eroded areas. e. Maintenance of side slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device and catch basins and piping. g. Access to the outlet structure must be available at all times. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work'and what actions were taken. Page 4 of 8 State Stormwater Management Systems Permit No. SW8 990923 Modification 5. Decorative spray fountains will be allowed in the stormwater treatment system, subject to the following criteria: a. The fountain draws its water from less than 2' below the permanent pool surface. b. Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond. C. The fountain may not be located in the forebay. d. The falling water from the fountain must be centered in the main pond, away from the shoreline. e. The maximum horsepower for the fountain's pump is based on the permanent pool volume and is listed in Section 1.90) of this permit. Where the permanent pool volume is less than 30,000 ft , no fountain is allowed. 6. The facilities shall be constructed as shown on the approved plans. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 7. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. 8. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 9. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to the approved plans, regardless of size. . b. Redesign or addition to the approved amount of built -upon area. C. Further development, subdivision, acquisition, or sale of any, all or part of the project area. d. Alteration of any aspect of the approved stormwater drainage system and/or the approved stormwater BMPs. c. The construction of any permitted future development areas shown on the approved plans. 10. The Director may determine that other revisions to the project should require a modification to the permit. 11. A copy of the permit, application, supplements, approved plans and specifications shall be maintained on file by the Permittee for the life of the project. 12. The permittee is responsible for verifying that the proposed built -upon area does not exceed the allowable built -upon area. 13. The runoff from all built -upon area within the specified drainage areas of the project must be directed into the appropriate stormwater control system. Page 5 of 8 State Stormwater Management Systems Permit No. SW8 990923 Modification 14. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. III. GENERAL CONDITIONS This permit is not transferable to any person or entity without notice to and approval by the Director. At least 30 days prior to a change of ownership, or a name change of the Permittee or of the project, or a mailing address change, the permittee shall submit a completed and signed Name/Ownership Change Form to the Division accompanied by the supporting documentation as listed on the form. The approval of this request will be considered on its merits and may or may not be approved. The permittee is responsible for compliance with all permit conditions until such time as the Division deems the project to be in compliance and approves the transfer. 2. Any individual or entity found to be in non-compliance with the provisions of this stormwater management permit or the requirements of the stormwater rules, is subject to enforcement procedures as set forth in NCGS 143, Article 21. 3. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. 4. In the event that the facilities fail to perform satisfactorily, the Permittee shall take immediate corrective action, including those as may be required by the Division of Water Quality, such as the construction of additional or replacement stormwater management systems. 5. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 7. The permittee shall submit a permit renewal application and fee to the Division of Water Quality at least 180 days prior to the expiration date of this permit. 8. All plans previously approved under SW8 990923 and its subsequent modifications are enforceable parts of this permit. Permit modified and reissued this the 9th day of May 2012. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION Fv..u. wv r r cw.%..�.., . ..�., v...... _ Division of Water Quality By Authority of the Environmental Management Commission Permit Number SW8 990923 Page 6 of 8 State Stormwater Management Systems Permit No. SW8 990923 Modification Cape Fear Community College -North Campus Page 1 of 2 Stormwater Permit No. SW8 990923 Modification (addition of Pond 5 for Carpentry Facility) New Hanover County Designer's Certification 1, , as a duly registered in the State of North Carolina, having been authorized to observe (periodicallylweekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL Page 7 of 8 State Stormwater Management Systems Permit No. SW8 990923 Modification Page 2 of 2 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. The outlet/bypass structure elevations are per the approved plan. 5. The outlet/bypass structure is located per the approved plans. 6. A Trash Rack is provided on the outlet/bypass structure. 7. All slopes are graded to the required H:V ratio and are stable and grassed with permanent vegetation, as specified .on the plans. 8. Vegetated slopes are no steeper than 3:1. 9. The inlets are located per the approved plans and do not cause short- circuiting of the system. 10. The permitted amounts of surface area and/or volume have been provided. 11. Required drawdown devices are correctly sized per the approved plans. 12. All required design depths are provided. 13. All required parts of the system are provided, such as a vegetated shelf, and a forebay. 14. The vegetated shelf is the permitted width (10') and slope (10:1), and is planted with the required number and specified type of wetlands plants. .15. The overall dimensions of the system, as shown on the approved plans, are provided. cc: NCDENR-DWQ Regional Office New Hanover County Building Inspections Page 8 of 8 Permit No_ (to be provided by DWQ) AwOwAx HCDENR RECEIVED MAY 022012 BY: STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part ill) must be printed, filled out and submitted along with alf of the required information. '. PwvT Nis' imm Project name Contact person Phone number Date Drainage area number 910-395-1655 4/17/2012 CFCC North Campus Carpentry Facility Ryan G David �Op WA7F,QW ir, DI=>WN 3iN M`.1ATIt3At Site Characteristics Drainage area 58,776 fe Impervious area, post -development 32,840 fe % impervious 55.87 % Design rainfall depth 1.5 in Storage Volume: Non -SA Waters Minimum volume required 4,062 ff OK Volume provided 4,262 fe OK, volume provided is equal to or in excess of volume required. Storage Volume: SA Waters 1.5" runoff volume fe Pre -development 1-yr, 24-hr runoff fe Post -development 1-yr, 24-hr runoff f Minimum volume required ft3 Volume provided fe Peak Flow Calculations Is the pretpost control of the 1yr 24hr stone peak flow required? N (Y or N) 1-yr, 24-hr rainfall depth in Rational C, pre -development (unitless) Rational C, post -development (unitless) Rainfall intensity:)-yr, 24-hr storm inlhr Pro -development 1-yr, 24-hr peak flow f0/sec, Post -development 1-yr, 24-hr peak flan rt Isec PrelPost 1-yr, 24-hr peak flow control fe/sec Elevations Temporary pod elevation 2915 fmsl Permanent pool elevation 28 50 fmsl SHWT elevation (approx. at the perm. pool elevation) 28 80 fmsl Top of 1 Oft vegetated shelf elevation 29 00 fmsl Bottom of 1Oft vegetated shelf elevation 28.00 fmsl Data not needed for calculation option #1, but OK if provided. Sediment cleanout, top elevation (bottom of pond) 21.50 fmsl Sediment cleanout, bottom elevation 20 50 fmsl Data not needed for calculation option #1, but OK if provided. Sediment storage provided 1.00 it Is there additional volume stored above the state -required temp. pool? N (Y or N) Elevation of the top of the additional volume fmsl Form SW401-Wet Detention Basin-Rev.8-9/17/09 Parts I. & 11. Design Summary, Page 1 of 2 Permit (ro be provided by DWQ) Iv, Da tim, IN1:Qfti mom, - Surface Areas Area, temporary pool 7,120 ftz Area REQUIRED, permanent pool 3,785 fe SAIDA ratio 6 44 (unitless) Area PROVIDED, permanent pool, Apr,,, 5,207 ff OK Area, bottom of 1Oft vegetated shelf, Ab t_,n�r 2,425 ff Area, sediment cleanout, top elevation (bottom of pond), kt_,„d 782 ff Volumes Volume, temporary pool 4,262 fe OK Volume, permanent pool, VP,,,,_,,, 15,432 fe Volume, forebay (sum of forebays if more than one forebay) 3,272 fe Forebay % of permanent pool volume 21.2% % OK SAIDA Table Data Design TSS removal 90 % Coastal SAIDA Table Used? Y (Y or N) Mountain/Piedmont SAIDA Table Used? N (Y or N) SAIDA ratio 6.44 (unitless) Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) Y (Y or N) Volume, permanent pool, Vpw,,Lp , 15,432 ff' Area provided, permanent pool, A�,,,_pw 5,207 ft Average depth calculated 3.00 ft OK Average depth used in SAIDA, d,, (Round to nearest 0.5ft) 3.0 ft OK Calculation option 2 used? (See Figure 10-2b) N (Y or N) Area provided, permanent pool, A,,,,,, 5,207 tf Area, bottom of 10ft vegetated shelf, Ab,,_ahe, 2,425 if Area, sediment ceanout, top elevation (bottom of pond), Ab,ty„d 782 f? 'Depth" (distance b/w bottom of 1 Oft shelf and top of sediment) 6.50 ft Average depth calculated 3.00 ft OK Average depth used in SAIDA, d. (Round to nearest 0.5ft) 3.0 ft OK Drawdown Calculations Drawdown through orifice? Diameter of orifice ('If circular) Area of orifice (if -non -circular) Coefficient of discharge (CD) Driving head (Hj Drawdown through weir? Weir type Coefficient of discharge (C,,) Length of weir (L) Diving head (H) ri"evelopment 1-yr, 24-hr peak flow Post -development 1-yr, 24-hr peak flow Storage volume discharge rate (through discharge orifice or weir) Storage volume drawdown time Additional Information Vegetated side slopes Vegetated shelf slope Vegetated shelf width Length of flowpath to width ratio Length to width ratio Trash rack for overflow & orifice? Freeboard provided Vegetated filter provided? Recorded drainage easement provided? Capures all runoff at ultimate build -out? Drain mechanism for maintenance or emergencies is: Y (Y or N) 1.00In in' 0.60 (unkless) 0.33 ft N (Y or N) (unitless) (unitless) ft ft Osec felsec felsec days 3 :1 OK 10' :1 OK 10.0 It OK 3 :1 OK 1.6 :1 OK Y (Y or N) OK 16 ft OK N (Y or N) OK Y (Y or N) OK Y (Y or N) OK pump Form SW401-Wet Detention Basin-Rev.8-9/17/09 Parts I. & II. Design Summary, Page 2 of 2 Permit No. S 0 - 700 .7 fro be provided by DING) I, REQUIRED !'TEnmECKusT Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the follov'rig design requii aments have babri met. If the applicant has designated an agent, the agent may initial below. if a requirement has not been met, attach justification. Pagel Plan Initials Sheet No. Q� 4, 5,15 1. Plans (1" - 50' or larger) of the entire site showing: Design at ultimate build -out, - Off -site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Basin dimensions, - Pretreatment system, - High flow bypass system, Maintenance access, Proposed drainage easement and public right of way (ROW), Overflow device, and Boundaries of drainage easement. 7 & 8 2. Partial plan (1" = 39 or larger) and details for the wet detention basin showing: - Outlet structure with trash rack or similar, - Maintenance access, Permanent pool dimensions, Forebay and main pond with hardened emergency spillway, Basin cross-section, Vegetation specification for planting shelf, and Filter strip. nn ,, Kam' 7 3. Section view of the wet detention basin (1" = 20' or larger) showing: - Side slopes, 3:1 or lower, - Pretreatment and treatment areas, and - Inlet and outlet structures. 7 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. Q attached 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, nn , I`� D to verify volume provided. 7 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. attached 7. The supporting calculations. b attached 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. 4D N/A 9. A copy of the deed restrictions (if required). 4 attached 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. Form SW401-Wet Detention Basin-Rev.8-9/17/09 APR 1 9 z 01Z Part III. Required Items Checklist, Page 1 of 1 Permit Number: 3 (to be rovided by DWQ) Drainage Area Number: Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): ❑ does ® does not incorporate a vegetated filter at the outlet. This system (check one): ❑ does ® does not incorporate pretreatment other than a forebay. Important maintenance procedures: - Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). - No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. - Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. - If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. - Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation grid maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire BMP Trash/ debris is present. Remove the trash/ debris. The perimeter of the wet detention basin Areas of bare soil and/or erosive gullies have formed. Regrade the soil if necessary to remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. rVegetation is too short or too Maintain vegetation at a height of approximately six inches. Form SW401-Wet Detention Basin O&M-Rev.4 APR 1 9 2012 Page 1 of 4 Permit Number: SW I I IO f 23 (to be provided by DWQ) Drainage Area Number: 5 BMP element: Potentialproblem: How I will remediate theproblem: The inlet device: pipe or swale The pipe is clogged. Unclog the pipe. Dispose of the sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to Swale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such, as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide pis used, wipe it on the plants rather than spraying. The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by I and. if pesticide is used, wipe it on the plants rather than s ra mi . The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BUT. Algal growth covers over Consult a professional to remove 50 % of the area. and control the algal growth. Cattails, phragmites or other Remove the plants by wiping them invasive plants cover 50% of with pesticide (do not spray). the basin surface. Form SW401-Wet Detention Basin O&M-Rev.4 APR 1 9 2012 Page 2 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potentialproblem: How I will remediate theproblem: The embankment Shrubs have started to grow i Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. I consult a professional to remove beavers. A tree has started to grow on I Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. if applicable) The outlet device I Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 7.0 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 4.0 feet in the forebay, the sediment shall be removed. Sediment Removal Bottom BASIN DIAGRAM (fill in the blanks) Permanent Pool Elevation 28.50 24.50Pe en Pool - - - - - ---------- - Volume Sediment Removal Elevation 21.50 Volume 23.50 ft Min. -------------------------------------------- ------ Sediment Bottom Elevation 20.50 1-ft Storage Sedimei Storage IiOREBAV MAIN POND Form SW401-Wet Detention Basin O&M-Rev.4 EEIVED mAY 002 BY: Page 3 of 4 Permit Number: 5w 0 ro 72,3 (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:CFCC North Campus - Carpentry Facility BMP drainage area number* 15 Print name: Eric McKeithan Title: President Address: 411 North Front Street, Wilmington, NC 28401 Date: Ai k ti l i i Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, Akjw i Ie. Le. , a Notary Public for the State of &fA County of Mom, IA"ovcr- , do hereby certify that personally appeared before me this 1':5* day of Q pp , a011 , and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, �-a Michelle Lee Public New Hanover County North Carolina My Commission Expires 5/11 /2013 SEAL My commission expires S tI `aOI Form SW401-Wet Detention Basin O&M-Rev.4 APR 1 9 202 Page 4 of 4 MEMORY TRANSMISSION REPORT TIME :05-11-'12 07:09 FAX NO.1 :910-350-2004 NAME :DENR Wilmington FILE NO. 270 DATE 05.11 07:06 TO : 8 93627046 DOCUMENT PAGES 9 START TIME 05.11 07:08 END TIME 05.11 07:09 PAGES SENT 9 STATUS OK *** SUCCESSFUL TX NOTICE *** sam*= ornratrtd Cgro%taa Iiepartmeat ar aad r4atn.ral Raroaa+a-es Wamlauboa Reut-011 QMaw Psw—,,Bp AK� rbrrias Govaraor PAX COVzi simmw Dart ss. t'at+irS' Goc � �� C_ P11.oae: [9101 '796-7 36 1r t��!'y� T Faxc (910] 350-2004 —ol -sr-yr 12'7 a'sraiost X1— Vtpamnsion. wig 14C 3H407 . (9103 79s-723Ls . wn HquW Ogportunfiy wffira .tj— w .a rn pjoyer State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office Beverly Eaves Perdue, Governor FAX COVER SHEET Dee Freeman, Secretary Date:.. �"" �l " Z D! Z - No. Pages (excl. cover): To: Co: ef��� Fax: ? a —� � Re: From: Jo Casmer Phone: (910) 796-7336 Fax: (910) 350-2004 127 Cardinal Drive Extension, Wilmington, NC 28405 • (910) 796-7215 9 An Equal Opportunity Affirmative Action Employer MEMORY TRANSMISSION REPORT TIME :05-11-'12 07:08 FAX NO.1 :910-350-2004 NAME :DENR Wilmington FILE NO. 269 DATE 05.11 07:06 TO : 8 93951451 DOCUMENT PAGES 9 START TIME 05.11 07:06 END TIME 05.11 07:08 PAGES SENT 9 STATUS OK *** SUCCESSFUL TX NOTICE *** Stato or North Caavlfoa baparto * er Mawsroasaont and Mataral Itasoaree WOmlodtoa Rea[oaaa Odlsca 8syss�(Y Gawrapr FAX COVTR iSHB::ET 17ss , 9eeretary From: Jo Cawmar - Phoae: (9 Y 6) 796-73 6 Fame �3�_!�/�l� Vex_ 5910) 356-2004 7 27 C dlnal Deive Samenpioq WiL�a(nghaq NC 28409 - (910) 796-7215 � M EQual OPR��liY /�.�1vnY[i'te AOtion Bmployer State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office Beverly Eaves Perdue, Governor FAX COVER SHEET Dee Freeman, Secretary Date:._..'//� To: �jlA•� QA//� Co: Fax: No. Pages (excl. cover): From: Jo Casmer Phone: (910) 796-7336 Fax: (910) 350-2004 Re: cl— — /�O.-e, 7w 127 Cardinal Drive Extension, Wilmington, NC 28405 • (910) 796-7215 • An Equal Opportunity Affirmative Action Employer �� tJ Central Files: APS_ SWP_ 05/10/12 ,r SW8990923 Permit Tracking Slip Ategory Status Project Type Active Major modification /pe Version Permit Classification :brmwater 1.70 Individual ry Reviewer .lewis ,astal SW Rule oastal Stormwater - 2008 Permitted Flow Facili Permit Contact Affiliation Facility Name Major/Minor Region Cape Fear Community College Blue Clay Road Minor Wilmington Campus Location Address County 4500 Blue Clay Rd New Hanover Castle Hayne NC 28429 Facility Contact Affiliation Owner Name Cape Fear Community College Dates/Events Owner Type Government - County Owner Affiliation Carl D. Brown 411 N Front St Wilmington NC 28405 Scheduled Orig Issue App Received Draft Initiated Issuance Public Notice Effective 01/28/00 04/19/12 05/09/12 05i09/12 Regulated Activities Requested/Received Evenh State Stormwater - HD - Detention Pond Deed restriction requested Deed restriction received Additional information requested Additional information received Outfall NULL Expiration 01/28/14 04/24/12 05/02/12 Waterbody Name Stream Index Number Current Class Subbasin -.: _ - urban,. F" I TO: I�C.oU ATTN: 9 Jam- foss& ❑ ORIGINALS ❑ SPECIFICATIONS ❑ COLOR PRINTS �Cr2eSS- SNNERS M EERS CAPE ECTS LAND YORS DATE: JOB #: lJ q- PRINT TICKET #:�� TRANSMITTED HEREWITH: ❑ PHOTOCOPIES COMPUTATIONS ❑ SITE NOTICES ❑ CD ')-,dfBLACKLINE PRINTS ❑ INVOICE ❑ MYLAR PRINTS ❑ OTHER QUANTITY DRAWING NO. DATE DESCRIPTION � i VAA Ott CI-L.AAt�► Id s ii� s Pk 3of 4- - U)e,+ p-4e-u-km 645,t,' 0 ( LPL FOR: ❑ SUBMISSION ❑ FIELD USE SENT BY. ❑ FIRST CLASS MAIL PLEASE: ❑ RETURN COMMENTS: RECEIVED BY - RESUBMISSION ❑ INSERTS ❑ YOURFILES❑ COMMENTS j OUR MESSENGER /'� ❑ SUBMIT ❑ APPROVAL/SIGNATURE ❑ OTHER ❑ PICKUP ❑ COURIER ❑ OTHER ❑ OVERNIGHT SENT BY �1 61-1 AAA`xe Urban, Ltd. 1 Kerr Avenue, Suite I(1, Wilmington, North Carolina 28405 PH 910.395.1655 www.urban-ltd.com Annandale, VA Chantilly, VA Wilmington, NC Winchester, VA urban May 1, 2012 Ms. Linda Lewis NCDENR Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405 RE: CFCC — North Campus Carpentry Facility Pond #5 SW8 990923 Modification Dear Ms. Lewis; 2012 PLANNERS ENGINEERS LANDSCAPE ARCHITECTS LAND SURVEYORS In response to your comments received via email dated April 24, 2012 regarding the above referenced project, we offer the following: 1. Comment: The future BUA allocation of 102,790 sf was left off of the Pond 4 column. I have added it in. The total BUA of 536,037 is unchanged. Response: The future BUA of 102,790 sf has been added to the Pond 4 column; see attached revised Drainage Area 4 data. 2. Comment: As indicated on the application form, if existing BUA will be removed or replaced by new BUA (i.e. paved over), then it should be included as proposed. I have crossed out the 6230 sf of existing BUA reported for Pond 5 and have added it to the proposed parking amount. The new parking amount is 21,370 sf. Response: The 6230 sf of existing BUA has been removed and incorporated into the proposed parking amount; see attached revised Page 4 of 7. 3. Comment: Please check the reported surface area at elevation 28 in Pond 5. You've reported it as 2,082 sf, but this does not appear to be enough based on scaling the 28 contour on the plans. You report about 1500 sq. ft. (avg) at 28 just for the forebay, so there's go to be more than 682 in the split main ponds at elevation 28. Response: The main pond area has been revised as a result of your comment #4. The surface elevation 28 in Pond 5 is 4,292 sf (main and forebay). The surface elevation 28 in the main pond and forebay are 2,425 sf and 1,867 sf, respectively; see attached revised calculations. Urban, Ltd. 108 N. Kerr Ave., Suite K-1 Wilmington, North Carolina 28405 PH 910.395.1655 FX 910.395.1451 www.urban-ltd.com Annandale, VA Chantilly, VA Winchester, VA Wilmington, NC CFCC — North Campus Carpentry Facility Pond #5 SW8 990923 Modification May 1, 2012 4. Comment: I'm coming up with a significantly less permanent pool volume than you do which may be more related to the deficient surface area at 28 (as described above). It would be best to startyour HydroCAD stage -storage table at elevation 22.6 with those corresponding areas, incremental volumes and cumulative volumes up to and including the bottom of the shelf and the permanent pool elevation. Your approximation doesn't take into account the 10:1 slope of the shelf starting at elevation 28.0, so you are getting a higher volume. Response: The permanent pool volume has been recalculated and it was observed that the volume was less as you indicated. As a result, the average permanent pool depth decreased to 2 feet. We have added a sheet pile retaining wall along two sides of the main pond to increase the volume to reach the designed and calculated permanent pool depth of 3 feet; see attached revised calculations and drawings. We also lowered the main pool of the pond by one foot; see attached revised calculations and revised page 3 of 4 of the Wet Detention Basin O&M Agreement. 5. Comment: Some of the numbers reported on the supplement don't quite match up to the calculations, as detailed below: Supplement Calculations Prov. Temp. Pool Volume 4283 4262 Sod. Cleanout area, sf 57 28 Perm Pool Volume, cf 16,092 16,006 Response: The provided temporary pool volume on the supplement has been revised to 4,262 sf; see attached revised page 1 of 2. The sediment cleanout area and permanent pool volume have been revised as a result from comment #4. The sediment cleanout area and permanent pool volume are 782 sf and 15,432 cf, respectively. The supplement and calculations match these referenced values; see attached revised supplement and calculations. If you have any question please do not hesitate to contact me at 910-395-1655, or via email at mlouahlin(&-urban-Itd.com. Sincerely, URBAN, LTD. /, Monica V. Loughlin, El Project Manager Page 2 of 2 Lewis,Linda From: Lewis, Linda Sent: Tuesday, April 24, 2012 1:10 PM To: Loughlin, Monica Cc: Russell, Janet Subject: CFCC Pond #5 SW8 990923 Mod. Monica: I've completed my Express review of this project, received on April 19, 2012, and have the following minor comments: 1. The future BUA allocation of 102,790 sf was left off of the Pond 4 column. I have added it in. The total BUA of 536,037 is unchanged. 2. As indicated on the application form, if existing BUA will be removed or replaced by new BUA (i.e., paved over), then it should be included as proposed. I have crossed out the 6230 sf of existing BUA reported for Pond 5 and have added it to the proposed parking amount. The new parking amount is 21,370 sf. 3. Please check the reported surface area at elevation 28 in Pond 5.. You've reported it as 2,082 sf, but this does not appear to be enough based on scaling the 28 contour on the plans. You report about 1500 sq. ft. (avg) at 28 just for the forebay, so there's got to be more than 582 sf in the split main ponds at elevation 28. 4. I'm coming up with significantly less permanent pool volume than you do which may be more related to the deficient surface area at 28 (as described above). It would be best to start your HydroCAD stage - storage table at elevation 22.5 with those corresponding areas, incremental volumes and cumulative volumes up to and including the bottom of the shelf and the permanent pool elevation. Your approximation doesn't take into account the 10:1 slope of the shelf starting at elevation 28.0, so you are getting a higher volume. 5. Some of the numbers reported on the supplement don't quite match up to the calculations, as detailed below: Supplement Calculations Prov. Temp. Pool Volume 4283 4262 Sed. cleanout area, sf 57 28 Perm Pool Volume, cf 16092 16005 Please correct these minor problems (revised application, revised supplement, revised calcs) and resubmit before Tuesday, May 1, 2012. These are minor issues, so there is no resubmittal fee. Linda Lewis NC Division of Water Quality 127 Cardinal Drive Ext. Wilmington, NC 28405 910-796-7215 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. STORMWATER CALCULATIONS CFCC NORTH CAMPUS - CARPENTRY FACILITY NEW HANOVER, NORTH CAROLINA For Cape Fear Community College 411 North Front Street Wilmington, NC 28401 910-362-7004 %Jiiui 4 0' 3 fto o4�i�-1�Iz k,w 0510 l April, 2012 Prepared by: URBAN, LTD. 108 North Kerr Avenue, Suite K-1 Wilmington, North Carolina 28405 (910) 395-1655 (910) 395-1451 (Fax) P� RECEIVED MAY 0 8 2012 BY: DA 5 CFCC North Campus 5/2/2012 Carpentry Facility 58,776 Drainage Area (sq. ft.) 8,820 Buildings (sq. ft.) 15,140 Asphalt (sq. ft.) 2,650 Concrete (sq. ft.) 6;230 Ex. Asphalt (sq. ft.) 0 . Offsite Impervious (sq. ft.) Impervious Area Land Use sq. ft. acres Buildings Total 8,820 0.20 Asphalt Total 15,140 0.35 Concrete Total 2,650 0.06 Ex. Asphalt 6,2301 0.14 Offsite Total 0 0.00 Summary sq. ft. acres Total Drainage Area = Total Impervious Area = Total Pervious Area = Percent Impervious = 58,776 32,840 25,936 55.87% 1.35 0.75 0.60 State burrace Area Requirement at normal pool: Pond side slopes = 3 :1 Ave. depth below PP = 3 ft. SA/DA = 0.0644 Chart for 90% TSS Removal for Pond Required SA = (SAIDA) x (Total Drainage Area) = 3,785 sq. ft. State Volume Requirement for Storage of first 1.5" runoff: Vol. = 3630*Rd*(0.05+0.9*la)*A 4,062 cu.ft. Pond Size: Elevation (ft. Surface Area sq. ft.) Permanent Pool 28.50 5,207 Temporary Pool 29.15 7,120 Top of Bank 31.30 10,795 Sediment Storage Elev. 21.50 782 Total Provided Storage Volume: Vol. _ [(PP SA + TP SA) 121 * (TP - PP elev) 4,262 cu. ft. 520-7 4 r7(ZO X (N.6-U-5) Z 1 DA 5 Pond Volume: CFCC North Campus Carpentry Facility Elev. (ft) Surf. Area sq.ft. Inc. Store cu.ft.) Cum. Store (cu.ft.) 21.50 882 0 0 22.50 1,070 976 976 23.50 1,276 1,173 2,149 24.50: 1,580 1,428 3,577 25.50 2,117 1,849 5,426 26.50 2,756 2,437 7,862 27.50 3,659 3,208 11,070 28.00 4,292 1,988 13,057 [77i8.50,5,207 2,375 15,432 Sediment Storage SA = 782 sq. ft. Permanent Pool SA = 5,207 sq. ft. Vol. = [(PP SA+Sed.Sto. SA) / 2] x (PP el.-Sed.Sto. el.) 15,432 cu. ft. Forebay: Required Forebay Volume Vol. = 20% of storage volume 3,086 cu. ft. Elev. (ft) Surf. Area (sq.ft.) Inc. Store (cu.ft.) Cum. Store cu.ft. 24.50 82 0 0 25.50 377 230 230 26.50 758 568 797 27.50 1,219 989 1,786 28.50 1,753 1,486 3,272 Hroviaea roreoay volume Bottom Elevation = 24.50 ft. Bottom SA = 82 sq. ft. Permanent Pool Elev = 28.50 ft. PP SA = 1,753 sq. ft. Vol. = [(PP SA + Bottom SA) / 21 x (PP el. - Bottom el.) 3,272 cu. ft. depth = 4.00 ft. 5/2/2012 2 DA 5 CFCC North Campus 5/2/2012 Drawdown: Carpentry Facility Flow for 2-day drawdown: for 1st 1.5" of stormwater, Q = Required Vol. / 172,800 sec. (2-days) = 0.024 cfs Required Area of Pipe for 2-day drawdown: A= Q I [Cd x SQRT(2 x g x h)] Cd = 0.6 g = 32.2 ft./s2 h = (FP el.- NP el.) /3 = 0.216667 ft. A = 0.0105 sq. ft. Diameter of Pipe for 2-day drawdown: DIA. = SQRT[(A x 4) / pi] = 0.1156 ft. 1.39 in. Use 1.00 in. orifice 3 Permanent Pool Average Depths CFCC North Campus Carpentry Facility Pond # Volume o PermanentPoolArea o Permanento0 dam SAIDA (� (S� 1 15.432 5,207 3.0 0.0644 da„= average depth of permanent pool to use in the SA/DA tables (ft) da„= Volume of Permanent Pool / Area of Permanent Pool 5/2/2012 CFCC Carpentry Type // 24-hr 2yr Rainfall=4.50" Prepared by Urban, Ltd. Printed 5/2/2012 HydroCAD® 8.50 s/n 005389 © 2007 HydroCAD Software Solutions LLC Page 2 Summary for Subcatchment DA 5: Post Developed Runoff = 7.44 cfs @ 11.96 hrs, Volume= 15,162 cf, Depth> 3.10" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs Type II 24-hr 2yr Rainfall=4.50" Area (sf) CN Description 32,840 98 Paved parking & roofs 25,936 74 >75% Grass cover, Good, HSG C 58,776 87 Weighted Average 25,936 Pervious Area 32,840 Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, CFCC Carpentry Type // 24-hr 2yr Rainfall=4.50" Prepared by Urban, Ltd. Printed 5/2/2012 HydroCAD® 8.50 s/n 005389 © 2007 HydroCAD Software Solutions LLC Page 5 Summary for Pond P1: Pond 1 Inflow Area = 58,776 sf, 55.87% Impervious, Inflow Depth > 3.10" for 2yr event Inflow = 7.44 cfs @ 11.96 hrs, Volume= 15,162 cf Outflow = 1.36 cfs @ 12.12 hrs, Volume= 10,569 cf, Atten= 82%, Lag= 9.4 min Primary = 1.36 cfs @ 12.12 hrs, Volume= 10,569 cf Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs Peak Elev= 29.60' @ 12.12 hrs Surf.Area= 8,209 sf Storage= 7,766 cf Plug -Flow detention time= 191.1 min calculated for 10,569 cf (70% of inflow) Center -of -Mass det. time= 93.5 min ( 894.0 - 800.5 ) Volume Invert Avail.Storage Storage Description #1 28.50' 23,734 cf Custom Stage Data (Prismatic) Listed below (Recalc) #2 28.20' 177 cf 18.0"D x 50.00'L Horizontal Cylinder S= 0.00607 x 2 23,911 cf Total Available Storage Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 28.50 5,207 0 0 29.00 7,093 3,075 3,075 30.00 8,779 7,936 11,011 31.30 1b,795 12,723 23,734 Device Routing Invert Outlet Devices #1 Primary 28.40' 15.0" x 47.4' long Culvert CMP, projecting, no headwall, Ke= 0.900 Outlet Invert= 28.20' S= 0.0042 T Cc= 0.900 n= 0.013 Concrete pipe, straight & clean #2 Device 1 28.50' 1.0".Vert. Orifice/Grate C= 0.600 #3 Device 1 29.15' Custom Weir/Orifice, C= 2.62 Head (feet) 0.00 0.12 0.24 0.36 0.48 0.60 0.69 Width (feet) 1.44 1.41 1.34 1.23 1.06 0.78 0.00 #4 Primary 30.00' 6.0' long x 3.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 .4.00 4.50 Coef. (English) 2.44 2.58 2.68 2.67 2.65 2.64 2.64 2.68 2.68 2.72 2.81 2.92 2.97 3.07 3.32 Primary OutFlow Max=1.36 cfs @ 12.12 hrs HW=29.60' (Free Discharge) T Culvert (Passes 1.36 cfs of 3.21 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.03 cfs @ 4.95 fps) 3 Custom Weir/Orifice (Weir Controls 1.33 cfs @ 2.25 fps) 4--Broad-Crested Rectangular Weir ( Controls 0.00 cfs) CFCC Carpentry Type 11 24-hr 2yr Rainfall=4.50" Prepared by Urban, Ltd. Printed 5/2/2012 HydroCAD® 8.50 s/n 005389 © 2007 HydroCAD Software Solutions LLC Page 6 Elevation Storage (feet) (cubic -feet) 28.20 0 28.22 0 28.24 0 28.26 0 28.28 0 28.30 1 28.32 1 28.34 2 28.36 2 28.38 3 28.40 4 28.42 5 28.44 6 28.46 7 28.48 9 28.50 10 28.52 117 28.54 225 28.56 335 28.58 447 28.60 560 28.62 674 28.64 791 28.66 908 28.68 1,028 28.70 1,149 28.72 1,271 28.74 1,395 28.76 1,521 28.78 1,648 28.80 1,777 28.82 1,907 28.84 2,039 28.86 2,172 28.88 2,307 28.90 2,443 28.92 2,581 28.94 2,721 28.96 2,862 28.98 3,004 29.00 3,149 29.02 3,294 29.04 3,439 29.06 3,586 29.08 3,733 29.10 3,881 29.12 4,030 29.14 4,179 29.16 4,329 29.18 4,479 29.20 4,631 29.22 4,782 Stage -Area -Storage for Pond P1: Pond 1 Elevation Storage (feet) (cubic -feet) 29.24 4,935 29.26 5,088 29.28 5,242 29.30 5,397 29.32 5,552 29.34 5,708 29.36 5,864 29.38 6,021 29.40 6,179 29.42 6,337 29.44 6,496 29.46 6,656 29.48 6,816 29.50 6,977 29.52 7,139 29.54 7,301 29.56 7,464 29.58 7,627 29.60 7,791 29.62 7,956 29.64 8,121 29.66 8,286 29.68 8,453 29.70 8,620 29.72 8,787 29.74 8,955 29.76 9,123 29.78 9,292 29.80 9,462 29.82 9,632 29.84 9,802 29.86 9,974 29.88 10,145 29.90 10,318 29.92 10,490 29.94 10,664 29.96 10,838 29.98 11,012 30.00 11,188 30.02 11,364 30.04 11,540 30.06 11,717 30.08 11,895 30.10 12,073 30.12 12,252 30.14 12,432 30.16 12,612 30.18 12,793 30.20 12,975 30.22 13,157 30.24 13,339 30.26 13,523 Elevation Storage (feet) (cubic -feet) 30.28 13,707 30.30 13,891 30.32 14,076 30.34 14,262 30.36 14,449 30.38 14,636 30.40 14,823 30.42 15,012 30.44 15,201 30.46 15,390 30.48 15,580 30.50 15,771 30.52 15,962 30.54 16,154 30.56 16,347 30.58 16,540 30.60 16,734 30.62 16,929 30.64 17,124 30.66 17,320 30.68 17,516 30.70 17,713 30.72 17,911 30.74 18,109 30.76 18,308 30.78 18,507 30.80 18,707 30.82 18,908 30.84 19,109 30.86 19,311 30.88 19,514 30.90 19,717 30.92 19,921 30.94 20,125 30.96 20,330 30.98 20,536 31.00 20,742 31.02 20,949 31.04 21,157 31.06 21,365 31.08 21,573 31.10 21,783 31.12 21,993 31.14 22,203 31.16 22,415 31.18 22,627 31.20 22,839 31.22 23,052 31.24 23,266 31.26 23,480 31.28 23,695 31.30 23,911 -- 7 lw 17- d-O �a STATE OF NORTH CAROLINA COUNTY OF NEW HANOVER. THE TRUSTEES OF CAPE FEAR COMMUNITY COLLEGE, a Body Politic, Plaintiff, W W PETERSON, v Defendant IN THE GENERAL COURT OF JUSTICE -; �• ^ _� �;; J SUPERIOR COURT DIVISION J FILE NO 98-CVS-1580 ! FOR REGISTRATION REGISTER OF DEEDS REBECCA T CHRISTIAN NEW HANOVER COUNTY NC 2201 42 M2 1 BK 2894MPPGG 124-12B�FEE 1BB INSTRUMENT 02W%OS570 } FINAL JUDGMENT } THIS CAUSE coming on to be heard, and being heard, before the undersigned Superior Court Judge presiding on the date set forth below, and it appearing to the Court that all matters and things in controversy regarding this matter have been compromised and sailed, and the parties hereto consent to the entry of this Judgment in accordance with C Oren Stat § 40A-54, and it appearing to the Court, based upon the consent of the parties, that just compensation has now been paid for the land of the Defendant, W W Peterson. that has been acquired in this action pursuant to the provisions of Chapter 40A of the North Carolina General Statutes, and that the Plaintiff, the Trustees of Cape Fear Community College. a Body Politic, is the fee simple owner and in possession of the property described on Exhibit "A" attached hereto and incorporated herein by reference, NOW, THEREFORE, with the consent of all parties hereto, it is ORDERED, ADJUDGED, and DECREED That the Plaintiff has paid just compensation to the Defendant, W W Peterson, for the property that is the subject matter of this condemnation action and as is more particularly described on Exhibit "A" attached hereto That the Plaintiff, the Trustees of Cape Fear Community College, is the fee simple owner and entitled to sole possession of that certain tract or parcel on Exhibit "A" attached hereto and incorporated herein by reference Ctn. o *f R'VJ00" ` �U1Z APR 1 9 _ x/fJIC/JIB/, -�. 3 That each party shall pay its own costs and that the parties shall have and recover nothing further from any other party in connection with the property described on Exhibit "A " 4 That the Clerk of Superior Court, New Hanover County, shall certify a Copy of this Judgment to the Register of Deeds of New Hanover County so that the same may be recorded in the New Hanover County Registry The Register of Deeds for New Hanover County shall record this Judgment and cross-index the same in the Grantor/Grantee indexes This the , day of c..�'-^ , 2001 0 Superior Court Judge WE CONSENT i Ryal �7v loeFortof Ward and Smith, P A University Corporate Center 127 Racine Drive Post Office Box 7068 Wilmington, North Carolina 28406-7068 Telephone (910) 392-5100 Facsimile (910) 392-2333 Attorneys for Plamtiff r, I Mr David A Nash Hogue, Hill, Jones, Nash & Lynch, L L P 101 South Third Street Post Office Box 2178 Wilmington, NC 28402 Telephone (910) 763-4565 Facsimile (910) 762-6687 Attorneys for Defendant APR 1 9 Z012 EXHIBIT A DESCRIPTION OF AREA TAKEN All that certain tract or parcel of land lying and being situate in Cape Fear Township, New Hanover County, North Carolina and being more particularly described as follows BEGINNING at an iron pipe in the Southern line of the Sidbury Road (S R. #1336 - 60-foot right of way) at its intersection with the center line of a Carolina Power and Light Company 240-foot easement, said beginning point being located North 80 degrees 38 minutes East 1,0110 feet, as measured along the Southern line of the Sidbury Road, from its intersection with the Eastern line of the Blue Clay Road (60-foot right of way), said beginning point being also the Northernmost corner of that tract conveyed to Richard Bernhard Baran and wife by that deed recorded in the New Hanover County Registry in Book 1211 at Page 1823, running thence North 80 degrees 38 minutes 30 seconds East along said nine of the Sidbury Road :310 16 feet to a right of way monument at the point at which said right of way of the Sidbury Road widens, thence South 9 degrees 29 minutes 30 seconds East 30 05 feet to a right of way monument, thence North 84 degrees 4 minutes 30 seconds East along the Southern line of the Sidbury Road 50103 feet to a right of way monument, thence North 85 degrees 6 minutes 40 seconds East along the Southern line of the Sidbury Road 444 27 feet to a right of way monument in the Western line of the right of way of Interstate Highway #40; thence Southwardly along the Western Iine of said right of way of Interstate Highway #40, as it curves to the West, to a right of way monument which is located South 7 degrees 54 minutes 30 seconds East 1,005 38 feet from the last preceding point, thence continuing along the Western right of way line of Interstate Highway #40. as it curves to the West, to its intersection with the Southern line of that tract conveyed to D B Seitter, Jr, by that deed recorded in said Registry in Book 1140 at Page 887, the same being located South 4 degrees 25 minutes 45 seconds East 354 03 feet from the last preceding point, thence North 69 degrees 21 minutes 30 seconds West along the Southern line of said Seitter tract 1,382 56 feet to an iron pipe at the Southernmost corner of said Baran tract, the same being in the center line of said Carolina Power and Light Company 240-foot easement, thence North 9 degrees 22 minutes West, along the center line of said Carolina Power and Light Company easement and also along the Eastern line of said Baran APR 1 9 ZU1Z tract, 760 98 feet to the Beginning, containing 30 54 acres, more or less. The courses and distances set out herein are based upon a survey of the property by G Douglas Jeffreys dated November 25, 1983 The above -described property was conveyed to W W Peterson from D B Seater, Jr and wife, Patty S Seitter, by deed recorded in Book 1240. at Page 878, New Hanover County Registry, reference to which is hereby made Reference is also made to that plat entitled "Map of Survey for Cape Fear Community College" prepared by Sherwin D Cribb, Registered Land Surveyor, dated June 8, 1998, and revised January 26, 1999, the same having been filed in this civil action on November 17, 2000 SAVE AND EXCEPT that parcel of land conveyed by W W Peterson to the Department of Transportation as set forth in that deed dated March 16, 1998 and recorded in Book 2340, at Page 213, New Hanover Country, reference to which is hereby made for a more complete and accurate description of the property excepted from the description of the property described above Included with the above -described property are all buildings, structures, permanent improvements or fixtures situated on or affixed to the property, in fee simple absolute Subject, however, to the easements to the Carolina Power and Light Company, the same having been created by instruments recorded in the New Hanover County Registry to Book 505 at Page 431. Book 780 at Page 301, Book 869 at Page 93 and Book 1291 at Page 1053 APR 1 9 L012 REBECCA T CHRISTIAN REGISTER OF DEEDS, NEW HANOVER JUDICIAL BUILDING 316 PRINCESS STREET WILMINGTON, NC 2 401 #!#t!t##t####t##t#t#!###!#l!#!!!#!!!k##�►##s#e=r�k!!#r#,Hr######!#!!###�nF##!!!!!�4ll�Fttr##e!t!#t!#tt!llrfr#iw#li.lr#t*##!#ttry#! Filed For Registration. 03/08/2001 04.11:42 PM Book` RE 2884 Page: i24-128 Document No.. 2001008570 JDGMT 5 PGS $12.00 Recorder: JACQUELINE NELSON State of North Carolina, County of New Hanovi REBECCA T. CHRISTIAN , REGISTER OF DEEI *2001008570* 2001008570 APR 1 9 Z01Z REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING ANALYSIS NORTH CAMPUS CARPENTRY/R.O.P.E.S. FACILITY CASTLE HAYNE, NEW HANOVER COUNTY, NORTH CAROLINA TM �ZAx MRS,� - PREPARED FOR: MR. JONATHAN BEGUE CAMP FEAR COMMUNITY COLLEGE WILMINGTON CAMPUS 411 NORTH FRONT STREET WILMINGTON, NORTH CAROLINA 28401-3910 ECS CAROLINAS, LLP PROJECT NO.: 22.16115 SEPTEMBER 3, 2010 APR 1 9 ZU1'L RiTM LLp E C S CAROLINAS, L L P "Setting the Standard for Service" �_-A CAROLINAS Geotechnical • Construction Materials • Environmental • Facilities September 3, 2010 Mr. Jonathan Begue Camp Fear Community College Wilmington Campus 411 North Front Street Wilmington, North Carolina 28401-3910 Re: Report of Subsurface Exploration and Geotechnical Engineering Evaluation North Campus Carpentry/R.O.P.E.S. Facility Castle Hayne, New Hanover County, North Carolina ECS Project No.: 22.16115 Dear Mr. Begue: As authorized by your acceptance of our proposal number 22:14127 dated August 25, 2010, ECS Carolinas, LLP has completed a subsurface exploration for the subject project. This report presents the results of the field exploration and engineering analysis, along with our recommendations for design of geotechnical related items. We appreciate the opportunity to be of service to you during the design phase of this project and look forward to our continued involvement during the construction phase. If you have any questions concerning the information and recommendations presented in this report, please contact us at (910) 686-9114 for further assistance. Respectfully submitted, ECS CAROLINAS, LLP Winslow E. Goins, P.E. Project Engineer North Carolina License No. 033751 Kris Stamm Principal APR 1 9 Z012 7211 Ogden Business Park, Suite 201, Wilmington, NC 28411 • T 910-686-9114 - F: 910-686-9666 - www.ecslimited.com ECS Carolinas, LLP - ECS Florida, LLC • ECS Illinois, LLC - ECS Mid -Atlantic, LLC - ECS Southeast, LLC • ECS Texas, LLP REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING ANALYSIS NORTH CAMPUS CARPENTRY!R.O.P.E.S. FACILITY CASTLE HAYNE, NEW HANOVER COUNTY, NORTH CAROLINA PREPARED FOR: MR. JONATHAN BEGUE CAMP FEAR COMMUNITY COLLEGE WILMINGTON CAMPUS 411 NORTH FRONT STREET WILMINGTON, NORTH CAROLINA 28401-3910 PREPARED BY: ECS CAROLINAS, LLP 7211 OGDEN BUSINESS PARK SUITE 201 WILMINGTON, NORTH CAROLINA 28411 ECS CAROLINAS, LLP PROJECT NO.: 22.16115 FIRM NO. F-1087 WINSLOW E. GOINS. P.E. C A `� � s�i s r" .40 ,IS10.033751 SEPTEMBER 3, 2010 APR 1 9 ZOIZ TABLE OF CONTENTS i.0 EXECUTIVE SUMMARY...................................................................................................... 2.0 PROJECT OVERVIEW.........................................................................................................2 2.1 Project Information..........................................................................................................2 2.2 Scope of Work.................................................................................................................2 2.3 Purpose of Exploration....................................................................................................2 3.0 EXPLORATION PROCEDURES..........................................................................................3 3.1 Subsurface Exploration Procedures.................................................................................3 3.1.1 Cone Penetration Testing........................................................................................ 3 3.1.2 Hand Auger Borings and Infiltration Tests...............................................................3 4.0 EXPLORATION RESULTS ........................... :....................................................................... 4 4.1 Site Conditions................................................................................................................4 4.2 Regional Geology............................................................................................................4 4.3 Soil Conditions.................................................................................................................4 4.4 Groundwater Conditions..................................................................................................5 4.5 Seasonal High Water Level Results................................................................................5 5.0 ANALYSIS AND RECOMMENDATIONS..............................................................................6 5.1 Subgrade Preparation......................................................................................................6 5.2 Engineered Fill Placement...............................................................................................7 5.3 Foundation Design...........................................................................................................8 5.4 Floor Slab Design............................................................................................................9 5.5 .Site Drainage...................................................................................................................9 5.6 Construction Considerations............................................................................................9 6.0 CLOSING...........................................................................................................................11 APPENDICES APPENDIX A- SITE MAP APPENDIX B- CPT BORING LOGS APPENDIX C- INFILTRATION TESTING FORM APPENDIX D- GENERAL CONDITIONS APR 1 9 Z01Z Report of Subsurface Exploration and Geotechnical Engineering Analysis North Campus Carpentry/R.O.P.E.S. Facility Wilmington, New Hanover County, North Carolina ECS Project No.: 22.16115 1.0 EXECUTIVE SUMMARY T his repot'c contains the results of our subsurface exploration and geotechnical engineering analysis for the proposed site located off of Sidbury Road opposite the existing Landscape Gardening facility in Castle Hayne, New Hanover County, North Carolina. The site was relatively level and there was light vegetation at the site. ECS understands that two structures along with associated parking and driveways and an area for constructing houses will be constructed at the proposed site. The Classroom building is a one- story, approximately 1,900 square foot, stick built wood frame structure supported on a crawl space foundation system. The Carpentry Lab building will be one-story, approximately 2,400 square foot, . pre -fabricated metal building supported on a turn -down slab foundation system. Additional project information was not available at the time this report was prepared. Approximately 4 inches of organic topsoil was reported by the drillers at the boring locations. Beneath the surface to depths of 10 feet below current site grades, the test borings typically encountered intermittent layers of soft to stiff silts and clays (ML, CL, CH) and loose to very dense silty, slightly silty and clean sands (SM, SP-SM, SP). From depths of 10 feet to 15 feet, the test borings typically encountered intermittent layers of very soft to stiff silts and clays (ML, CL, CH). In summary, the proposed structures can be supported on shallow foundations. For foundations designed and constructed in accordance with the recommendations provided in this report, a net allowable soil bearing pressure of 3,000 pounds per square foot (psf) is recommended for use in proportioning shallow foundations. We request that we review our foundation recommendations and make any necessary changes once structural loads and site design grades are determined. Specific information regarding the subsurface exploration procedures used, the site and subsurface conditions at the time of our exploration, and our conclusions and recommendations concerning the geotechnical design and construction aspects of the project are discussed in detail in the subsequent sections of this report. Please note this Executive Summary is an important part of this report and should be considered a "summary" only. The subsequent sections of this report constitute our findings, conclusions, and recommendations in their entirety. Prepared By: Winslow E. Goins, P.E. Project Engineer Reviewed By: Walid M. Sobh, P.E. Principal Engineer APR 1 9 Z01Z Report or Subsurface Exploration and Geotechnical Engineering Analysis North Campus Carpentry/R.O.P.E.S. Facility Wilmington, New Hanover County, North Carolina ECS Project No.: 22.16115 2.0 PROJECT OVERVIEW 2.1 Project information ECS' understanding of the project is based on discussions with representatives of Camp Fear Community College and a site map provided to ECS by Camp Fear Community College. The proposed site is located off of Sidbury Road opposite. the existing Landscape Gardening facility in Castle Hayne, New Hanover County, North Carolina. The site was relatively level and there was light vegetation at the site. ECS understands that two structures along with associated parking and driveways and an area for constructing houses will be constructed at the proposed site. The Classroom building is a one- story, approximately 1,900 square foot, stick built wood frame structure supported on a crawl space foundation system. The Carpentry Lab building will be one-story, approximately 2,400 square foot, pre -fabricated metal building supported on a tum-down slab foundation system. Additional project information was not available at the time this report was prepared. 2.2 Scope of Work The conclusions and recommendations contained in this report are based on the results of: + Four electronic cone penetration. test (CPT) borings, • One hand auger boring and infiltration test, • Engineering analyses of the field findings with respect to the provided project information. 2.3 Purposes of Exploration The purpose of this exploration program was to determine the soil and groundwater conditions at the site and to develop engineering recommendations to assist in the design and construction of the proposed project. We accomplished these objectives by: • Drilling test borings to explore the subsurface soil and groundwater conditions, Analyzing the field data to develop appropriate geotechnical engineering design and construction recommendations. APR 1 9 ZUIZ K Report of Subsurface Exploration and Geotechnical Engineering Analysis North Campus Carpentry/R.O.P.E.S. Facility Wilmington, New Hanover County, North Carolina ECS Project No.: 22.16115 3.0 EXPLORATION PROCEDURES 3.1 Subsurface Exploration Procedures 3.1.1 Cone Penetration Test Borings Four electronic cone penetration test borings were performed during our field exploration. The cone penetration test soundings were performed in general conformance with ASTM D 5778 by our subcontractor. The soundings were performed with a track mounted rig. The cone used in the sounding has a tip area of 10 Cm2 and a sleeve area of 150 cm2. The CPT soundings recorded tip resistance and sleeve friction measurements to assist in determining pertinent index and engineering properties of the site soils. The ratio of the sleeve friction to tip resistance is then used to aid in assessing the soil types through which the tip is advanced. The results of the CPT testing are presented in Appendix A. 3.1.2 Hand Auger Borings and Infiltration Tests On August 27, 2010, one hand auger boring was performed on the site. The purpose of the hand auger boring was to stratify the subsurface soils and estimate the seasonal high water table of the subsurface soils. We evaluated the subsurface soil and ground water conditions by drilling the hand auger borings to depths of approximately 48 inches below the existing ground surface at the approximate location indicated on the Boring Location Plan in Appendix A of this report. We visually classified the subsurface soils on site. At the hand auger location, one infiltration test was performed at a depth of 10 inches below current grade. The results are provided in Section 4.5 and in Appendix E. In the hand auger boring, redoximorphic depletions and concentrations of iron, known as "drainage mottles", are used as soil indicators to estimate the seasonal high water table. These soil indicator features can form in a matter of days in ideal conditions and remain unchanged for decades or more after the water table has changed. APR 9 ZU1Z 3 Report of Subsurface Exploration and Geotechnical Engineering Analysis North Campus Carpentry/R.O.P.E.S. Facility Wilmington, New Hanover County, North Carolina ECS Project No.: 22.16115 4.0 EXPLORATION RESULTS 4A Site Conditions The proposed site is located off of Sidbury Road opposite the existing Landscape Gardening facility in Castle Hayne, New Hanover County, North Carolina. The site was relatively level and there was light vegetation at the site. 4.2 Regional Geolon The site is located in the Coastal Plain Physiographic Province of North Carolina. The Coastal Plain is composed of seven terraces, each representing a former level of the Atlantic Ocean. Soils in this area generally consist of sedimentary materials transported from other areas by the ocean or rivers. These deposits vary in thickness from a thin veneer along the western edge of the region to more than 10,000 feet near the coast. The sedimentary deposits of the Coastal Plain rest upon consolidated rocks similar to those underlying the Piedmont and Mountain Physiographic Provinces. in general, shallow unconfined groundwater movement within the overlying soils is largely controlled by topographic gradients. Recharge occurs primarily by infiltration along higher elevations and typically discharges into streams or other surface water bodies. The elevation of the shallow water table is transient and can vary greatly with seasonal fluctuations in precipitation. 4.3 Soil Conditions CPT Boring: Approximately 4 inches of organic topsoil was reported by the drillers at the boring locations. Beneath the surface to depths of 10 feet below current site grades, the test borings typically encountered intermittent layers of soft to stiff silts and clays (ML, CL, CH) and loose to very dense silty, slightly silty and clean sands (SM, SP-SM, SP). The equivalent corrected standard penetration test resistances (W-values) in these soils generally ranged from 4 to 71 blows per foot (bpf). From depths of 10 feet to 15 feet, the test borings typically encountered intermittent layers of very soft to stiff silts and clays (ML, CL, CH). The equivalent corrected standard penetration test resistances (N*-values) in these soils generally ranged from 2 to 7 blows per foot (bpf). The descriptions provided in this section are a general summary of the subsurface conditions encountered within the CPT and direct push test borings. The Boring Records in Appendix B contain detailed information recorded at each of the boring locations. 4 Report of Subsurface Exploration and Geotechnical Engineering Analysis North Campus Carpentry/R.O.P.E.S. Facility Wilmington, New Hanover County, North Carolina ECS Project No.: 22.16115 4.4 Groundwater Conditions Porewater pressure measurements were made during the drilling operations at the boring location. The groundwater ranged from 4.5 to 4.8 feet below the existing grade. The highest groundwater observations are normally encountered in the late winter and early spring. Variations in the location of the long-term water table may occur as a result of changes in precipitation, evaporation, surface water runoff, and other factors not immediately apparent at the time of this exploration. if long term water levels are crucial to the development of this site, it would be prudent to verify water levels with the use of perforated pipes or piezometers. The relatively shallow groundwater conditions encountered within the boreholes are expected to impact utility excavations. However, this will depend on final site design grades. Regardless, the diversion of surface water should be expected in order to successfully complete site grading activities. 4.5 Seasonal High Water Table and Infiltration Test Results Based on observations in the hand auger boring, the seasonal high water level is estimated to be at the surface at the locations tested. The results of the hand auger boring are summarized below: Location SHWL in Ground Water in Infiltration Rate in/hr SHWT-1 18 36 0.51 Report of Subsurface Exploration and Geotechnical Engineering Analysis North Campus Carpentry/R.O.P.E.S. Facility Wilmington, New Hanover County, North Carolina ECS Project No.: 22.16115 5.0 ANALYSIS AND RECOMMENDATIONS The recommendations provided in this report are based upon our understanding of the proposed construction, the information provided to us during this study and our past experience with similar conditions. Should any of the information provided to us be changed prior to final design, ECS should be notified to review these recommendations and make appropriate revisions, if necessary. 5.1 Subgrade Preparation The first step in preparing the site for the proposed construction should be to remove all vegetation, rootmat, topsoil, deleterious materials, existing pavement, foundations, utilities, and any other soft or unsuitable materials from the existing ground surface. These operations should extend at least 10 feet, where possible, beyond the planned limits of the proposed building and pavements. After proper clearing, stripping, grubbing, and prior to fill placement, foundation, slab, or pavement construction, the exposed subgrade soils should be carefully evaluated by an experienced geotechnical engineer to identify any localized unstable -or otherwise unsuitable materials. After evaluating the exposed soils, proofrolling using a smooth drum vibratory roller, having an axle weight of at least 10 tons, is suggested to be used at this time to aid in identifying localized soft or unsuitable material which should be removed. The vibratory proofrolling will also help densify the upper exposed subgrade soils. During this process, it may be necessary to allow groundwater brought to the surface during densification to recede prior to continued densification or subsequent fill placement. Any soft or unsuitable materials identified during proofrolling operations should be either repaired in -place or removed and replaced with an approved backfill placed and compacted in accordance with recommendations of this report. Site subgrade conditions will be significantly influenced by weather conditions. Subgrades that are evaluated after periods of rainfall will not respond as well to proofrolling as subgrades that are evaluated after periods of more favorable weather. We strongly recommend that rubber tire equipment not be used if subgrade conditions exhibit elevated moisture conditions. The contractor should use tracked equipment to minimize the degradation of marginally stable subgrade. The preparation of fill subgrades, as well as proposed building subgrades, should be observed on a full-time basis by a representative of ECS. These observations should be performed by an experienced geotechnical engineer, or his representative, to ensure that all unsuitable materials have been removed and that the prepared subgrade is suitable for support of the proposed construction and/or fills. APR 1 9 ZU1Z Report of Subsurface Exploration and Geotechnical Engineering Analysis North Campus Carpentry/R.O.P.E.S. Facility Wilmington, New Hanover County, North Carolina ECS Project No.: 22.16115 5.2 Engineered Fill Placement Following the removal of deleterious surface and subsurface materials, and after achieving a stable subgrade, engineered fills can be placed and compacted to achieve the desired site grades. All fill for support of the proposed construction and for backfill of utility lines within expanded building and pavement limits should consist of an approved material, free of organic matter and debris and cobbles greater than 3 inches, and have a Liquid Limit (LL) and Plasticity Index (PI) less than 40 and 20, respectively. We also recommend that all fills within structural areas have a standard Proctor (ASTM D 698) maximum dry density of at least 100 pounds per cubic foot (pcf). Unsuitable fill materials include topsoil, organic materials (OH, OL), and high plasticity clays and silts (CH, MH). All such materials removed during grading operations should be either stockpiled for later use in landscape fills, or placed in approved on or off -site disposal areas. Existing soils containing significant amounts of organic matter will not be suitable for re -use as engineered fill. As such, the organic content of the near surface cultivated soils should be evaluated to determine if some of these soils will be suitable for re -use as engineered fill. Natural fine-grained soils classified as clays or silts (CL, ML) with LL and PI greater than 40 and 20, respectively, should be evaluated by the geotechnical engineer at the time of construction to determine their suitability for use as engineered fill. Prior to the commencement of fill operations and/or utilization of any off -site borrow materials, the contractor should provide representative samples of the proposed fill soils to. the geotechnical engineer. The geotechnical engineer can determine the material's suitability for use as an engineered fill and develop moisture -density relationships in accordance with . the recommendations provided herein. Samples should be provided to the geotechnical engineer at least 3 to 5 days prior to their use in the field to allow for the appropriate laboratory testing to be performed. Fill materials placed within the building and pavement areas should be placed in lifts not exceeding 8 inches in loose lift thickness and moisture conditioned to within their working range of optimum moisture content. The fills should then be compacted to a minimum of 95 percent of the soil's standard Proctor (ASTM D 698) maximum dry density to within 12 inches below finished subgrade. The upper 12 inches of fills placed beneath structural development should be compacted to 98 percent of the soil's standard Proctor maximum dry density. The typical working range of optimum moisture for the natural Coastal Plain soils at the site is expected to be within approximately 3 percent of the optimum moisture content. Care should also be taken to provide a smooth, gently sloping ground surface at the end of each days earthwork activities to help reduce the potential for ponding and absorption of surface water. Grade controls should also be maintained throughout the filling operations. All filling operations should be observed on a full-time basis by a qualified representative of ECS to determine that the required degrees of compaction are being achieved. We recommend that a minimum of one compaction test per 2,000-square-foot area be performed for each lift of controlled fill. The elevation and location of the tests should be clearly identified at the time of fill placement. Areas which fail to achieve the required degree of compaction should be re -worked until the specified degree of compaction is achieved., Failing test areas may require moisture adjustments or other suitable remedial activities in order to achieve the required compaction. 7 ►rK 1 9 Z01Z Report of Subsurface Exploration and Geotechnical Engineering Analysis North Campus Carpentry/R.O.P.E.S. Facility Wilmington, New Hanover County, North Carolina ECS Project No.: 22.16115 Fill materials should not be placed on frozen, frost -heaved, and/or soils which have been recently subjected to precipitation. All wet or frozen soils should be removed prior to the continuation of site grading and fill placement. Borrow fill materials, if required, should not contain excessively wet or frozen materials at the time of placement. Additionally, if grading operations occur during the winter months, all frost -heaved soils should be removed prior to placement of engineered fill, granular sub -base materials, foundation or slab concrete, and asphalt pavement materials. If problems are encountered during the site grading operations, or if the actual site conditions differ from those encountered during our subsurface exploration, the geotechnical engineer should be notified immediately. 5.3 Foundations Recommendations Provided the subgrade preparation and earthwork operations are completed in strict accordance with the recommendations of this report, the proposed construction can be supported on conventional shallow foundations bearing on approved natural materials and/or properly compacted fill. We recommend a net allowable design soil bearing pressure of 3,000 psf for proportioning continuous and isolated column footings. To reduce the possibility of foundation bearing failure and excessive settlement due to local shear or "punching" failures, we recommend that continuous footings have a minimum width of 18 inches and that isolated column footings have a minimum lateral dimension of 30 inches. Furthermore, all footings should bear at a depth to provide adequate frost cover protection. For this region, we recommend the bearing elevation be a minimum depth of 12 inches below the finished exterior grade. We request the opportunity to review our foundation recommendations. and make any necessary changes once structural loads and site design grades are determined. The net allowable soil bearing pressure refers to that pressure which may be transmitted to the foundation bearing soils in excess of the final minimum surrounding overburden pressure. The final footing elevation should be evaluated by ECS personnel to verify that the bearing soils are capable of supporting the recommended net allowable bearing pressure and suitable for foundation construction. These evaluations should include visual observations, hand rod probing, and dynamic cone penetrometer (ASTM STP 399) testing, or other methods deemed appropriate by the geotechnical engineer at the time of construction, in each column footing excavation and at intervals not greater than 20 feet in continuous footing excavations. The settlement of a structure is a function of the compressibility of the bearing materials, bearing pressure, actual structural loads, fill depths, and the bearing elevation of footings with respect to the final ground surface elevation. Estimates of settlement for foundations bearing on engineered or non -engineered fills are strongly dependent on the quality of fill placed. Factors which may affect the quality of fill include maximum loose lift thickness of the fills placed and the amount of compactive effort placed on each lift. We expect that total settlements for the proposed construction are expected to be in the range of 1 inch or less, while the differential settlement will be approximately %2 of the anticipated total settlement. This evaluation is based on our engineering experience and assumed structural loadings for this type of structure, and is intended to aid the structural engineer with his design. APR 1 9 z01z Report of Subsurface Exploration and Geotechnical Engineering Analysis North Campus Carpentry/R.O.P.E.S. Facility Wilmington, New Hanover County, North Carolina ECS Project No.: 22.16115 5.4 Floor Slab Desion Provide a suitable subgrade will be prepared as recommended 'herein, ground level slabs can be designed as slabs -on -grade. Our findings indicate that a modulus of subgrade reaction (ks) of 150 pci is appropriate for design provided that upper 12 inches of the slab subgrade soils have been uniformly compacted to at least 98 percent of their standard Proctor maximum dry density. We recommend that all slabs -on -grade be isolated from the foundations so that potential differential settlement of the structure will not induce shear stresses in the floor slab. Also, to minimize the crack width of any shrinkage cracks that.may develop near the surface of the slab, wire mesh reinforcement may be included in the slab design. The mesh should be located in the top third of the slab to be effective. We also recommend that all slabs -on -grade be underlain by a minimum of 6 inches of open graded aggregate to help prevent the capillary rise of subsurface moisture from adversely affecting the slab. If open graded aggregate is not avaiia.bie, clean sand with less than 3 percent fines can be used provided the placement and compaction of the sand complies with the above recommendations. If floor covering such as tile or carpet will be utilized for interior finishes, a polyethylene vapor barrier may be used beneath the floor slab for moisture control considerations. 5.5 Site Drainage Positive drainage should be provided around the perimeter of the structure to minimize the potential for moisture infiltration into the foundation and slab subgrade soils. We recommend that landscaped areas adjacent to these structures be sloped away from the construction and maintain a fall of at least 6 inches for the first 10 feet outward from the structures. The parking lots, sidewalks, and any other paved areas should also be sloped to divert surface water away from the proposed building. The proper diversion of surface water during site grading and construction will help reduce the potential for delays associated with periods of inclement weather. The proper diversion of surface water is especially critical since portions of the site soils are expected to be moisture sensitive. Rased upon our past experience, the use of "crowning„ large areas of exposed soils should be useful to help divert surface water from the prepared subgrades. 5.6 Construction Considerations It is imperative to maintain good site drainage during earthwork operations to help maintain the integrity of the surface soils. The surface of the site should be kept properly graded to enhance drainage of surface water away from the proposed construction areas during the earthwork phase of this project. We recommend that surface drainage be diverted away from the proposed building and pavements areas without significantly interrupting its flow. Other practices would involve sealing the exposed soils daily with a smooth -drum roller at the end of the day's work to reduce the potential for infiltration of surface water into the exposed soils. APR 1 9 Z01Z Report of Subsurface Exploration and Geotechnical Engineering Analysis North Campus Carpentry/R.O.P.E.S. Facility Wilmington, New Hanover County, North Carolina ECS Project No.: 22.16115 The key to minimizing disturbance problems with the soils is to have proper control of the earthwork operations. Specifically, it should be the earthwork contractor's responsibility to maintain the site soils within a workable moisture content range to obtain the required in -place density and maintain a stable subgrade. Scarifying and drying operations should be included in the contractor's price and not be considered an extra to the contract. In addition, construction equipment cannot be permitted to randomly run across the site, especially once the desired final grades have been established. Construction equipment should be limited to designated lanes and areas, especially during wet periods to minimize disturbance of the site subgrades. It will likely be necessary to utilize tracked equipment during grading operations particularly if the subgrade soils exhibit elevated moisture conditions. 10 E�,NIt 9 ZO1Z Report of Subsurface Exploration and Geotechnical Engineering Analysis North Campus Carpentry/R.O.P.E.S. Facility Wilmington, New Hanover County, North Carolina ECS Project No.: 22.16115 6.0 CLOSING Our geotechnical evaluation of the site has been based on our understanding of the site, the project information provided to us, and the data obtained during our exploration. The general subsurface conditions utilized in our evaluations have been based on interpolation of subsurface data between the borings. If the project information provided to us is changed, please contact us so that our recommendations can be reviewed and appropriate revisions provided, if necessary. The discovery of any site or subsurface conditions during construction which deviate from the data outlined in this exploration should be reported to us for our evaluation. The assessment of site environmental conditions for the presence of pollutants in the soil and groundwater of the site was beyond the scope of this geotechnical exploration. 11 APR 1 9 Z01Z APPENDICES APR 1 9 zuiz APPENDIX A SITE MAP APR 1 9 ZOIZ r- O - 0 fMnCoM zQO zn ZM,z -n 20 z -n )D x -a Ail 0 r z >. x z CIA C7 BORING LOCATION DIAGRAM H 4z r-049 H-O Erl U AZINI L%7? APR 1 9 2012 ENGINEER I SCALE EG N. Campus Carpentry DRAFTSMAN IPPOJECTNO . NTS WE& 22.16115 R.O.P.E.S. Facility REVISIONS I SHEET -rH —.-r0%fQx>^ftM s8 1 Wilmington, North Carolina FOR -%M%1zCE APPENDIX B CPT BORING LOG APR 1 9 2012 F oI Q W r O CE cl c 3dAi �... _'' sC O 1-101AdH38 Dios 1 R t 2 Iwo " o CO O T o T `° o O = C. ` O W u O tl�! .FJ 7 L Q E fa da CL — ■ zlu — CL W u a cc torte O U. L� W o *+ fq _ W coN LL N I .�• '8 i JU. ■ B H ■ Z O Cl " I —y- O-o9 CLL L E: = V, C1 cc 10 V V I, c l O CD d W O O N iD OD O N iD Hld3a e Q APR 1 9 ZUIZ - - f 'o ¢ I O N p w W Z�= CE C W W o N a C R E 3dAl „•:. err.. �.. _ .::tax' '�-'1SS` '.r. - ' _ _ —— d ID r w �oiAVH3a - — - Iios ^ ^ ' — O > r N to Z C -4- 4 - --t--- ■ ■ .� 0 _ 0 =—I-�— -I—i-- U- C. a=uj W O 0 CD N o O w p W C Go I Q L Tj =� p w! • V ,Z O mW 0 cc a + V O _ W W V r N cq (7 m N 12 V (!i L L >+ w Nl N -0 li y III I I $� 0 E W 0 o Lo CIAF. ez o�3LL—� _L — —=I — _ P I E m O FJ' H1d3O e i APR 1 9 ZU1Z i R R u' L 0 CO O C Z _ c g o z m a c E 'y0-, Z Cc N o J 2 C) ■U LL (6 a M W to Oo ! N LL ~ *0 Q. L 3 a 0 o E cc 1 M�� t7 r 10 InN Z L N d .0 LEioF Q i Z d Q'o o{0 3 IL 3du = — WIAV 38 = liosCD = L L LI m —L — L -i — I— m L 0 r d -TTITT I —TT— I— T in co ma —} LL LL OLL J O O O 0 V I . U. I r— T —I — r T 0 O r N M le O 10 1- co 0 ClW) r Hld3a I rn co 0) ■ t t APR 1 9 ZUIZ I. I Y Q W of APR 1 9ZOiZ APPENDIX C INFILTRATION TESTING FORM APR 1 9 ZU1Z Infiltration Testing Form Cape Fear Community College Wilmington, New Hanover County; North Carolina ECS Project No. 22.1 61 15 August 27, 2010 Location Depth Soil Description 1 0-12" Dark gray silty SAND 12"-48" White/gray/orange fine SAND w/silt Seasonal High Water Table was estimated to be at 18 inches below the existing grade elevation. Infiltration Rate: 0.51 inches per hour Test was conducted at 10 inches below existing grade elevation Groundwater was encountered at 36 inches below the existing grade elevation. AFR 1 9 ZOIZ APPENDIX D GENERAL CONDITIONS APR 1 9 207 General Conditions The analysis, conclusions, and recommendations submitted in this report are based on the investigation previously outlined and the data collected at the points shown on the attached location plan. This report does not reflect specific variations that may occur between test locations. The borings were located where site conditions permitted and where it is believed representative conditions occur, but the full nature and extent of variations between borings and of subsurface conditions not encountered by any boring may not become evident until the course of construction. If variations become evident at any time before or during the course of construction, it will be necessary to make a re-evaluation of the conclusions and recommendations of this report and further exploration, observation, and/or testing may be required. This report has been prepared in accordance with generally accepted soil and foundation engineering practices and makes no other warranties, either expressed or implied, as to the professional advice under the terms of our agreement and included in this report. The recommendations contained herein are made with the understanding that the contract documents between the owner and foundation or earthwork contractor or between the owner and the general contractor and the caisson, foundation, excavating and earthwork subcontractors, if any, shall require that the contractor certify that all work in connection with foundations, piles, caissons, compacted fills and other elements of the foundation or other support components are in place at the locations, with proper dimensions and plumb, as shown on the plans and specifications for the project. Further, it is understood the contract documents will specify that the contractor will; upon becoming aware of apparent or latent subsurface conditions differing from those disclosed by the original soil investigation work, promptly notify the owner, both verbally to permit immediate verification of the change, and in writing, as to the nature and extent of the differing conditions and that no claim by the contractor for any conditions differing from those anticipated in the plans. and specifications and disclosed by the soil studies will be allowed under the contract unless the contractor has so notified the owner both verbally and in writing, as required above, of such changed conditions. The owner will, in turn, promptly notify this firm of the existence of such unanticipated conditions and will authorize such further investigation as may be required to properly evaluate these conditions. Farther, it is understood that any specific recommendations made in this report as to on -site construction reviEfw by this firm will be authorized and funds and facilities for such review will be provided at the times recommended if we are to be held responsible for the design recommendations. APR 1 9 ZGIZ STORMWATER NARRATIVE CFCC NORTH CAMPUS - CARPENTRY FACILITY NEW HANOVER, NORTH CAROLINA For Cape Fear Community College 411 North Front Street Wilmington, NC 28401 910-362-7004 CA/to 10 April, 2012 Prepared by: URBAN, LTD. 108 North Kerr Avenue, Suite K-1 Wilmington, North Carolina 28405 (910) 395-1655 (910) 395-1451 (Fax) APR 1 9 Z01Z STORMWATER NARRATIVE SITE DESCRIPTION: The total tract (Parcel R01800-004-001-003) area is 29.76 acres and is one of the eight (8) parcels comprised of the Cape Fear Community College (CFCC) North Campus property. It is located off Sidbury Road in Castle Hayne, New Hanover County, North Carolina. The site is bounded by Sidbury Road to the north; 1-40 to the east; and institutional and vacant uses to the south and west. The site is located in a special 100- year flood hazard area. The site is nearly level sandy, poorly drained soils. The site has 13.13 acres of wetlands. A jurisdictional determination has been completed by the USACOE. PROJECT DESCRIPTION: The proposed project will consist of an existing asphalt parking and access area, clearing, grading, the construction of two (2) buildings, asphalt and gravel parking and access, closed conduit storm water collection system, wet detention basin, sanitary sewer force main and lift station (by others) and well (by others). The disturbed area is approximately 2.90 acres. STORMWATER MANAGEMENT MEASURES: The project drainage area is 1.35 acres and the total amount of impervious area is 55.87%. The site is proposed as high density and the primary stormwater measure is a wet detention basin. The stormwater will be conveyed via overland sheet flow and a closed conduit system to the wet detention basin. The wet detention basin is adequately engineered to control and treat the stormwater runoff from all impervious surfaces generated by 1 Y2" of rainfall. This volume will draw down within 2-5 days. The wet detention basin also detains the 2-, 10-, and 25-year rain event at or below the pre -developed discharge rate. The project drains to the Cape Fear River Basin through an unnamed tributary to Prince George Creek which has a C;Sw classification and stream index no. i8-74-53. There is no direct discharge from impervious surfaces to a watercourse. APR 1 9 "1012 .� PLANNERS RED+ M APR 1 2 012 ENGINEERS urban, ���JJJ ARCHITECTS LANDSCAPE 0.`T LAND SURVEYORS TO: I" r/Y°' DATE: Lo L(LOA JOB #: 16- S w t I + V)jfe j , f ft 1(_ z �k PRINT TICKET #: ATTN: ❑ ORIGINALS ❑ SPECIFICATIONS ❑ COLOR PRINTS RE: (�L 1�&�.ILIL S l TRANSMITTED HEREWITH: C. � f—OLU 4 If ' l ❑ PHOTOCOPIES ❑ CD 9BLACKLINE PRINTS ❑ COMPUTATIONS ❑ INVOICE ❑ MYLAR PRINTS ❑ SITE NOTICES ❑ OTHER QUANTITY DRAWING NO. DATE DESCRIPTION 2. C2 P— o ��L or FOR: SUBMISSION ❑ FIELD USE SENT BY ❑ FIRST CLASS MAIL PLEASE: ❑ RETURN COMMENTS: RECEIVED ❑ RESUBMISSION ❑ YOUR FILES OUR MESSENGE ❑ SUBMIT SENT BY: 11PI c ❑ OVERNIGHT Urban, Ltd. 108 N. KerPenue, Suite K 1, Wilmington, North Carolina 28405 PH 910.395.1655 WWW.urban-ltd.com Annandale, VA Chantilly, VA Wilmington, NC Winchester, VA PLANNERS ENGINEERS - urban, LANDSCAPE ARCHITECTS p 2 LAND ISURVEYORS TO: �►y® DATE: 64-11 q So 12 JOB #: 16 A PRINT TICKET #: ATTN: 11i(�GI+ RE' dV`I '' ` S TRANSMITTED HEREWITH: r 6iCi 41 ❑ ORIGINALS ❑ PHOTOCOPIES ❑ CD Y-BLACKLINE PRINTS ❑ SPECIFICATIONS ❑ COMPUTATIONS ❑ INVOICE ❑ MYLAR PRINTS ❑ COLOR PRINTS ❑ SITE NOTICES V OTHER QUANTITY DRAWING NO. DATE DESCRIPTION 2- '59- 1 4()s 04 f r4jui 4; i f-t P 6, �Y ovil a n rr mAw�eAr- �nrw�k PPjc�-h`�x w 17.E A'e'�i FOR: SUBMISSION ❑ FIELD USE SENT BY ❑ FIRST CLASS MAIL PLEASE: ❑ RETURN COMMENTS: RECEIVED Bl� ❑ RESUBMISSION ❑ INSERTS ❑ YOUR FILES ❑ COMMENTS "'X*' OUR MESSENGER ❑ SUBMIT ❑ APPROVAUSIGNATURE ❑ OTHER ❑ PICKUP ❑ COURIER ❑ OVERNIGHT ❑ OTHER APR 1 9 Z01Z Urban, Ltd. 108 N. Kerr Avenue, Suite K 1, Wilmington, North Carolina 28405 PH 910.395.1655 www.urban-ltd.com Annandale, VA Chantilly, VA Wilmington, NC Winchester, VA TO: NO na urban,.. I I mtb"(L DATE: L1,0 lu 12 JOB #: � o —05 PRINT TICKET #: 9 4'71"o IOU� l w� f�� t� L 294 � PLANNERS ENGINEERS LANDSCAPE ARCHITECTS LAND SURVEYORS ATTN: ` Q RE: � jU�jY- k5 1 -� TRANSMITTED HEREWITH: ❑ ORIGINALS ❑ PHOTOCOPIES ❑ CD BLACKLINE PRINTS ❑ SPECIFICATIONS ❑ COMPUTATIONS ❑ INVOICE ❑ MYLAR PRINTS ❑ COLOR PRINTS ❑ SITE NOTICES y OTHER QUANTITY DRAWING NO. DATE DESCRIPTION 2- sP- I o c u ktof 5 � FOR: SUBMISSION ❑ RESUBMISSION ❑ INSERTS ❑ APPROVAL/SIGNATURE ❑ FIELD USE ❑ YOUR FILES ❑ COMMENTS ❑ OTHER SENT BY: ❑ FIRST CLASS MAIL *PUR MESSENGER El PICKUP ❑ COURIER ❑ OVERNIGHT PLEASE: ❑ RETURN � ❑ SUBMIT ❑ OTHER COMMENTS: Mn PA 18 n APR 1 9 Z012 RECEIVED BY.6 Urban, Ltd. 108 N. Kerr Avenue, Suite K 1, Wilmington, North Carolina 28405 PH 910.395.1655 www.urban-ltd.com Annandale, VA Chantilly, VA Wilmington, NC Winchester, VA STATE OF NORTH CAROLINA Department of Environment and Natural Resources WIRO.Regional Office FILE ACCESS RECORD! i p SECTION SWP ggUq Q DATE/TIME NAME _4Z1L !�\ REPRESENTING Guidelines for Access: The staff of the Regional Office is.dedicated to making public recordsin our custody readily available to the public for review and copying. We also have the responsibility to the public to safeguard these records and to carry out our day-to-day program obligations. Please. read carefully the following before signing the form. I. Due, to the large public demand.for file a�ccesti, we request th.at yo4rcall-at least a day in advance to schedule an appointment for file review so you- can be accommodated. Appointments are scheduled between 9:00 a.m. and 3:00 P.m. Viewing time ends at 4 45 p.m. Anyone arriving without an appointment may view the files to the extent that time and staff supervision are available. 2. You must specify files you want to review by facility name or incident number, as appropriate. The number of files that you may review at one appointment will be limited to five. -3. - You may make copies of a file when the copier is not in use by the staff and if time permits. There is no charge for 25 or less copies cost oer copy after the initial 25 is 2.5 per copy, Payment is to be made by check, money order, or cash in the administrative offices. 4. Files must be kept in the order you received them. Files may not be taken from the office. No briefcases, large totes, etcare permitted in the file review area To remove, alter; deface, mutilate, or destroy material in public files is a misdemeanor for which you can be fined up to $500.00.. 5. in accordance with GS 25-3-512, a $25.00 processing fee will be charged and collected for checks on which payment has been refused. 6. The customer must present a photo ID, sign -in, and receive a visitor sticker'prior to reviewing files. FACILITY NAME COUNTY 1.tn 3 6QUal�c 2. 3. 4. 5. 5 Signature/Name of Firm or Business Date Time In Time Out (Please attach business card to form if available) Copos�- Amt. Rd: ARA North Carolina Department of Environment and Natural Resources NCDENR Request for Express Permit Review Sco?e.' For DENR Use ONLY Reviewer. .ice L— 41!+ Submit: 4 20 Time: 1\, Confirm FILL-IN all the information below and CHECK the Permit(s) you are requesting for express review. FAX or Email the completed form to Express Coordinator along with a completed DETAILED narrative, site Plan (PDF rile) and vicinity map (same items expected in the analication Package of the prmjov. location. Plena include this form in the application package. • Asheville Region Anson Davidson 828-2964698;alison.davidsonglncdenro2v • Fayetteville or Raleigh Region -David Lee 919-7914203, david lee®ncdenr clov • Mooresville & -Patrick Grogan 704-663-3772 or Patrick arogandbIncdenr aov • Washington Region -Lyn Hardison 252-946-9215 or Itm.hardison®Acdenraov • Wilmington Region -Janet Russell 910-350-2004 or tenet russ91MIncdenr aov NOTE. Project application received after 12 noon will be stamped in the following work day. Permits of reauest SW SW SW SW SW 06e,prc-, Project Name: CFCC NORTH CAMPUS CARPENTRY FACILITY County: NEW HANOVER Applicant: KEN PEARCE Company: CAPE FEAR COMMUNITY COLLEGE Address: 411 NORTH FRONT STREET City: WILMINGTON. State: NQ Zip: 28401-_ Phone: 910-362- 5�5`i Fax: 910-362-7046, Email: kwarce@cfcc.edu Physical Location:5000 SIDBURY ROAD Project Drains into UT PRINCE GEORGE CREEK waters - Water classification C SW (for classification see- httD:/lh2o.enr.state.nc.uslbims/reoortslrenortsW6 html) Project Located in CAPE FEAR River Basin. Is project draining to class ORIN waters? N , within % mile and draining to class SA waters N or within 1 mile and draining to class HQW waters? N Engineer/Consultant: MONICA LOUGHLIN Company: URBAN, LTD. Address:108 NORTH KERR AVENUE SUITE K-1 City: WILMINGTON, State: NC Zip: 28405-_ Phone: M-L95--1655 Fax: 9,-*39LI4�51, Email: mlouahlin@y-rkn—lid.com SECTION ONE: REQUESTING A SCOPING MEETING ONLY APR 0 7 2011 9� Scoping Meeting ONLY ❑ DWQ, ❑ DCM, ❑ DLR, ❑ OTHER: SECTION TWO: CHECK ONLY THE PROGRAM IS) YOU ARE REQUESTING FOR EXPRESS PERMITTING ❑ 401 Unit ❑ Stream Origin Determination: _ # of stream calls - Please attach TO1 ❑ IntermittentlPerennial Determination: _ # of stream calls - Please attach TOPO mat ❑ 401 Water Quality Certification ❑ Isolated Wetland L ❑ Riparian Buffer Authorization ❑ Minor Variance ❑ I ® State Stormwater ❑ General ❑ SFR, ❑ SFR < 1 ac. ❑Bkhd & Bt R ❑ Low Density ❑ Low Density -Curb & Gutter _ # Curb Outlet Swales ❑ ® High Density -Detention Pond 1 # Treatment Systems ❑ High Density-Infiltrai ❑ High Density -Blo-Retention _ # Treatment Systems ❑ High Density -SW A ❑ High Density -Other _ # Treatment Systems / ❑ MOD: El Major ❑ Minor ❑ Pla ❑ Coastal Management ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Upland Development ❑ Marina Developmen ® Land Quality ® Erosion and Sedimentation Control Plan with _ acres to b SECTION THREE -.PLEASE CHECK ALL THAT IS APPLICABLE TO YOUR PROJEC Wetlands on Site ® Yes ❑ No Wetlands Delineation has been completed: ® Yes ❑ No US ACOE Approval of Delineation completed: ® Yes ❑ No Received from US ACOE ® Yes ❑ No For DENR use Fee Split for mulGDie Dermits: (Check # 1 GFGL Norm Buffer Impact; Isolated wetia 404 Application in Process w/ US ACOE .-0 00roNpAks : ❑ Yes ❑ No Permit - SUBMITTAL DATES Fee SUBMITTAL DATES Fee CAMA $ Variance (❑ Ma); ❑ Min) $ SW ( HD, LD, ❑ Gen) $ 401: 1 $ LQS $ Stream Deter,_ $ NCDENR EXPRESS March 2009 STORMWATER NARRATIVE SITE DESCRIPTION: The total tract (Parcel R01800-004-001-003) area is 29.76 acres and is one of the eight (8) parcels comprised of the Cape Fear Community College (CFCC) North Campus property. It is located off Sidbury Road in Castle Hayne, New Hanover County, North Carolina. The site is bounded by Sidbury Road to the north; 1-40 to the east; and institutional and vacant uses to the south and. west. The site is located in a special 100-year flood hazard area. The site is nearly level sandy, poorly drained soils. The site has 13.13 acres of wetlands. A jurisdictional determination has been completed by the USACOE. PROJECT DESCRIPTION: The project is located on the high density CFCC North Campus property already permitted under SW8 990923. The existing referenced permit will be modified to add a separate high density stormwater treatment device. The proposed project will consist of an existing asphalt parking and access area, clearing, grading, the construction of two (2) buildings, asphalt and gravel parking and access, closed conduit storm water collection system, wet detention basin, sanitary sewer septic system (by others) and well (by others). The disturbed area is approximately acres. STORMWATER MANAGEMENT MEASURES: The project drainage area is 1.6 acres and the total amount of impervious area is 47.12%. The site is proposed as high density and the primary stormwater measure is a wet detention basin. The stormwater will be conveyed via overland sheet flow and a closed conduit system to the wet detention basin. The wet detention basin is adequately engineered to control and treat the stormwater runoff from all impervious surfaces generated by 1 W of rainfall. This volume will draw down within 2-5 days. The wet detention basin also detains the 2-, 10-, and 25-year rain event at or below the pre -developed discharge rate. The project drains to the Cape Fear River Basin through an unnamed tributary to Prince George Creek which has a C;Sw classification and stream index no. 18-74-53. There is no direct discharge from impervious surfaces to a watercourse. N rs ! 8 F .N- ----_-' --- __--__fIY 4f ------ � '• _�,y� _ — --`_ - =------- ._____ ]dpYa YOY i�Y dIID1� d9 µ . ONE w+ Imo-------- ---' '-;� 71 r-c'.p.ba 1K''��R_ '�1 --- 8 1 s - l\\ .1 0 c- (AtVA Z15 \!4 0. ; 1 i am* p 1 ` - f F • I ,qN't fdMn'gn I ------ WAS • PY•Y \\ \ ___� '�-- -'d '-- , � 1' � _ � •} AS���-� ' �f-/:'M�� -\ -mob``\ 4 _. r• _' (`\ . - . W:MNO lK TAiYI iYdl YAP IIIYNPW YY 6q.' . . API p® ` • • NL,L1,• YM PAEPM . II =I- \I894Ff1 n _YEn�WxDs Wm �. `� �+ • V'�`�vy 11\ Y�C�' 1®\W NOl 9PlFp BY WXPS~� GRAZE J2J1 \ 65 V • "y~�• �� EX CL INV.GRA M3. \\ --t ,igf. ; d.S' s APR 0 7 Z011 Russell, Janet From: Loughlin, Monica [mloughlin@urban-Itd.com] Sent: Thursday, April 07, 2011 3:04 PM To: Russell, Janet Subject: CFCC North Campus - Carpentry Facility Attachments: Express Request Form.pdf; SW Narrative.pdf: Vicinity Map.pdf Good Afternoon Janet — I would like to schedule a pre application meeting for express review of stormwater and erosion control on the subject project (request, narrative, vicinity map attached). You will note that the disturbed area is blank at this time. We are waiting for the septic and well consultant to give us there final design so that we can include this area in the limits of disturbance, but we wanted to get the ball rolling with a meeting date. People tend to schedule last minute meetings for Ken Pearce, our client, so let me know a day and time at your earliest convenience: A few available dates as this moment are below. Thank you. Thursday, April 14th 8:00 —11:00 and 2:00 — 4:00 Friday, April 15t" any time Monday, April 18th any time Tuesday, April 19th 1:00 — 4:00 Wednesday, April 201h 8:00 — 2:00 Thursday, April 21 Bt 1:00 — 4:00 Monica V. Loughlin, EI Project Manager I - Nob Urban, Ltd. 108 North Herr Avenue; Suite S-1 Wilmington, NC 28408 Tel: 910.398.1685 ext. 227 Toll Free: 866.642.8040 Fax: 910.398.1481 Email: mlouahHn(cDurban-ltd com Web: www.urban-ltd.com STATE OF NORTH CAROLINA Department of Environment and Natural Resources WIRO Regional Office FILE ACCESS RECORD SECTION SWP DATE/TIME NAME �� �/� <<ty�� REPRESENTING �C� `` �/C'�' 29 Guidelines for Access: The staff of the Regional Office is dedicated to making public records in our custody readily available to the public for review and copying. We also have the responsibility to the public to safeguard these records and, to carry out our day-to-day program obligations. Please read carefully the following before signing the form. 1. Due to the large public demand for file access, we request that you call at least a day in advance to schedule an appointment for file review so you can be accommodated. Appointments are scheduled between 9:00 a.m. and 3:00 p.m. Viewing time ends at 4:45 p.m. Anyone arriving without an appointment may view the files to the extent that time and staff supervision are available. 2.. You must specify files you want to review by facility name or incident number, as appropriate. The number of files that you may review at one appointment will be limited to five. . 3. You may make copies of a file when the copier is not in use by the staff and if time permits. There is no charge for 25 or less copies • cost per copy after the initial 25 is 2.5 per copy. Payment is to be made by check, money order, or cash in the administrative offices. 4. Files must be kept in the order you received them. Files may not be taken from the office. No briefcases, large totes, etc. are permitted in the file review area To remove, alter, deface, mutilate, or destroy material in public files is a misdemeanor for which you can be fined up to $500.00. 5. In accordance with GS 25-3-512, a $25.00 processing fee will be charged and collected for checks on which payment has been refused. 6. The -customer must present a photo ID, sign -in, and receive a visitor sticker prior to reviewing files. FACILITY NAME 2. 3. 4. 5. 16 it wig re/Name of Firm or Business Date (Please attach business card to form if available) # Copes: Amt. Pd: COUNTY /?•C/0- /: /P Time In Time Out STATE OF NORTH CAROLINA Department of Environment and Natural Resources WIRO Regional Office /�.. FILE ACCESS RECORD SECTION SWP DATE/TIME /'////� NAME �d,,e-4e REPRESENTING G �� Guidelines for Access: The staff of the Regional Office is dedicated to making public records in our custody readily available to the public for review and copying. We also have the responsibility to the public to safeguard these records and to carry out our day-to-day program obligations. Please read carefully the following before signing the form. 1. Due to the large public demand for file access, we request that you calf at least a day in advance to schedule an appointment for file review so you can be accommodated. Appointments are scheduled between 9:00 a.m. and 3:00 p .m Viewing time ends at 4:45 p.m. Anyone arriving without an appointment may view the files to the extent that time and staff supervision are available. 2. You must specify files you want to review by facility name or incident number, as appropriate. The number of files that you may review at ore appointment will be limited to five. . 3. You may make copies of a file when the copier is not in use by the staff and if time permits. Payment is to be made by check, money order, or cash in the administrative offices. 4. Files must be kept in the order you received them. Files may not be taken from the office. No briefcases, large totes, etc. are permitted in the file review area To remove, alter, deface, mutilate, or destroy material in public files is a misdemeanor for which you can be fined up to $500.00. 5. In accordance with GS 25-3-512, a $25.00 processing fee will be charged and collected for checks on which payment has been refused. 6. The -customer must present a photo ID, sign -in, and receive a visitor sticker prior to reviewing files. FACILITY NAME f -- 2. 4. 5, Signature ame of Firm or B s ss Date (Please attach business card to form if available) t yam, # Copes: Amt. Pd: COUNTY �: ¢:• L Time In Time Out STATE OF NORTH CAROLINA Department of Environment and Natural Resources WIRO Regional Office FILE ACCESS RECORD SECTION SWP DATE/TIME NAME A/ ,/ et 49`�%� << ^J REPRESENTING 5-;�-ll5'. e-�x-/ -­P ---77 Guidelines for Access: The staff of the Regional Office is dedicated to making public records in our custody readily available to the public for review and copying. We also have the responsibility to the public to safeguard these records and to carry out our day-to-day program obligations. Please read carefully the following before signing the form. 1. Due to the large public demand for file access, we request that you call at least a day in advance to schedule an appointment for file review so you can be accommodated. Appointments are scheduled between 9:00 a.m. and 3:00 p.m. Viewing time ends at 4:45 p.m. Anyone arriving without an appointment may view the files to the extent that time and staff supervision are available. 2.. You must specify files you. want to review by facility name or incident number, as appropriate. The number of files that you may review at one appointment will be limited to five. + 3. You may make copies of a file when the copier i.s not in'use by the staff and if time permits. There is no charge for 25 or less copies.: cost per copy after the initial 25 is 2.5 per copy. Payment is to be made by check, money order, or cash in the administrative offices. 4. Files must be kept in the order you received them. Files may not be taken from the office. No briefcases, large totes, etc. are permitted in the file review area., To remove,'alter,. deface, mutilate, or destroy material in public files is a misdemeanor for which you can be fined up to $500.00.' 5. In accordance with GS 25-3-512, a $25.00 processing fee will be charged and collected for checks on which payment has been refused. 6. The customer must present a photo ID, sign -in, and receive a visitor sticker prior to reviewing files. FACILITY NAME 1. 2. 3. 5. Jlw 0'Z tcf Signature/Name of Fi or Business Date Time In (Please attach business card to form if available) # Copes: �� Amt. Pd: 0 COUNTY Time Out For DENR Use ONLY Reviewer: North Carolina Department of Environment and submit: Natural Resources NCDENR Request for Express Permit Review 'rime: Confirm: FILL-IN all the information below and CHECK the Permit(s) you are requesting for express review. FAX or Email the completed form to Express Coordinator along with a completed DETAILED narrative, site plan (PDF file) and vicinity map (same items expected in the application package of the project location. Please include Mis 11br ,, in the application package. • Asheville Region Alison Davidson 828-296-4698;alison.davidsonflIncdenr aov • Fayetteville or Raleigh Region -David Lee 919-7914203, david.leeftcdenr aov • Mooresville & -Patrick Grogan 704-663-3772 or patri korooan(OAcdenr pov • Washington Region -Lyn Hardison 252 946-9215 or Iyn.hardisoniftedenr aov • Wilmington Region -Janet Russell 910-350-2004 orianetrussell®Acdenr aov NOTE: Project application received after 12 noon will be stamped in the following work day. Project Name: CFCC NORTH CAMPUS CARPENTRY FACILITY County: NEW HANOVER Applicant: KEN PEARCE Company: CAPE FEAR COMMUNITY COLLEGE Address: 411 NORTH FRONT STREET City: WILMINGTON, State: NC Zip: 28401-_ Phone: 910-362- 0�04 Fax: _ _ Email: koearce dec.edu Physical Location:5000 SIDBURY ROAD Permits of request SW SW SW SW SW Project Drains into UT PRINCE GEORGE CREEK waters — Water classification QSW (for classification see- hftR://b2o.enr.state.nc.us/bimstreportsireportsWB.htmI Project Looted in CAPE FEAR River Basin. Is project draining to class ORW waters? N , within % mile and draining to class SA waters N or within 1 mile and draining to class HQW waters? N Engineer/Consultant: MONICA LOUGHLIN Company: URBAN, LTD. RECEIVED Address:108 NORTH KERR AVENUE, SUITE K-1 City: WILMINGTON, State: NC zip: 28405- U5_ FEB 0 2 2011 Phone: 910-395- , Fax: ` -1451, Email: mlouchiin�urban-itd.com SECTION ONE: REQUESTING A SCOPING MEETING ONLY BY: ® Scoping Meeting ONLY ® DWQ, ❑ DCM, ❑ DLR, ❑ OTHER: SECTION TWO: CHECK ONLY THE PROGRAM (S) YOU ARE REQUESTING FOR EXPRESS PERMITTING ❑ 401 Unit ❑ Stream Origin Determination: _ # of stream calls - Please attach TOPO map marking the areas in questions ❑ IntermittenUPerennial Determination: _ # of stream calls — Please attach TOPO map marking the areas in questions ❑ 401 Water Quality Certification ❑ Isolated Wetland (___linear ft or _acres) ❑ Riparian Buffer Authorization ❑ Minor Variance ❑ Major General Variance 6a State Stormwater ❑ General ❑ SFR, ❑ SFR < 1 ac. ❑Bkhd & Bt Rmp, ❑ Clear & Grub, ❑ Utility ❑ Other ® Low Density ❑ Low Density -Curb & Gutter _ # Curb Outlet Swales ❑ Off -site [SW (Provide permit #)] ❑ High Density -Detention Pond _ # Treatment Systems ❑ High Density -Infiltration _ #Treatment Systems ❑ High Density -Bio-Retention _ # Treatment Systems ❑ High Density —SW Wetlands _ # Treatment Systems El High Density -Other _ # ,Treatment Systems ; ❑ MOD:❑ Major ❑ Minor ❑ Plan Revision ❑ Redev. Exclusion SW (Provide permit #) ❑ Coastal Management ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information ❑ Upland Development ❑ Marina Development ❑ Urban Waterfront ❑ Land Quality ❑ Erosion and Sedimentation Control Plan with _ acres to be disturbed.(CK # (for DENR use)) SECTION THREE — PLEASE CHECK ALL THAT IS APPLICABLE TO YOUR PROJECT (for both scopin4 and express meeting request) Wetlands on Site ® Yes ❑ No Wetlands Delineation has been completed: ❑ Yes ❑ No US ACOE Approval of Delineation completed: ❑ Yes ❑ No Received from US ACOE ❑ Yes ❑ No Buffer Impacts: ❑ No ❑ YES: —acre(s) Isolated wetland on Property ❑ Yes ❑ No 404 Application in Process w/ US ACOE: ❑ Yes ❑ No Permit For DENR use only Fee Split for multiple permits: (Check # f SUBMITTAL DATES Fee SUBMITTAL DATES Fee CAMA $ Variance (❑ Maj; ❑ Min) $ SW (El HD, ❑ LD, Gen) $ 407: $ LQS $ Stream Deter_ $ NCDENR EXPRESS March 2009 PCL XL error Subsystem: KERNEL Error: IllegalOperatorSequence Operator: SetNeutralAxis Position STORMWATER NARRATIVE THE SITE HAS WOODLANDS WITH AN ASPHALT PARKING AND ACCESS AREA. THE SITE IS BOUNDED BY SIDBURY ROAD TO THE NORTH; 1-40 TO THE EAST; AND INSTITUTIONAL AND VACANT USES TO THE SOUTH AND WEST. THE SITE IS LOCATED IN A SPECIAL 100-YEAR FLOOD HAZARD AREA. THE SITE IS NEARLY LEVEL SANDY SOILS WITH POORLY DRAINED SOILS. THE PROJECT IS NEW DEVELOPMENT CONSISTING OF CLEARING, GRADING AND THE CONSTRUCTION OF A TWO (2) BUILDINGS, ASPHALT AND GRAVEL PARKING AND ACCESS, AND A STORM WATER MANAGEMENT SYSTEM. THE DISTURBED AREA IS APPROXIMATELY 1.3 ACRES. THE PROJECT DRAINS TO THE CAPE FEAR RIVER BASIN THROUGH AN UNNAMED TRIBUTARY TO PRINCE GEORGE CREEK WHICH HAS A C; Sw CLASSIFICATION AND STREAM INDEX NO. 18-74-53. THERE IS NO DIRECT DISCHARGE FROM IMPERVIOUS SURFACES TO A WATERCOURSE. i � � Sr�y.1338 ;Ywa^ ^!� RECEIVED FEB 0 '2 2011 BY: STORMWATER NARRATIVE THE SITE HAS WOODLANDS WITH AN ASPHALT PARKING AND ACCESS AREA. THE SITE IS BOUNDED BY SIDBURY ROAD TO THE NORTH; 1-40 TO THE EAST, AND INSTITUTIONAL AND VACANT USES TO THE SOUTH AND WEST. THE SITE IS LOCATED IN A SPECIAL 100-YEAR FLOOD HAZARD AREA. THE SITE IS NEARLY LEVEL SANDY SOILS WITH POORLY DRAINED SOILS. THE PROJECT IS NEW DEVELOPMENT CONSISTING OF CLEARING, GRADING AND THE CONSTRUCTION OF A TWO (2) BUILDINGS, ASPHALT AND GRAVEL PARKING AND ACCESS, AND A STORM WATER MANAGEMENT SYSTEM. THE DISTURBED AREA IS APPROXIMATELY 1.3 ACRES. THE PROJECT DRAINS TO THE CAPE FEAR RIVER BASIN THROUGH AN UNNAMED TRIBUTARY TO PRINCE GEORGE CREEK WHICH HAS A C;Sw CLASSIFICATION AND STREAM INDEX NO. 18-74-53. THERE IS NO DIRECT DISCHARGE FROM IMPERVIOUS SURFACES TO A WATERCOURSE. REC::TErlIVED FEB 0"2 ZU31 BY: PCL XL error Subsystem: KERNEL Error: IllegalOperatorSequence Operator: SetNeutralAxis Position: 3 't\ I f � c� V, 0. RECEIVED I FEB 0-2 2011 BY• — srra DAZE DESCRIPTIDN BY ROMONS Q20D4 ANDREW dt WSKE OWNER/DEVELOPERDRAINAGE BASIN : I I NAME ADDREN CRY a, WATE CFCC TRUCK FACILITY PIE WILMINGTON, NORTH CAROLINA � £ :uoilisod sixdjej;naNlag :jo;ejado aou9nb9Sjo4ejadoje6ajjj :JOJJ3 13Nb3X :walsAsgng Jorra IX 10d C 6, VICINITY MAP SCALE: 1 "=1000' Russell, Janet From: Lewis, Linda Sent: Monday, February 07, 2011 10:29 AM To: Loughlin, Monica Cc: Russell, Janet Subject: CFCC Carpentry Facility Monica: I finally had an opportunity to look at all of the old plans and previously approved plans for CFCC North Campus under SW8 990923. 1 found the original 1999 overall map and drainage area map that had only 3 ponds. The area of the proposed carpentry facility is located within the North Campus project area, but was not located within the drainage area of any of the three ponds. However a fourth pond was added in 2004 for the Truck Facility. The drainage area for the fourth pond includes that portion of the access loop road up to Sidbury Road. It wiii not be possibie to permit the Carpentry Facility as a low density project under a separate permit as it is located on the high density North Campus property. It would necessarily be a matter of modifying the current permit to either add the Carpentry Facility to the drainage area of the 4t pond, or propose a separate high density treatment device.(the 5th BMP) to be added to the existing 4 BMP's already permitted under the 990923 permit. If you need to review/make copies of the drainage area maps in the file, please let Janet know so she can make the necessary arrangements. Linda Please note my new email address is Linda.Lewis@ncdenr.00v Linda Lewis NC Division of Water Quality 127 Cardinal Drive Ext. Wilmington, NC 28405 910-796-7215 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties.