HomeMy WebLinkAboutNCC191612_Notice of Termination_20201111Action History (UTC-05:00) Eastern Time (US & Canada)
Submit by Anonymous User 11/11/2020 7:23:26 AM (NOT Submittal)
Approve by Georgoulias, Bethany 11/12/2020 8:03:26 AM (NOT Request Review- NCC191612)
p Recognized final inspection reports from the City of Asheville (not third party).
• The task was assigned to Georgoulias, Bethany. The due date is: November 16, 2020 5:00 PM
11/11/2020 7:23 AM
1 �
NORTH CAROLINA
Enrlronmenral Quallly
Certificate of NCC191612
Coverage (COC) Enter the Certificate of Coverage Nmber
No.*
Information associated with this permit
Project Name
GE Aviation Parking Lot Expansion
Address
502 Sweeten Creek Industrial Park Road, Asheville, NC
County
Buncombe
Latitude
35.5490
Longitude
-82.5120
Permittee Listed
GE Aviation
Legally Responsible
Shane Pope
Individual
NC Reference No.
NCG01-2019-1612
E&SC Plan ID
19-04700
Original NOI
15318
Tracking No.
Date COC Issued
8/27/2019
Prior Rescission
Cate populates only if COCwas already rescinded at tirre of subrrittal.
Date
Reason for Rescission/Termination Request:
Reason for F Project Closed -Out
Termination of r Sale (Another Owner/Operator will apply for a new COC)
Coverage * O Mistake or Invalid Coverage
r Other
Addional We inforrration about the basis of this request, if needed.
Explanation
Supporting upload Supporting Docurrentation if applicable.
Documentation Mist beFDFforrrat
Project Close-out Information:
Final Close-out 5/4/2020
Inspection Approval
Project Close-out GE Grading Final from City of Asheville.pdf 40.68KB
Approval GE Stormwater Final from City of Asheville.pdf 83.08KB
Documentation
Mast be FDFforrrat
North Carolina General Statute 143-215.66 (1) provides that:
Anyperson who knowinglymakes any false statement, representation, or certification in anyapplication, record, report, plan, or other
documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement
of a material fact in a rulemaking proceeding or contested case underthis Article; or who falsifies, tampers with, or knowingly renders
inaccurate any recording or monitoring deice or method required to be operated or maintained under this Article or rules ofthe
Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to exceed ten thousand
dollars ($10,000).
17 I, as an authorized representative, hereby request rescission of coverage under
the NPDES Stormwater Permit for the subject facility. I am familiar with the
information contained in this request and to the best of my knowledge and
belief such information is true, complete and accurate.
*This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a
president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B,
Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B,
Item (6) of that permit.
Signature
Type Name* Shane Pope
Title * Facilities Engineer
Organization* GE Aviation
Date * 11 /11 /2020
Email for shane.pope@ge.com
Confirmation *
Contact Telephone* 8284245057
NOT Certification NCG01-eNOT-Certification-Form-20190508-
Form 264.21 KB
DEMLR-SW.pdf
Mist be FDF Forrrat
Is this COC Already Ensure this CCChas not been rescinded since subrrittal!
Rescinded?
Original Permittee 0Cd on Wification BTails
Email Shane.Pope@ge.com
Original Site Contact CCd on Notificaiton Broils
Email Shane.Pope@ge.com